岩质地层盾构掘进施工控制参数分析
(1 中铁九局集团第四工程有限公司,沈阳 110000;2 华东交通大学铁路环境振动与噪声教育部工程研究中心,南昌 330013;3 华东交通大学土木工程国家级实验教学示范中心,南昌 330013)
Analysis of Construction Control Parameters in Rock Shield-driven Tunnelling
(1 The Fourth Engineering Co., Ltd, of China Railway No.9 Engineering Group Co., Ltd., Liaoning 110000; 2 Railway Noise and Vibration Environment Engineering Research Center of the Ministry of Education, East China Jiaotong University, Jiangxi 330013;3 National Demonstration Center for Experimental Civil Engineering Education, East China Jiaotong University, Nanchang, Jiangxi 330013)
Download: PDF (2286KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 盾构机掘进施工参数的影响因素繁多,盾构机各参数之间的相关性研究主要以理论分析为主,盾构掘进施工参数的影响因素与影响机制难以阐明。文章对大连岩质地层中土压平衡盾构掘进施工控制参数进行了收集与分析,结果表明:盾构机的总推力与顶推速度、刀盘转速与刀盘扭矩以及螺旋输送机转速与其扭矩的相关性均不显著;因岩质地层中土拱效应明显,盾壳与围岩之间的摩阻力较小,总推力主要用于提供刀盘与开挖面之间的水平相互作用力;盾构机的螺旋输送机转速与盾构机顶推速度之间的相关性显著;螺旋输送机通过转速来调整土舱饱满度,进而影响开挖面上被切削的土体进入土舱内的难易程度,因此螺旋输送机的渣土输出效率对顶推速度与刀盘扭矩影响明显。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
尹苏江 1 严仕舜 1 裴柏铮 1 黄大维 2
3
关键词:   
Abstract: There are many factors influencing the construction parameters in shield tunnelling, and regarding the re? search on correlation among the construction parameters in shield tunnelling it is mainly based on theoretical analysis. It is difficult to clarify the influencing factors and mechanism of the construction parameters in shield tunnelling. This paper collects and analyzes the construction control parameters during EPB shield tunnelling in rock strata in Dalian, and the results show that: the correlation between the total thrust and advancing speed, the cutterhead rotation speed and torque, and the screw conveyor rotation speed and torque are all not significant; due to the significant soil arch effect in rock strata and thus the low frictional resistance between the shield shell and the surrounding rock, the total thrust is mainly used to provide the horizontal interaction between the cutterhead and the excavation face; the correlation between the rotation speed of the screw conveyor and the advancing speed of the shield machine is significant; the screw conveyor controls the fullness of the soil chamber through the rotation speed, influencing the excavated soils entering the chamber, so the muck discharge efficiency of the screw conveyor has a significant effect on the advancing speed and cutterhead torque.
KeywordsShield tunnel,   Rock strata,   Construction control parameters     
基金资助:国家自然科学基金项目(52078213);江西省青年科学基金重点项目(20192ACBL21003);江西省交通运输厅科技项目(2020Z0001).
作者简介: 尹苏江(1979-),男,高级工程师,主要从事城市轨道盾构掘进施工技术与管理工作,E-mail:898514387@qq.com. 通讯作者:黄大维(1984-),男,博士,副教授,主要从事盾构隧道设计与施工相关理论与技术研究工作,E-mail:308372891@qq.com.
引用本文:   
尹苏江 1 严仕舜 1 裴柏铮 1 黄大维 2, 3 .岩质地层盾构掘进施工控制参数分析[J]  现代隧道技术, 2021,V58(4): 218-223
YIN Sujiang1 YAN Shishun1 PEI Baizheng1 HUANG Dawei2, 3 .Analysis of Construction Control Parameters in Rock Shield-driven Tunnelling[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 218-223
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I4/218
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术