[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2021, Vol. 58 Issue (6) :38-45    DOI:
研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
基于台阶试验的相对最大摄氧量与人员疏散能力关系研究
(1 西南交通大学土木工程学院,成都 610031;2 西南交通大学交通隧道工程教育部重点实验室,成都 610031;3 山东高速股份有限公司青岛运管中心,青岛 266041)
Study on Relationship between Relative Maximum Oxygen Uptake and Personnel Evacuation Capacity Based on the Step Test
(1 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3 Qingdao transportation management center of Shandong Expressway Co., Ltd.,Qingdao 266041)
Download: PDF (2419KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章通过进行500 m疏散测试试验得到不同受试者的测试完成时间,并结合台阶测试试验得到的相对最大摄氧量,得到了相对最大摄氧量与人员疏散运动能力的相对关系。受试者年龄在20~25岁之间,共选取13位受试者,分别进行台阶测试试验和疏散测试试验。台阶测试试验中测试了受试者不同阶段的血氧饱和度、心率等生理参数,并提出以相对综合心率对运动能力进行评价,由A-R列线图法对受试者的最大摄氧量进行换算,为消除个体差异,以相对最大摄氧量进行评价。在完成台阶测试试验48 h后,让相同的受试者进行500 m疏散测试试验,记录最终测试完成的时间。将两次试验得到的相对最大摄氧量与疏散测试试验的完成时间进行拟合分析,发现疏散测试完成时间与相对最大摄氧量存在反比关系,从而可以用相对最大摄氧量来间接表示疏散运动能力。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王明年 1
2 崔 鹏 1
2 于 丽 1
2 卢旭东 3 胡萧越 1
2 夏鹏曦 1
2
关键词:   
Abstract: The relationship between relative maximum oxygen uptake and personnel evacuation exercise ability is obtained according to the completion time of different subjects in the 500 m evacuation test and in combination with the relative maximum oxygen uptake in the step test. The subjects participating in the test are between 20 and 25 years old and a total of 13 subjects are selected for the step test and evacuation test, respectively. In the step test,physiological parameters, e.g. blood oxygen saturation and heart rate of the subjects at different stages, are tested and the relative comprehensive heart rate is proposed to evaluate the exercise ability. The maximum oxygen uptake of the subjects is indirectly converted by the A-R nomogram method, and the relative maximum oxygen uptake is used to eliminate individual differences. 48 hours after the step test, the same subjects are asked to conduct a 500 m evacuation test, of which the completion time is recorded accordingly. Then, the fitting analysis is carried out for relative maximum oxygen uptake obtained from the step test and completion time of the evacuation test. It is found that there is an inverse relationship between the completion time of the evacuation test and the relative maximum oxygen uptake. So, the relative maximum oxygen uptake can be used to indirectly express the evacuation exercise ability.
KeywordsRailway tunnel,   Step test,   Relative maximum oxygen uptake,   Evacuation capacity     
作者简介: 作者简介:王明年(1965-),男,博士,教授,主要从事隧道及地下工程防灾救援方向的研究工作,E-mail: 19910622@163.com. 通讯作者:于 丽(1978-),女,博士,教授,主要从事隧道及地下工程防灾救援方向的研究工作,E-mail: 22643123@qq.com.
引用本文:   
王明年 1, 2 崔 鹏 1, 2 于 丽 1等 .基于台阶试验的相对最大摄氧量与人员疏散能力关系研究[J]  现代隧道技术, 2021,V58(6): 38-45
WANG Mingnian1, 2 CUI Peng1, 2 YU Li1 etc .Study on Relationship between Relative Maximum Oxygen Uptake and Personnel Evacuation Capacity Based on the Step Test[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 38-45
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I6/38
 
没有本文参考文献
[1] 冯冀蒙 1,2 蒋 辉 1,2 丁晓琦 1,2 虞龙平 1,2 张俊儒 1,2.并行双洞隧道穿越滑坡工程研究进展与挑战[J]. 现代隧道技术, 2021,58(6): 1-10
[2] 卢冠楠 1 王 鹏 1 杨 蕴 2 毛成君 3 吴咏敬 4 吴剑锋 3 董 平 3, 4 吴吉春 3.岩溶区隧道排水系统地下水渗流结晶堵塞机理及阻垢技术研究综述[J]. 现代隧道技术, 2021,58(6): 11-20
[3] 董建松.厦门海沧海底隧道穿越风化槽施工技术[J]. 现代隧道技术, 2021,58(6): 197-203
[4] 付 雷 马 鑫 邵 炜.冷水混入模式对藏南隧道高温热害预测的影响[J]. 现代隧道技术, 2021,58(6): 21-30
[5] 花晓鸣 罗晨曦 苟晓军 张海超.结合Landsat 8遥感影像的长大深埋隧道地表地热空间分布特征分析——以高黎贡山隧道为例[J]. 现代隧道技术, 2021,58(6): 31-37
[6] 周晓军 1 郭 建 1 杨昌宇 2 卿伟宸 2 熊国兴 2 旷文涛 2 潘英东 1.钻爆法双线铁路隧道预制拼装二次衬砌分块方式研究[J]. 现代隧道技术, 2021,58(6): 46-58
[7] 何乐平 1 徐应东 1 胡启军 1 蔡其杰 2.基于博弈论-云模型的软岩隧道大变形风险评估[J]. 现代隧道技术, 2021,58(6): 85-94
[8] 郝俊锁.复杂地质特长深埋水工隧洞智能化施工关键技术研究[J]. 现代隧道技术, 2021,58(6): 188-196
[9] 魏 纲 1 郝 威 2 魏新江 1 王 霄 2 章书远 2.竖向顶管施工全过程数值模拟研究[J]. 现代隧道技术, 2021,58(6): 59-67
[10] 肖尊群 1,2,3 曹童童 1 许彩云 1 杨 凯 2 董琼英 1 姜亦男 1 耿星月 1 舒志鹏 1.基于叠加原理的大尺寸矩形截面竖向曲线顶管顶进力数值估算方法[J]. 现代隧道技术, 2021,58(6): 68-76
[11] 徐公允 1 徐汪豪 1,2 姚志刚 1 方 勇 1 刘四进 3.基于三维RBD-DEM耦合方法的贯入角度对滚刀冲击影响分析[J]. 现代隧道技术, 2021,58(6): 77-84
[12] 来弘鹏 1 王 斌 1 刘禹阳 2.考虑地层开裂的浅埋黄土隧道围岩压力计算方法[J]. 现代隧道技术, 2021,58(6): 95-101
[13] 张冬梅 1,2 陈淙岑 2.管片钢筋和螺栓锈蚀条件下盾构隧道结构时变可靠度分析[J]. 现代隧道技术, 2021,58(6): 111-120
[14] 黄迪文 霍宏斌 陈 东.基于优化神经网络的圆形隧道受剪变形分析[J]. 现代隧道技术, 2021,58(6): 102-110
[15] 黄 鹏 1,2 韦良文 1,2 张学富 1,2.城市轨道交通重叠换乘大拱脚暗挖车站拱脚加固研究[J]. 现代隧道技术, 2021,58(6): 137-147
Copyright 2010 by 现代隧道技术