地铁隧道盾构掘进对上跨地道基坑稳定性影响研究
1 内蒙古大学交通学院,呼和浩特 010070;2 内蒙古综合交通科学研究院,呼和浩特 010050;3 同济大学道路与交通工程教育部重点实验室,上海 201804)
Research on the Impact of Subway Shield Tunnelling on the Stability of Overcrossing Underpass Foundation Pit
(1 Transportation Institute of Inner Mongolia University, Hohhot 010070; 2 Research Institute of Integrated Transportation Science of Inner Mongolia, Hohhot 010050; 3 Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University,Shanghai 201804)
Download: PDF (4316KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 地铁隧道盾构掘进对上跨基坑变形稳定特性和施工安全控制有着显著影响。文章依托呼和浩特市在建地道与在建地铁2号线“十”字交叉工程,通过数值模拟和实测监控对比分析,研究地铁隧道盾构掘进过程对上跨地道基坑稳定性影响规律。结果表明:受地铁下穿影响,基坑围护墙发生沉降和向基坑内侧变形,钢支撑轴力变化较小,主要以沉降变形为主,未加固时最终沉降累计值达16 mm;基坑下土体加固可显著减小基坑支护结构变形,沉降值可减少为未加固时的30%。有限元建模数值分析能够反映地铁下穿对基坑支护结构变形影响的一般规律,可为基坑围护结构的设计提供一定的理论依据。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张 宏 1
2 刘海洋 1
3
关键词:   
Abstract: The subway shield tunnelling has a significant impact on the deformation stability and construction safe? ty of the foundation pit of the overpassing underpass. Based on the intersection project between the under-construction underpass and the under-construction Metro Line 2 in Hohhot, this paper studies the impact of subway tunnel shield tunnelling on the stability of overpassing underpass foundation pit through the comparative analysis of numerical simulation and actual measurement and monitoring data. The results show that the retaining wall of the foundation pit is affected by the under-passing construction of the subway tunnel, resulting in settlement and deformation to the inner side of the foundation pit, and the change in the axial force of the steel strut is limited, mainly in the form of settlement, with the accumulative final settlement at about 16 mm under no reinforcement condition; the soil reinforcement under the pit can significantly reduce the deformation of the foundation pit support structure, and in particular, the settlement value can be reduced to 30% of that under no reinforcement condition. The numerical analy? sis by finite element modeling can reflect the general law of the effect of the under-passing subway tunnel construction on the deformation of the foundation pit support structure, which can provide a certain theoretical basis for the design of retaining walls of foundation pits.
KeywordsSubway tunnel,   Shield tunnelling,   Deformation of foundation pit,   Numerical simulation,   Actual mea? surement and monitoring     
基金资助:国家自然科学基金项目(51468047);内蒙古自然科学基金项目(2015MS523,2016MS0531);内蒙古交通科技项目(NJ2012-10).
作者简介: 张 宏(1978-),男,博士,教授,硕士生导师,主要从事寒旱区道路工程与环境岩土方向的研究工作,E-mail: zhanghong3537@126.com.
引用本文:   
张 宏 1, 2 刘海洋 1, 3 .地铁隧道盾构掘进对上跨地道基坑稳定性影响研究[J]  现代隧道技术, 2021,V58(4): 125-132
ZHANG Hong1, 2 LIU Haiyang1, 3 .Research on the Impact of Subway Shield Tunnelling on the Stability of Overcrossing Underpass Foundation Pit[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 125-132
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I4/125
 
没有本文参考文献
[1] 王志杰 1 李金宜 1 蒋新政 1 李 振 1 曾 青 2 王 宁 2.浅埋偏压双侧近接隧道影响分区及对策研究[J]. 现代隧道技术, 2021,58(4): 1-11
[2] 王文娟 高 鑫.高水压作用下深埋隧道双层叠合衬砌稳定性影响因素研究[J]. 现代隧道技术, 2021,58(4): 12-20
[3] 于 丽 1,2 孙 源 1,2 王明年 1,2.寒区隧道抗冻设防长度的计算方法研究[J]. 现代隧道技术, 2021,58(4): 21-28
[4] 秦尚友 1 陈佳耀 2 张东明 2 杨同军 1 黄宏伟 2 赵 帅 2.基于深度学习的隧道工作面岩石结构自动化判别[J]. 现代隧道技术, 2021,58(4): 29-36
[5] 李鹏举 1 郑方坤 2 吕建兵 3 吴维俊 3 刘 锋 3 陈贡发 3.基于大数据迁移学习的灰岩地区排水孔淤堵自动识别技术[J]. 现代隧道技术, 2021,58(4): 37-47
[6] 宋福彬 1 杨 杰 1 程 琳 1 吕 高 1, 2 宋 洋 1.地质雷达正演在隧洞衬砌病害识别中的应用[J]. 现代隧道技术, 2021,58(4): 48-56
[7] 翟 强 顾伟红 荆肇秦.地铁联络通道冻结法施工安全风险评价[J]. 现代隧道技术, 2021,58(4): 57-66
[8] 叶 飞 1 何 彪 1 田崇明 1 王思宇 1 王 坚 1 宋桂锋 2.三乙醇胺早强剂研究进展及在隧道工程中的应用展望[J]. 现代隧道技术, 2021,58(4): 67-78
[9] 谢 军 1,2 倪雅静 2 胡英飞 2 包淑贤 2 李延涛 1.振动台试验模型箱的研究进展[J]. 现代隧道技术, 2021,58(4): 79-85
[10] 惠 强 1 张 军 2 姜海波 1.深埋高地应力水工隧洞节理岩体开挖塑性区特征及分布规律研究[J]. 现代隧道技术, 2021,58(4): 86-94
[11] 张莉莉 1 郎松军 1 邓 林 2 臧 程 3.季冻区隧道砂岩三轴压缩力学特性及损伤本构模型研究[J]. 现代隧道技术, 2021,58(4): 95-103
[12] 李心熙 1 禹海涛 2 李春元 3 于晓东 4 徐 磊 5.沉管隧道暗埋段三维大规模地震响应分析[J]. 现代隧道技术, 2021,58(4): 104-108
[13] 冯 义.基于动荷载的交叠盾构隧道两阶段安全分析[J]. 现代隧道技术, 2021,58(4): 109-116
[14] 王 博 1 郑鹏飞 1 胡江洋 1 刘军勇 1 刘 硕 2.近距离平行盾构隧道施工数值模拟及影响因素分析[J]. 现代隧道技术, 2021,58(4): 117-124
[15] 鄢豪杰 郑俊杰 潘 雨 陈鹏飞.盾构隧道开挖引起邻近桩基响应的时空效应[J]. 现代隧道技术, 2021,58(4): 133-140