岩体高应力损伤史影响围岩支护的机理研究
 
(1.南京水利科学研究院材料结构研究所,南京 210029;2.南京航空航天大学土木与机场工程系,南京 211106;3.武汉大学水利水电学院,武汉 430072)
Study on the Mechanisms of the Influence of Rock Mass with Previous Highstress Damage on Surrounding Rock Supports
 
(1. NHRI Materials & Structural Engineering Department, Nanjing 210029; 2. Department of Civil and Airport Engineering, Nanjing University of Aeronautics and Astronautics, Nanjing 211106; 3. School of Water Resources and Hydropower Engineering,Wuhan University, Wuhan 430072)
Download: PDF (4268KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
文章导读  
摘要 断层带岩体存在裂隙和高应力损伤历史的特点。为了探究隧道穿越断层带时,具有高应力损伤史的岩体在开挖后的力学特性及其对支护的影响,设计了两种卸荷路径不同的离散元数值模型:一种是峰前卸荷,反映普通隧道开挖;另一种是峰后卸荷,反映断层带内具有高应力损伤历史岩体中的隧道开挖。通过白砂岩试样的三轴压缩物理试验,标定了离散元模型的计算参数,然后通过数值计算对比研究两种卸荷路径下的围岩力学行为。结果表明,有高应力损伤历史的围岩在开挖卸荷后,自承载能力崩溃更快,因此要求支护更加及时;要控制到相同的围岩变形量,峰后卸荷工况所需的支护强度显著增大,更难以支护的细观机理在于拉伸微裂纹的显著发育。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
汤 雷 1 温嘉琦 1 赵新铭 2 姜 波 2 占其兵 1
3
关键词断层带   高应力损伤岩体   围岩支护   开挖卸荷   离散元方法     
Abstract: The rock mass in the fault zone is characterized by fissures and previous high-stress damage. To explore the mechanical property of rock mass with high-stress previous damage after excavation when a tunnel passes through a fault zone and its impact on supports, different discrete element numerical models of two unloading paths are designed: pre-peak unloading, reflecting the excavation of ordinary tunnels; post-peak unloading, reflecting the excavation of tunnels in the rock mass with high-stress previous damage in a fault zone. The calculation parameters of discrete element models are calibrated through the triaxial compression test of white sandstone samples, and then numerical calculations are conducted to compare and study the mechanical behaviors of surrounding rocks in these two unloading paths. The results show that the self-bearing capacity of the surrounding rock with high-stress previous damage collapses at a faster speed after excavation-induced unloading, so supports shall be provided more timely; the support strength required is significantly increased to achieve the identical amount of deformation of surrounding rock; and it is more difficult to support the micromechanism for the significant development of tensile microcracks.
KeywordsFault zone,   Rock mass with high-stress previous damage,   Surrounding rock support,   Excavation-in? duced unloading,   Discrete element method (DEM)     
基金资助:国家重点研发计划项目(2021YFC3090103);中央级公益性科研院所基本科研业务费专项(Y421006,Y421008,Y422001)
作者简介: 汤 雷(1972-),男,博士,正高级工程师,主要从事水工结构方向的研究工作,E-mail:ltang@nhri.cn.
引用本文:   
汤 雷 1 温嘉琦 1 赵新铭 2 姜 波 2 占其兵 1, 3 .岩体高应力损伤史影响围岩支护的机理研究[J]  现代隧道技术, 2022,V59(4): 50-57
TANG Lei1 WEN Jiaqi1 ZHAO Xinming2 JIANG Bo2 ZHAN Qibing1, 3 .Study on the Mechanisms of the Influence of Rock Mass with Previous Highstress Damage on Surrounding Rock Supports[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(4): 50-57