现代隧道技术 2022, Vol. 59 Issue (3) :155-165    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
地裂缝场地盾构隧道下穿施工对既有管廊的影响研究
(1.长安大学地质工程系,西安 710054;2.长安大学岩土与地下工程研究所,西安 710054;3.陕西省城市地质与地下空间工程技术研究中心,西安 710064;4.中铁第一勘察设计院集团有限公司,西安 710043)
Study on the Impact of Shield Tunnel Under-crossing at Ground Fissure Site on Existing Utility Tunnels
(1. Department of Geological Engineering, Chang′an University, Xi′an 710054; 2. Institute of Geotechnical and Underground Engineering, Chang'an University, Xi′an 710054; 3. Technical Research Center for Urban Geological and Underground Space Engineering of Shaanxi, Xi′an 710064; 4. China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043)
Download: PDF (5582KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 地裂缝场地内盾构隧道下穿既有管廊结构的施工建设面临严重安全风险。文章以通过f3地裂缝场地的西安地铁5号线盾构施工下穿昆明路地下综合管廊为工程背景,采用有限元数值模拟与理论解析法,分析了地裂缝场地内盾构隧道下穿施工对上部既有管廊的影响,揭示了地裂缝场地内盾构隧道下穿施工引起管廊结构位移与应力的变化规律。结果表明:盾构隧道从地裂缝场地下盘至上盘下穿管廊施工时,引起管廊的变形相对于无地裂缝场地时增大30.9%;管廊结构在地裂缝附近出现应力降低区(即影响带),其影响范围为上盘约4 m、下盘约16 m,应力降低区以外的管廊结构侧壁应力与无地裂缝场地时相比增加1倍以上,而底部应力增加40%左右;地裂缝的存在对管廊结构的影响表现为变形叠加放大、地裂缝带附近应力降低和影响带之外应力增加等。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
苗晨阳 1 黄强兵 1
2 苟玉轩 1 滕宏泉 3 贾少春 4
关键词地裂缝场地   盾构隧道下穿   地下综合管廊   数值模拟   变形与应力     
Abstract: There is a serious safety risk when the shield tunnel at the ground fissure site crosses under the existing utility tunnels. Based on the case of the shield tunnel of Xi′an Metro Line 5 that crosses under the utility tunnel under Kunming Road at f3 ground fissure site, the finite element numerical simulation and theoretical analysis method was adopted in this paper to analyze the impact of under-crossing shield tunnel at the ground fissure site on the existing upper utility tunnel and to reveal the pattern of changes in the displacement and stress of utility tunnel structure caused by such under-crossing. The results showed that when the shield tunnel crossed the utility tunnel from the footwall to the hanging wall at the ground fissure site, the deformation of utility tunnel was increased by 30.9% compared to that on the site without ground fissure; the utility tunnel structure had a stress reduction zone (i.e. zone of influence) around the ground fissure, with an influence area covering about 4 m from the hanging wall and about 16 m from the footwall, and the side wall stress of the utility tunnel outside the stress reduction zone more than doubled compared to that at the site without ground fissure, and the bottom stress was increased by about 40%; the impacts of ground fissure on the utility tunnel structure include enlarged deformation and superposition, a reduction in the stress around the ground fissure zone, and an increase in the stress outside the zone of influence.
KeywordsGround fissure site,   Under-crossing of shield tunnel,   Underground utility tunnel,   Numerical simulation,   Deformation and stress     
基金资助:陕西省公益性地质专项项目(20180303);西安市轨道交通集团有限公司委托项目(D8-ZX-2018010)
作者简介: 苗晨阳(1999-),男,硕士研究生,主要从事工程地质与岩土工程方面的研究工作,E-mail:2020126078@chd.edu.cn. 通讯作者:黄强兵(1972-),男,博士,教授,主要从事地质工程、岩土及地下工程方面的教学与研究工作,E-mail:hqb@ chd.edu.cn.
