  • 摘要: 小断面隧道向大断面隧道转换是隧道施工面临的难点之一。文章依托深圳地铁2131标新莲区间工程,研究由G5小断面隧道向C5大断面隧道转换施工优化方案,并采用三维有限元方法计算分析不同施工工法的优劣性,将计算结果和监测数据进行对比分析,结果表明,纵向爬坡挑顶施工方法能更好地控制隧道施工后围岩变形和地表沉降,可尽量避免因破碎围岩纵向挤压造成的初期支护变形开裂,从而降低施工风险。

     

    Abstract: The transition from small section tunnel to large section tunnel is one of the difficulties in tunnel con? struction. Based on the Xinlian running tunnel section of Shenzhen metro lot 2131, this paper studies the construction scheme optimization for transformation from G5 small-section tunnel to C5 large-section tunnel, uses three-dimensional finite element method to calculate and analyze the advantages and disadvantages of various construction methods, and compares the calculation results with monitoring data. The results show that using the construction method of longitudinal climbing and roof-ripping, it can better control the deformation of surrounding rock and ground settlement after tunnel construction, avoid the initial support deformation and cracking caused by the longitudinal extrusion of fractured surrounding rocks as far as possible and reduce the construction risk.

     

/

返回文章
返回