垂直冻结技术在大埋深山岭铁路隧道中的应用

Application of Vertical Freezing Technique in the Deep-buried Mountain Railway Tunnel

  • 摘要: 程儿山隧道地层主要为弱胶结第三系砂岩,洞身穿越F2断层核心带,施工中多次发生突泥、涌砂及掌子面向外推移的地质灾害,施工风险极高。基于F2断层核心带高压、富水的具体情况,文章通过对多种施工方案技术性、可行性和安全性进行对比分析,首次在铁路山岭隧道中应用垂直冻结技术对地层进行加固,并对冻结方案和隧道支护措施进行了研究,可为类似地层隧道施工提供借鉴与指导。

     

    Abstract: The strata of Chengershan tunnel is mainly consist of the slightly cemented tertiary sandstone, the tun? nel body passes through F2 fault core zone. Geological disasters of mud outburst, sand gushing and extrusion of work face occurred several times during tunnel construction, so the risks are very high. In view of the core zone of F2 fault with high pressure and abundant water, a variety of construction schemes were compared and analyzed in terms of technology, feasibility and safety, and vertical freezing technique was used for stratum reinforcement in the railway tunnel for the first time, furthermore the freezing scheme and tunnel support measures were studied, providing reference and guidance for similar tunnel construction.

     

/