引用本文:   
苗晨阳 1 黄强兵 1, 2 苟玉轩 1 滕宏泉 3 贾少春 4 .地裂缝场地盾构隧道下穿施工对既有管廊的影响研究[J]  现代隧道技术, 2022,V59(3): 155-165
MIAO Chenyang1 HUANG Qiangbing1, 2 GOU Yuxuan1 TENG Hongquan3 JIA Shaochun4 .Study on the Impact of Shield Tunnel Under-crossing at Ground Fissure Site on Existing Utility Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(3): 155-165
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I3/155
 
没有本文参考文献
[1] 唐 艳.铁路隧道下穿高速公路工程风险评估管理方法研究[J]. 现代隧道技术, 2022,59(3): 220-226
[2] 朱牧原 1 魏力峰 1 方 勇 1 付 强 2 高腾达 2 蒲 松 1.超大直径盾构隧道下穿黄河大堤沉降分析与控制研究[J]. 现代隧道技术, 2022,59(3): 211-219
[3] 隗志远 1 冯冀蒙 2 虞龙平 2.地铁车站双层初期支护拱盖法施工过程力学行为研究[J]. 现代隧道技术, 2022,59(3): 265-274
[4] 喻凌峰.山岭隧道不同埋深的结构动力响应特征及震害机理研究[J]. 现代隧道技术, 2022,59(3): 227-235
[5] 石钰锋 1,2 曹成威 1,2 谈亦帆 3 徐长节 1,2,4 章立辰 5 黄 勇 5.地铁隧道基底饱水风化软岩动力响应及长期沉降研究[J]. 现代隧道技术, 2022,59(2): 86-95
[6] 张付军 1 胡 俊 2,3 段 宇 4 朱才辉 4.某富水断层隧道涌水治理方案优化分析及工程应用[J]. 现代隧道技术, 2022,59(2): 122-131
[7] 程咏春 1 曾祥纪 1 王振佳 1 王 栋 1 杨 蕴 2 吴咏敬 3 董 平 3, 4.岩溶隧道排水管结晶堵塞试验与数值模拟研究[J]. 现代隧道技术, 2022,59(2): 159-166
[8] 冯慧君.新建地铁隧道近距离下穿运营地铁线路施工及安全管控[J]. 现代隧道技术, 2022,59(2): 220-226
[9] 施有志 1 洪娇莉 2 林树枝 3 徐建宁 4.基于BB-MOPSO的综合管廊进风状态参数控制研究[J]. 现代隧道技术, 2022,59(1): 156-163
[10] 丁小彬 韩东霖.运营盾构隧道不同椭圆度变形情况下受力性能分析[J]. 现代隧道技术, 2022,59(1): 141-148
[11] 唐浪洲 1,2 于 丽 1,2 王玉锁 1,2 汪主洪 1,2 王明年 1,2.走滑断层错动量大小对铁路隧道结构安全性影响的数值分析[J]. 现代隧道技术, 2022,59(1): 214-224
[12] 陈绍华.秦岭马白山隧道新型紧急救援站结构型式研究[J]. 现代隧道技术, 2022,59(1): 35-41
[13] 徐公允 1 徐汪豪 1,2 姚志刚 1 方 勇 1 刘四进 3.基于三维RBD-DEM耦合方法的贯入角度对滚刀冲击影响分析[J]. 现代隧道技术, 2021,58(6): 77-84
[14] 王英学 1 骆 阳 1 张子为 1 王国义 2 宋相帅 1.圆弧刀盘土压平衡盾构施工沉降影响分析[J]. 现代隧道技术, 2021,58(6): 155-162
[15] 周稳弟 1,2 梁庆国 1,2 张晋东 3.某地铁车站洞桩法施工变形和结构受力分析[J]. 现代隧道技术, 2021,58(6): 121-128
Copyright 2010 by 现代隧道技术