某地铁车站洞桩法施工变形和结构受力分析
(1 兰州交通大学土木工程国家级实验教学示范中心,兰州 730070;2 兰州交通大学土木工程学院,兰州 730070;3 南通城市轨道交通有限公司,南通 226000)
Analysis of the Deformation and Structural Stress of a Metro Station Constructed by Pile-Beam-Arch Method
(1 National Demonstration Center for Experimental Civil Engineering Education, Lanzhou Jiaotong University, Lanzhou 730070;2 School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070; 3 Nantong Urban Rail Transit Co., Ltd., Nantong 226000)
Download: PDF (3042KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 洞桩法(PBA)作为一种新型的地铁车站施工工法已得到了成功应用,但缺少对PBA法地铁车站施工引起的地表沉降和结构受力的综合研究。文章以某洞桩法施工地铁车站为工程背景,采用数值模拟与现场监测相结合的方法,对洞桩逆作法不同施工阶段引起的地表沉降和车站结构受力进行分析。研究结果表明:导洞开挖和扣拱施作对地层的扰动较大,因此有必要对地层进行预加固处理(如超前管棚+注浆),进而严格控制地面沉降总量;围护桩轴力时程曲线可分为3个阶段,即快速增长阶段、缓慢增长阶段、稳定持平阶段;实测和计算得到的沉降值变化规律基本吻合,地表沉降最大值均发生在车站中轴线上方,符合Peck沉降槽理论。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
周稳弟 1
2 梁庆国 1
2 张晋东 3
关键词:   
Abstract: As a new construction method of metro stations, the Pile-Beam-Arch method (PBA) has been success? fully applied in the practical engineering, but there is a lack of comprehensive researches on the surface settlement and structural stress of metro stations caused by PBA method construction. Taking a metro station constructed by Pile-Beam-Arch (PBA) method as the engineering background, this paper analyzes the surface settlement and the structural stress of the metro station in different construction stages of PBA top-down construction method, by means of the combination of numerical simulation with on-site monitoring. The research results show that the excavation of the pilot tunnel and the construction of the supporting arch have great disturbance to the ground, it is necessary to pre-reinforce the ground (such as advance pipe-roof + grouting), so as to strictly control the total amount of ground settlement. The time-history curve of the axial force of retaining piles can be divided into three stages: rapid growth stage, slow growth stage, and stable stage. The variation laws of measured and the calculated settlements are basically consistent, and both the measured and calculated maximum surface settlement occur above the central axis of the station, which is in line with the Peck settlement trough theory.
KeywordsMetro station,   PBA method,   Surface settlement,   Structural stress,   Numerical simulation,   On-site moni? toring     
引用本文:   
周稳弟 1, 2 梁庆国 1, 2 张晋东 3 .某地铁车站洞桩法施工变形和结构受力分析[J]  现代隧道技术, 2021,V58(6): 121-128
ZHOU Wendi1, 2 LIANG Qingguo1, 2 ZHANG Jindong3 .Analysis of the Deformation and Structural Stress of a Metro Station Constructed by Pile-Beam-Arch Method[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 121-128
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I6/121
 
没有本文参考文献
[1] 冯冀蒙 1,2 蒋 辉 1,2 丁晓琦 1,2 虞龙平 1,2 张俊儒 1,2.并行双洞隧道穿越滑坡工程研究进展与挑战[J]. 现代隧道技术, 2021,58(6): 1-10
[2] 卢冠楠 1 王 鹏 1 杨 蕴 2 毛成君 3 吴咏敬 4 吴剑锋 3 董 平 3, 4 吴吉春 3.岩溶区隧道排水系统地下水渗流结晶堵塞机理及阻垢技术研究综述[J]. 现代隧道技术, 2021,58(6): 11-20
[3] 董建松.厦门海沧海底隧道穿越风化槽施工技术[J]. 现代隧道技术, 2021,58(6): 197-203
[4] 付 雷 马 鑫 邵 炜.冷水混入模式对藏南隧道高温热害预测的影响[J]. 现代隧道技术, 2021,58(6): 21-30
[5] 花晓鸣 罗晨曦 苟晓军 张海超.结合Landsat 8遥感影像的长大深埋隧道地表地热空间分布特征分析——以高黎贡山隧道为例[J]. 现代隧道技术, 2021,58(6): 31-37
[6] 王明年 1,2 崔 鹏 1,2 于 丽 1,2 卢旭东 3 胡萧越 1,2 夏鹏曦 1,2.基于台阶试验的相对最大摄氧量与人员疏散能力关系研究[J]. 现代隧道技术, 2021,58(6): 38-45
[7] 周晓军 1 郭 建 1 杨昌宇 2 卿伟宸 2 熊国兴 2 旷文涛 2 潘英东 1.钻爆法双线铁路隧道预制拼装二次衬砌分块方式研究[J]. 现代隧道技术, 2021,58(6): 46-58
[8] 何乐平 1 徐应东 1 胡启军 1 蔡其杰 2.基于博弈论-云模型的软岩隧道大变形风险评估[J]. 现代隧道技术, 2021,58(6): 85-94
[9] 郝俊锁.复杂地质特长深埋水工隧洞智能化施工关键技术研究[J]. 现代隧道技术, 2021,58(6): 188-196
[10] 魏 纲 1 郝 威 2 魏新江 1 王 霄 2 章书远 2.竖向顶管施工全过程数值模拟研究[J]. 现代隧道技术, 2021,58(6): 59-67
[11] 肖尊群 1,2,3 曹童童 1 许彩云 1 杨 凯 2 董琼英 1 姜亦男 1 耿星月 1 舒志鹏 1.基于叠加原理的大尺寸矩形截面竖向曲线顶管顶进力数值估算方法[J]. 现代隧道技术, 2021,58(6): 68-76
[12] 徐公允 1 徐汪豪 1,2 姚志刚 1 方 勇 1 刘四进 3.基于三维RBD-DEM耦合方法的贯入角度对滚刀冲击影响分析[J]. 现代隧道技术, 2021,58(6): 77-84
[13] 来弘鹏 1 王 斌 1 刘禹阳 2.考虑地层开裂的浅埋黄土隧道围岩压力计算方法[J]. 现代隧道技术, 2021,58(6): 95-101
[14] 张冬梅 1,2 陈淙岑 2.管片钢筋和螺栓锈蚀条件下盾构隧道结构时变可靠度分析[J]. 现代隧道技术, 2021,58(6): 111-120
[15] 黄迪文 霍宏斌 陈 东.基于优化神经网络的圆形隧道受剪变形分析[J]. 现代隧道技术, 2021,58(6): 102-110
Copyright 2010 by 现代隧道技术