[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2021, Vol. 58 Issue (5) :244-251    DOI:
材料与设备 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
功能外加剂对隧道二次衬砌拱顶充填砂浆性能的影响
(1陕西省高性能混凝土工程实验室,渭南 714099;2 陕西铁路工程职业技术学院测绘与检测学院,渭南 714099;3中铁一局集团陕西卓信工程检测有限公司,西安,710199)
Effect of Functional Admixtures on the Performances of Mortars Filling behind Tunnel Vault Secondary Lining
(1 Shaanxi Engineering Laboratory of High Performance Concrete, Weinan 714099; 2 School of Surveying and Testing, Shaanxi Railway Institute, Weinan 714099; 3 Shaanxi Zhuoxin Engineering Testing Co., Ltd. of China Railway First Group Co., Ltd., Xi′an 710199)
Download: PDF (2631KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为了解决隧道二次衬砌拱顶脱空等问题,基于铁路隧道二次衬砌充填砂浆基本性能要求,在OPC∶SAC=0.65∶0.35,胶砂比=0.55∶0.45,水料比为0.18,粉煤灰掺量为10%的基础上,通过流动度、泌水率、强度、膨胀性和干缩性等方面,开展功能外加剂对充填砂浆性能影响的研究。结果表明:酒石酸掺量为0.3%,碳酸锂掺量为0.2%,塑性膨胀剂掺量为0.06%,消泡剂掺量为0.15%,保水增稠剂掺量为0.12%,可制备出工作自密实、不泌水、不离析、早期强度高、后期强度高、微膨胀的充填砂浆;充填砂浆与衬砌混凝土结合性试验、施工现场雷达无损检测和拱顶钻芯结果表明,充填砂浆与隧道二次衬砌混凝土结合性好,可减少隧道二次衬砌背后脱空情况,避免了衬砌充填材料与二次衬砌混凝土“两张皮”现象。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
彭 磊 1
2 何文敏 1
2 惠海涛 3 李炳良 1
2 高 妮 2
关键词:   
Abstract: As for the vault voids and other issues of tunnel secondary lining, based on the basic performance re? quirements for filling mortars of secondary lining of railway tunnels, and under mixture formula of OPC∶SAC = 0.65∶0.35, cement∶sand = 0.55∶0.45, water: aggregate = 0.18 and 10% fly ash admixture, this paper studies the effect of functional admixtures on the performance of mortars in terms of the fluidity, bleeding rate, strength, expansibility and dry shrinkage, etc. The results show that: under the mixing dosages of 0.3% tartaric acid, 0.2% lithium carbonate, 0.06% plastic expander, 0.15% defoamer and 0.12% water-retaining thickener, the filling mortar can be prepared with properties of self-compacting, no bleeding, no segregation, high early and long-term strength, and micro expansion; through the bonding test of filling mortar and lining concrete, field radar nondestructive testing and vault core drilling, the results show that there is a good bonding capability between the filling mortars and the tunnel secondary lining, which could mitigate voids behind tunnel secondary lining and avoid the separation between filling materials and secondary lining concrete.
KeywordsGrouting through mould,   Filling mortar of secondary lining,   Functional admixture,   OPC-SAC mixed cement system     
基金资助:陕西省渭南市科技计划项目(2020ZDYF-JCYJ-232);陕西铁路工程职业技术学院中青年科技创新人才(KJRC201806);陕西铁路工程职业技术学院高性能混凝土科技创新团队(KJTD201802).
作者简介: 彭 磊(1984-),男,硕士,副教授,主要从事隧道工程材料研发、隧道工程检测方面的工作,E-mail:penglei012004@163.com.
引用本文:   
彭 磊 1, 2 何文敏 1, 2 惠海涛 3 李炳良 1等 .功能外加剂对隧道二次衬砌拱顶充填砂浆性能的影响[J]  现代隧道技术, 2021,V58(5): 244-251
PENG Lei1, 2 HE Wenmin1, 2 HUI Haitao3 LI Bingliang1 etc .Effect of Functional Admixtures on the Performances of Mortars Filling behind Tunnel Vault Secondary Lining[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(5): 244-251
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I5/244
 
没有本文参考文献
[1] 魏 纲 1,2 赵得乾麟 1 黄 睿 1.盾构施工对邻近隧道影响的模型试验研究综述[J]. 现代隧道技术, 2021,58(5): 1-8
[2] 丁 智 1,2 何晨阳 1 张 霄 1 张文宏 3 吴 胜 4.含气土盾构施工影响及控制技术研究展望[J]. 现代隧道技术, 2021,58(5): 9-20
[3] 章龙管 1 刘绥美 1 李开富 1 徐 进 2,3,4 王胜楠 3,5 李 强 3.基于故障树与贝叶斯网络的地铁盾构施工风险预测[J]. 现代隧道技术, 2021,58(5): 21-29
[4] 郑 波 1,2 吴 剑 1,2 郑金龙 3 匡 亮 4 郭 瑞 1,2.基于现场试验的川西高海拔隧道防冻参数研究[J]. 现代隧道技术, 2021,58(5): 30-36
[5] 仇文革 万世付 高刚刚 赵海霖 戚幸鑫.砂卵石地层盾构隧道下穿铁路咽喉区地表沉降控制研究[J]. 现代隧道技术, 2021,58(5): 37-45
[6] 王志杰 1 李金宜 1 邓宇航 1 杜逸文 1 周 平 1 白小可 2 李峰刚 2.盐岩隧道施工病害揭示及致灾因子研究[J]. 现代隧道技术, 2021,58(5): 46-55
[7] 高 鑫 王文娟 李清菲 冯世杰 吴 琦.双护盾TBM步进过站路径研究[J]. 现代隧道技术, 2021,58(5): 56-64
[8] 李思明 1 禹海涛 2 薛光桥 3 徐 磊 4.穿越土-岩变化地层盾构隧道地震响应分析[J]. 现代隧道技术, 2021,58(5): 65-72
[9] 常 刚 1,2 牌立芳 3,4 庞伟军 1,4 吴红刚 1,2,4 剡理祯 1.深埋硬岩组合隧道围岩开挖变形影响研究[J]. 现代隧道技术, 2021,58(5): 73-77
[10] 陈玉坤 1 管会生 1 周 磊 2 刘 成 1.基于BP神经网络的盘形滚刀磨损预测研究[J]. 现代隧道技术, 2021,58(5): 78-84
[11] 宋 洋 1 王韦颐 2 杜春生 3.富水圆砾与泥岩复合地层泥水盾构超近接下穿既有地铁隧道掘进参数优化研究[J]. 现代隧道技术, 2021,58(5): 85-95
[12] 许有俊 1,2 黄正东 1,2 张 旭 1,2 张 朝 1,2 康佳旺 1,2 周 薇 1.大断面土压平衡矩形顶管多刀盘实测扭矩参数研究[J]. 现代隧道技术, 2021,58(5): 96-103
[13] 潘伟强 1 焦伯昌 2 柳 献 2 曾 华 3 吉茂杰 3.深埋大断面钢结构顶管接触压力及受力特性现场试验研究[J]. 现代隧道技术, 2021,58(5): 104-113
[14] 陈祉颖 牛国庆 王舒梦 郭宸玮.基于正交模拟试验的隧道空气幕参数优化研究[J]. 现代隧道技术, 2021,58(5): 114-121
[15] 潘旭东 1 白云龙 1 白云飞 2 张志强 2 廖 霖 1.富水地层冻结法施工渗流场对温度场的影响规律研究[J]. 现代隧道技术, 2021,58(5): 122-128
Copyright 2010 by 现代隧道技术