富水砂层盾构隧道下穿独立浅基础铁路桥加固方案比选研究
(1. 江西地方铁路开发有限公司,南昌 330000;2. 中南大学 土木工程学院,长沙 410075;3. 中铁隧道集团二处有限公司,三河 065201)
Comparative Study on Reinforcement Schemes for Shield Tunnel Under-crossing Railway Bridge with Isolated Shallow Foundation in Water-rich Sand Stratum
(1. Jiangxi Local Railway Development Co., Ltd., Nanchang 330000; 2. School of Civil Engineering, Central South University, Changsha 410075; 3. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201)
Download: PDF (3392KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  为保证富水砂层中盾构隧道下穿独立浅基础铁路桥的施工安全,以南昌地铁4号线下穿京九铁路青山路立交桥为工程背景,采用工法比选、数值分析、现场监测等方法,提出了地表注浆和现浇筏板基础框架涵的加固措施,分析了轨道沉降规律,验证了加固措施的有效性。研究结果表明:在盾构隧道下穿施工前,采用地层注浆和现浇筏板基础框架涵对铁路桥进行加固,实现对轨道沉降的控制,是合理且有效的;相较于不采取任何加固措施的工况,轨道沉降最大值为1.88 mm,减少了83.53%;现场监测结果显示,采取地表注浆和现浇筏板基础框架涵加固后轨道沉降最大值为1.45 mm,验证了数值分析结果的正确性和加固措施的有效性,保证了京九铁路干线的正常运营。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
欧阳鸿志 1 朱定桂 2 安 斌 3 施成华 2
关键词盾构隧道   富水砂层   铁路桥   加固措施   轨道变形     
Abstract: In order to ensure the construction safety of shield tunnel undercrossing isolated shallow foundation rail? way bridge in water-rich sand stratum, taking Nanchang Metro Line 4 undercrossing Qingshan Road overpass of Bei?jing-Kowloon Railway as the engineering background, the reinforcement measures of stratum grouting and cast-inplace raft foundation frame culvert are put forward by means of construction method comparison, numerical analysis and field monitoring. The law of track settlement is analyzed, and the effectiveness of reinforcement measures is verified. The results show that it is reasonable and effective to use stratum grouting and cast-in-place raft foundation frame culvert to reinforce the railway bridge and realize the control of track settlement before shield tunnelling. Compared with the condition without any reinforcement measures, the maximum value of track settlement is reduced by 83.53%, which is 1.88 mm. The field monitoring results show that the maximum settlement of the track is 1.45 mm after stratum grouting and cast-in-place raft foundation frame culvert reinforcement, which verifies the correctness of the numerical analysis results and the effectiveness of the reinforcement measures, and ensures the normal operation of the Beijing-Kowloon Railway.
KeywordsShield tunnel,   Water-rich sand sratum,   Railway bridge,   Reinforcement measures,   Rail deformation     
作者简介: 欧阳鸿志(1989-),男,硕士研究生,工程师,主要从事隧道与地下工程工作,E-mail:holmesian@qq.com.
引用本文:   
欧阳鸿志 1 朱定桂 2 安 斌 3 施成华 2 .富水砂层盾构隧道下穿独立浅基础铁路桥加固方案比选研究[J]  现代隧道技术, 2022,V59(5): 246-
OUYANG Hongzhi1 ZHU Dinggui2 AN Bin3 SHI Chenghua2 .Comparative Study on Reinforcement Schemes for Shield Tunnel Under-crossing Railway Bridge with Isolated Shallow Foundation in Water-rich Sand Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(5): 246-
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I5/246
 
没有本文参考文献
[1] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[2] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[3] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[4] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[5] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[6] 谭鑫雨1 韦 猛1,2 兰灵申1 尚 强1 张海涛1.盾构刀盘结泥饼土体降黏附试验与机理研究[J]. 现代隧道技术, 2025,62(4): 219-229
[7] 刘朋飞1,2 曾德星2 王 霄3 杨 钊2 李 钰2.盾构泥饼分解剂作用效果评价试验及应用研究[J]. 现代隧道技术, 2025,62(4): 230-237
[8] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[9] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[10] 张昕阳1,2 申玉生1,2 常铭宇1,2 刘 童1,2 孙天赦3,4 胡 帅3,4.克泥效工法对泥岩地层盾构隧道地表变形控制规律研究[J]. 现代隧道技术, 2025,62(2): 283-290
[11] 于同生1,2 官林星3 闫治国1,2.地铁盾构隧道多灾害场景及结构多灾害响应研究综述[J]. 现代隧道技术, 2025,62(2): 16-26
[12] 朱叶艇1,2 朱雁飞1 王志华1,3 王帅峰4 王 浩1 马志刚1 龚 卫1,2 秦 元1.推力矢量智控盾构的理论创新、方法实现与工程验证[J]. 现代隧道技术, 2025,62(2): 71-78
[13] 肖明清1 封 坤2 薛光桥1 王运超2 鲁志鹏1 陈 龙2.软土地层盾构姿态偏移引起的附加土压力影响因素研究[J]. 现代隧道技术, 2025,62(2): 141-150
[14] 姚占虎1 杨 琴2 李 辉2 魏代伟2 孟 佳2.盾构隧道同步双液注浆技术研究与应用[J]. 现代隧道技术, 2025,62(2): 265-273
[15] 蔡浩明.基岩爆破预处理对盾构掘进状态及岩体破碎机理的影响[J]. 现代隧道技术, 2025,62(1): 192-200
Copyright 2010 by 现代隧道技术