第三系泥岩工程特性与仰拱施工技术研究
(1中铁隧道集团二处有限公司,廊坊 065201;2中铁隧道局集团有限公司,广州 511458)
Study on Engineering Characteristics of Tertiary Mudstone and Construction Technology of Inverted Arch
(1 Erchu Co., Ltd. of China Railway Tunnel Group, Langfang 065201; 2 China Railway Tunnel Group Co., Ltd., Guangzhou 511458)
Download: PDF (2520KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  针对隧道仰拱施工期间地下水汇聚和开挖扰动造成第三系泥岩软化强度降低的问题,通过现场取样进行室内试验,研究结果表明,第三系泥岩在自然状态下的单轴抗压强度和含水率呈反相关关系,饱和状态下的单轴抗压强度明显降低,软化效果明显,软化后地基承载力不能满足设计要求。施工中对不同路径的水流实行分类归集以降低水对围岩的劣化影响,基底回填碎石注浆加固措施解决了仰拱开挖后渗水通道和围岩扰动软化问题,后期 注浆加固后也有效解决了地基承载力不足的问题。富水地段增设独立纵横向排水系统使仰拱基底积水在达到压力条件下能够及时排出,避免了运营后由于地下水的影响导致基岩软化可能造成的基底病害。该技术在浩吉铁路中条山隧道得到了较好的应用效果。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张献伟 1 洪开荣 2 常 翔 2 陈 鸿 1
关键词:   
Abstract: To solve the problem of softening and strength decrease of tertiary mudstone due to groundwater conver? gence and excavation disturbance during the inverted arch construction of a tunnel, the laboratory test is carried out by field sampling. The results show that the uniaxial compressive strength of the tertiary mudstone in the natural state is negative correlated with the water content, the uniaxial compressive strength of the mudstone in the saturated state is obviously reduced with obvious softening effect, and the bearing capacity of the foundation after softening cannot meet the design requirements. In view of this, the water flows in different paths are classified and collected to reduce their deterioration effect on the surrounding rocks during the construction. The measures such as backfilling of the base with gravels and grouting reinforcement can solve the problems of seepage channel and surrounding rocks softening due to excavation disturbance of inverted arch, and the problem of insufficient bearing capacity of foundation is also effectively solved through the grouting reinforcement in the later period. Moreover, the indepen? dent vertical and horizontal drainage systems are added in the water-rich sections, so that the water accumulated in the base of the inverted arch can be drained in time when the pressure condition is met, thus avoiding the possible basement diseases caused by bedrock softening due to the effect of groundwater after operation.
KeywordsRailway tunnel,   Tertiary mudstone,   Engineering characteristics,   Base structure,   Grouting reinforce? ment,   Independent drainage     
作者简介: 作者简介:张献伟(1971-),男,高级工程师,主要从事隧道及地下工程施工技术管理工作,E-mail:635848568@qq.com.
引用本文:   
张献伟 1 洪开荣 2 常 翔 2 陈 鸿 1 .第三系泥岩工程特性与仰拱施工技术研究[J]  现代隧道技术, 2021,V58(2): 214-219
ZHANG Xianwei1 HONG Kairong2 CHANG Xiang2 CHEN Hong1 .Study on Engineering Characteristics of Tertiary Mudstone and Construction Technology of Inverted Arch[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 214-219
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I2/214
 
没有本文参考文献
[1] 于 介.红粘土与砂岩夹泥岩接触带隧道合理施工工法研究[J]. 现代隧道技术, 2021,58(2): 174-181
[2] 吴建成.长距离复杂航线下沉管管节拖航研究[J]. 现代隧道技术, 2021,58(2): 145-150
[3] 雷升祥 1 王 飞 2 于 介 2 邵生俊 3 梁庆国 4.浅谈黄土隧道未来技术发展[J]. 现代隧道技术, 2021,58(2): 1-7
[4] 张俊锋 1 李 强 2 史永跃 2 吴 磊 2.西南某隧道岩溶水发育规律及涌水量预测[J]. 现代隧道技术, 2021,58(2): 14-21
[5] 周文俊.天平线关山隧道涌水量预测技术研究[J]. 现代隧道技术, 2021,58(2): 22-30
[6] 龚秋明 1 王庆欢 1 王杜娟 2 邱海峰 3 吴 帆 1.盾构隧道施工刀盘状态实时监测系统研制[J]. 现代隧道技术, 2021,58(2): 41-50
[7] 许学良 1,2 马伟斌 1,2 蔡德钩 1,2 安哲立 1,2 柴金飞 1,2.铁路隧道全生命周期检测监测体系研究[J]. 现代隧道技术, 2021,58(2): 31-40
[8] 黄基富 肖功夷.悬臂掘进机在交通隧道施工中的实践应用与适应性研究[J]. 现代隧道技术, 2021,58(2): 51-62
[9] 王春河 1,2 朱福强 3 罗 兴 4 张传奎 1,2 田军令 3 李贺朋 2 郭翼飞 4.隧道改扩建工程施工风险评估研究[J]. 现代隧道技术, 2021,58(2): 63-70
[10] 张自光 1,2 曹广勇 1,2 李建立 3 翟朝娇 1,.上软下硬地层地铁隧道安全覆岩厚度研究[J]. 现代隧道技术, 2021,58(2): 71-77
[11] 文 旭 1 裴向军 1 裴 钻 1 杨海龙 1 陈臻林 1 张以晨 2.长白山景区棚洞结构设计及安全性研究[J]. 现代隧道技术, 2021,58(2): 151-157
[12] 吴 波 1,2 彭逸勇 1,2 蒙国往 1,2 濮松权 3.软土地层大断面矩形顶管施工引起切口前方地表隆起分析[J]. 现代隧道技术, 2021,58(2): 86-92
[13] 胡长明 1,2 李 靓 1 梅 源 1,2 袁一力 1 王志宇 1.盾构竖向姿态预测模型参数的全局敏感性分析[J]. 现代隧道技术, 2021,58(2): 127-134
[14] 高 鑫 王文娟.远场静水压力作用下深埋隧道双层叠合衬砌合理组合形式及力学变形特性研究[J]. 现代隧道技术, 2021,58(2): 93-102
[15] 喻洪平 1 苏培东 2 赵天彪 3 陈德君 1 徐学渊 1 杜宇本 1.西成客专黄家梁隧道原油和有害气体来源及危害研究[J]. 现代隧道技术, 2021,58(2): 182-187
Copyright 2010 by 现代隧道技术