现代隧道技术 2023, Vol. 60 Issue (2) :115-124    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
基于围岩径向位移释放率的超大断面隧道下穿施工围岩稳定性研究
(1.陕西铁路工程职业技术学院测绘与检测学院,渭南 714000;2.西南交通大学 交通隧道工程教育部重点实验室,成都 610031)
A Study on the Stability of Surrounding Rocks in Construction of Undercrossing Tunnels with Super-large Section Based on Radial Displacement Release Rate of Surrounding Rocks
(1. Department of Surveying and Testing, Shaanxi Railway Institute, Weinan, Shaanxi 714000; 2. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (4152KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 依托黄黄铁路新建刘元隧道工程,采用数值模拟结合现场实测的方法,以围岩径向位移释放率指标分析采用全断面和微台阶两种工法下穿施工的围岩稳定性规律。结果表明,新建隧道下穿防空洞段采用微台阶法施工,在控制围岩径向位移释放率、塑性区分布及稳定安全系数等方面较全断面法优势突出;微台阶法下围岩径向位移释放率及围岩稳定安全系数分别为 46.13%、2.13,全断面法下围岩径向位移释放率及稳定安全系数分别为 78.08%、1.99;当台阶长度为3 m时,隧道下穿施工围岩稳定性相对较好。监测数据表明,采用微台阶法下穿施工,洞内变形满足规定要求,且变形值与模拟结果数值吻合较好,进一步验证模拟结果的可靠性。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
燕 波 1 张俊儒 2 张新锦 1 彭 磊 1 宁 波 1
关键词隧道工程   围岩径向位移释放率   围岩稳定性   数值模拟   现场监测     
Abstract: Based on the Liuyuan Tunnel Project on Huanggang-Huangmei High-speed Railway, numerical simula? tion and field measurement methods are adopted to analyze the stability law of surrounding rocks in construction of undercrossing tunnels by full-face construction method and micro-bench construction method, in which the radial displacement release ratio of surrounding rock is used as an indicator for comparison. The results show that the construction of the new tunnel crossing under the air-raid shelter section by micro-bench construction method has outstanding advantages over the full-face construction method in controlling the radial displacement release rate, plastic zone distribution and stability safety factor of the surrounding rocks. The radial displacement release rate and stability safety factor of the surrounding rocks are 46.13% and 2.13 respectively under the micro-bench construction method, and 78.08% and 1.99 respectively under the full-face construction method. The stability of surrounding rocks in construction of undercrossing tunnels is relatively good when the bench length is 3 m. The monitoring data shows that, under the micro-bench construction method, the deformation in the tunnel meets the specified requirements and the deformation values are in good agreement with the simulation results, which further verifies the reliability of the simulation results.
KeywordsTunnel engineering,   Radial displacement release ratio of surrounding rocks,   Stability of surrounding rocks,   Numerical simulation,   Site monitoring     
基金资助:渭南市重点研发计划项目(STYKJ2022-3);国家高铁联合基金(U1934213);陕西铁路工程职业技术学院研究生专项(KY 2021-57);陕西铁路工程职业技术学院轨道交通绿色建材科技创新团队(KJTD202102);陕西铁路工程职业技术学院中青年科技创新人才(KJRC202102)
作者简介: 燕 波(1996-),男,硕士,助教,主要从事隧道围岩稳定性及检测技术的研究,E-mail:yanbosxri@163.com.
引用本文:   
燕 波 1 张俊儒 2 张新锦 1 彭 磊 1 宁 波 1 .基于围岩径向位移释放率的超大断面隧道下穿施工围岩稳定性研究[J]  现代隧道技术, 2023,V60(2): 115-124
YAN Bo1 ZHANG Junru2 ZHANG Xinjin1 PENG Lei1 Ning Bo1 .A Study on the Stability of Surrounding Rocks in Construction of Undercrossing Tunnels with Super-large Section Based on Radial Displacement Release Rate of Surrounding Rocks[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(2): 115-124
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I2/115
 
没有本文参考文献
[1] 王 升1,2,3,4 韦 芹1,2 李利平3.隧道突水突泥灾变机理研究现状及发展趋势[J]. 现代隧道技术, 2025,62(4): 15-25
[2] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[3] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[4] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[5] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[6] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[7] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[8] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[9] 邹育麟1, 2 刘 静1 汪 波2 陈子全2 谢作栋2 古 浩3 王楷越2.四川沿江高速公路隧道涌水突泥灾害成因分析及防治对策研究[J]. 现代隧道技术, 2025,62(3): 259-269
[10] 葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2.不同形式拱架初期支护变形规律实测与数值研究[J]. 现代隧道技术, 2025,62(3): 40-49
[11] 秦天戈1, 2 吴 立2 陈 倩1 夏 振1 刘诗雅1, 2 蔡 新1.钻爆法隧道智能建造体系研究现状与发展趋势[J]. 现代隧道技术, 2025,62(3): 1-10
[12] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[13] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[14] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[15] 苏 恒1 王士民1 朱旭红2 秦善良3.考虑空间效应的盾构刀具切削桩基主筋力学特征研究[J]. 现代隧道技术, 2025,62(3): 139-150