盾构隧道施工刀盘状态实时监测系统研制
(1 北京工业大学城市防灾与减灾教育部重点实验室,北京 100124;2中国中铁工程装备集团有限公司,郑州 450016;3北京玖瑞科技有限公司,北京 100107)
Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling
(1 Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology, Beijing 100124; 2 China Railway Engineering Equipment Group Co., Ltd., Zhengzhou, 450016; 3 Beijing JiuRui Technologies Co., Ltd.,Beijing 100107)
Download: PDF (5362KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 盾构隧道施工中,由于盾构刀盘后面为有压舱,刀盘工作处于“黑箱”状态。为了实时监测盾构掘进过程中刀盘滚刀及刀盘整体的工作状态,研发了一套盾构隧道施工刀盘状态实时监测系统。该系统由传感器、控制与数据传输及算法与显示三个子系统组成;传感器子系统集成了自制的滚刀磨损量与转速传感器、温度传感器、数据采集模块和电源;集成的传感器安装于刀盘滚刀刀箱内,可实时监测滚刀的磨损量、转速与刀盘的温度。采集的数据通过有线或无线传输到中心端,再通过有线方式传送给上位机。上位机软件集成了盾构设计参数及隧道地层参数、盾构施工参数、传感器监测参数,可实时显示传感器采集的参数,并结合地层条件与盾构施工参数综合判定盾构刀盘工作状态,预测滚刀使用寿命。经过实验室测试、工厂测试,结果表明该系统满足设计要求,可用于盾构刀盘工作状态监测。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
龚秋明 1 王庆欢 1 王杜娟 2 邱海峰 3 吴 帆 1
关键词:   
Abstract: During the shield tunnelling, the cutterhead is in a black box state because the chamber behind the cut? terhead is pressurized. In order to monitor the working state of the disk cutters and cutterhead in real time, a realtime monitoring system of cutterhead conditions in shield tunnelling is developed. The system consists of three subsystems, namely the sensor subsystem, control and data transmission subsystem, algorithm and display subsystem.The sensor subsystem integrates the self-made disk cutter wear sensor, disk cutter rotation speed sensor, temperature sensor, data acquisition module and power supply unit. The integrated sensors are mounted in the disk cutter housings on the cutterhead to monitor the disc cutter wear and rotation speed and cutterhead temperature in real time. The collected data is transmitted to the central end through wire or wireless modes, and then transmitted to the upper computer by wire. The software of the upper computer integrates the shield design parameters, stratum parameters, shield driving parameters and sensor monitoring parameters, by which it can display the parameters monitored by these sensors in real time, comprehensively determine the working condition of the cutterhead and predict the service life of the disc cutters. Through laboratory testing and factory testing, this system is proven to meet the design requirements and can be used for monitoring the working state of shield cutterhead.
KeywordsShield machine,   Cutterhead condition,   Disc cutter wear,   Disc cutter rotation speed,   Real-time monitor? ing system     
基金资助:基金项目:国家重点基础研究发展计划(973计划)(2015CB058103)
作者简介: 作者简介:龚秋明(1969-),男,博士,教授,主要从事掘进机、盾构机方面的研究工作,E-mail:gongqiuming@bjut.edu.cn.
引用本文:   
龚秋明 1 王庆欢 1 王杜娟 2 邱海峰 3 吴 帆 1 .盾构隧道施工刀盘状态实时监测系统研制[J]  现代隧道技术, 2021,V58(2): 41-50
GONG Qiuming1 WANG Qinghuan1 WANG Dujuan2 QIU Haifeng3 WU Fan .Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 41-50
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I2/41
 
没有本文参考文献
[1] 于 介.红粘土与砂岩夹泥岩接触带隧道合理施工工法研究[J]. 现代隧道技术, 2021,58(2): 174-181
[2] 吴建成.长距离复杂航线下沉管管节拖航研究[J]. 现代隧道技术, 2021,58(2): 145-150
[3] 雷升祥 1 王 飞 2 于 介 2 邵生俊 3 梁庆国 4.浅谈黄土隧道未来技术发展[J]. 现代隧道技术, 2021,58(2): 1-7
[4] 张俊锋 1 李 强 2 史永跃 2 吴 磊 2.西南某隧道岩溶水发育规律及涌水量预测[J]. 现代隧道技术, 2021,58(2): 14-21
[5] 周文俊.天平线关山隧道涌水量预测技术研究[J]. 现代隧道技术, 2021,58(2): 22-30
[6] 许学良 1,2 马伟斌 1,2 蔡德钩 1,2 安哲立 1,2 柴金飞 1,2.铁路隧道全生命周期检测监测体系研究[J]. 现代隧道技术, 2021,58(2): 31-40
[7] 黄基富 肖功夷.悬臂掘进机在交通隧道施工中的实践应用与适应性研究[J]. 现代隧道技术, 2021,58(2): 51-62
[8] 王春河 1,2 朱福强 3 罗 兴 4 张传奎 1,2 田军令 3 李贺朋 2 郭翼飞 4.隧道改扩建工程施工风险评估研究[J]. 现代隧道技术, 2021,58(2): 63-70
[9] 张自光 1,2 曹广勇 1,2 李建立 3 翟朝娇 1,.上软下硬地层地铁隧道安全覆岩厚度研究[J]. 现代隧道技术, 2021,58(2): 71-77
[10] 文 旭 1 裴向军 1 裴 钻 1 杨海龙 1 陈臻林 1 张以晨 2.长白山景区棚洞结构设计及安全性研究[J]. 现代隧道技术, 2021,58(2): 151-157
[11] 吴 波 1,2 彭逸勇 1,2 蒙国往 1,2 濮松权 3.软土地层大断面矩形顶管施工引起切口前方地表隆起分析[J]. 现代隧道技术, 2021,58(2): 86-92
[12] 胡长明 1,2 李 靓 1 梅 源 1,2 袁一力 1 王志宇 1.盾构竖向姿态预测模型参数的全局敏感性分析[J]. 现代隧道技术, 2021,58(2): 127-134
[13] 高 鑫 王文娟.远场静水压力作用下深埋隧道双层叠合衬砌合理组合形式及力学变形特性研究[J]. 现代隧道技术, 2021,58(2): 93-102
[14] 喻洪平 1 苏培东 2 赵天彪 3 陈德君 1 徐学渊 1 杜宇本 1.西成客专黄家梁隧道原油和有害气体来源及危害研究[J]. 现代隧道技术, 2021,58(2): 182-187
[15] 范燕波 1, 2 陈 丽 3 史江伟 1, 2 丁 楚 1, 2 张 显 1, 2.砂土地层深基坑开挖引起下卧隧道变形机理研究[J]. 现代隧道技术, 2021,58(2): 103-110
Copyright 2010 by 现代隧道技术