基于台阶试验的相对最大摄氧量与人员疏散能力关系研究
(1 西南交通大学土木工程学院,成都 610031;2 西南交通大学交通隧道工程教育部重点实验室,成都 610031;3 山东高速股份有限公司青岛运管中心,青岛 266041)
Study on Relationship between Relative Maximum Oxygen Uptake and Personnel Evacuation Capacity Based on the Step Test
(1 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3 Qingdao transportation management center of Shandong Expressway Co., Ltd.,Qingdao 266041)
Download: PDF (2419KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章通过进行500 m疏散测试试验得到不同受试者的测试完成时间,并结合台阶测试试验得到的相对最大摄氧量,得到了相对最大摄氧量与人员疏散运动能力的相对关系。受试者年龄在20~25岁之间,共选取13位受试者,分别进行台阶测试试验和疏散测试试验。台阶测试试验中测试了受试者不同阶段的血氧饱和度、心率等生理参数,并提出以相对综合心率对运动能力进行评价,由A-R列线图法对受试者的最大摄氧量进行换算,为消除个体差异,以相对最大摄氧量进行评价。在完成台阶测试试验48 h后,让相同的受试者进行500 m疏散测试试验,记录最终测试完成的时间。将两次试验得到的相对最大摄氧量与疏散测试试验的完成时间进行拟合分析,发现疏散测试完成时间与相对最大摄氧量存在反比关系,从而可以用相对最大摄氧量来间接表示疏散运动能力。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王明年 1
2 崔 鹏 1
2 于 丽 1
2 卢旭东 3 胡萧越 1
2 夏鹏曦 1
2
关键词:   
Abstract: The relationship between relative maximum oxygen uptake and personnel evacuation exercise ability is obtained according to the completion time of different subjects in the 500 m evacuation test and in combination with the relative maximum oxygen uptake in the step test. The subjects participating in the test are between 20 and 25 years old and a total of 13 subjects are selected for the step test and evacuation test, respectively. In the step test,physiological parameters, e.g. blood oxygen saturation and heart rate of the subjects at different stages, are tested and the relative comprehensive heart rate is proposed to evaluate the exercise ability. The maximum oxygen uptake of the subjects is indirectly converted by the A-R nomogram method, and the relative maximum oxygen uptake is used to eliminate individual differences. 48 hours after the step test, the same subjects are asked to conduct a 500 m evacuation test, of which the completion time is recorded accordingly. Then, the fitting analysis is carried out for relative maximum oxygen uptake obtained from the step test and completion time of the evacuation test. It is found that there is an inverse relationship between the completion time of the evacuation test and the relative maximum oxygen uptake. So, the relative maximum oxygen uptake can be used to indirectly express the evacuation exercise ability.
KeywordsRailway tunnel,   Step test,   Relative maximum oxygen uptake,   Evacuation capacity     
作者简介: 作者简介:王明年(1965-),男,博士,教授,主要从事隧道及地下工程防灾救援方向的研究工作,E-mail: 19910622@163.com. 通讯作者:于 丽(1978-),女,博士,教授,主要从事隧道及地下工程防灾救援方向的研究工作,E-mail: 22643123@qq.com.
引用本文:   
王明年 1, 2 崔 鹏 1, 2 于 丽 1等 .基于台阶试验的相对最大摄氧量与人员疏散能力关系研究[J]  现代隧道技术, 2021,V58(6): 38-45
WANG Mingnian1, 2 CUI Peng1, 2 YU Li1 etc .Study on Relationship between Relative Maximum Oxygen Uptake and Personnel Evacuation Capacity Based on the Step Test[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 38-45
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I6/38
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术