现代隧道技术 2023, Vol. 60 Issue (3) :199-207    DOI:
安全防灾与病害整治 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
火灾下盾构隧道衬砌结构受力与抗火措施模拟分析
(1.中铁第四勘察设计院集团有限公司,武汉 430063;2.水下隧道技术湖北省工程实验室,武汉 430063;3.西南交通大学交通隧道工程教育部重点实验室,成都 610031)
Simulation Analysis of the Forces on Lining Structure of Shield Tunnels and Fire Resistance Measures during Fire
(1. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063; 2. Hubei Provincial Engineering Laboratory for Underwater Tunnel Technology, Wuhan 430063; 3. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education,Southwest Jiaotong University, Chengdu 610031)
Download: PDF (4890KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 以甬舟铁路金塘海底隧道为工程背景,采用数值模拟手段分析RABT标准升温曲线下盾构隧道衬砌结构受火后的应力、变形以及劣化情况,研究火灾高温下大直径盾构隧道管片衬砌结构的耐火性能以及抗火措施。结果表明,在RABT升温曲线下受火120 min后,混凝土衬砌受火面处最高温度达到1 119 ℃,衬砌结构无法满足抗火设计要求;混凝土衬砌在受火5.3 min时开始劣化,且随着受火时间增加破坏区继续发展,受火结束时最大劣化深度超过 12 cm;受火结束时,隧道竖向和水平方向净空收敛量较受火前均有所减小,减小量绝对值分别为 11.5 mm、0.12 mm;设置管片混凝土耐火层、设置防火板以及施作防火涂料3种措施均能较好地提高衬砌结构的抗火性能,综合考虑实际工程适用性等因素,建议采用8 cm及以上厚度的C40混凝土耐火层或导热系数小于0.15 W/(m·K)的防火涂料。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
肖明清 1
2 杨文倩 3 封 坤 3 焦齐柱 1 毛 升 1 王运超 3
关键词大直径   盾构隧道   衬砌结构   热力耦合   耐火性能   抗火措施     
Abstract: As for the Jintang Subsea Tunnel on Ningbo-Zhoushan Railway, the numerical simulation method is used to analyze the stress, deformation and deterioration of shield tunnel lining structure induced by fire under the RABT standard heating curve, and to investigate the fire resistance of segmental lining structure of large-diameter shield tunnel under high temperature of fire and the fire resistance measures. As the results suggest, after 120 min of exposure to fire under the RABT heating curve, the fire heated surface of concrete lining reaches 1,119 ℃, so the lining structure cannot meet the fireproofing design requirements; the concrete lining starts deterioration after 5.3 min of exposure to fire, the failure zone continues expanding as the duration of fire increases, and when the fire stops, the maximum deterioration depth is greater than 12 cm; in addition, when the fire stops, the clearance convergence of the tunnel in both vertical and horizontal directions decreases as compared with that before the fire, and the absolute value of the decrease is 11.5 mm and 0.12 mm respectively; the 3 techniques, i.e. installing concrete refractory layer on segments, installing fire board and applying fire-resistant coating, will effectively enhance the fire resistance of the lining structure, but with comprehensive consideration of the factors such as suitability in practical engineering,it is recommended to use the C40 concrete refractory layer with ≥8 cm thickness or the fire-resistant coating with thermal conductivity <0.15 W/(m·K).
KeywordsLarge diameter,   Shield tunnel,   Lining structure,   Thermo-mechanical coupling,   Fire resistance,   Fire re? sistance measures     
基金资助:国家自然科学基金资助项目(52078430).
作者简介: 肖明清(1970-),男,博士,教授级高级工程师,主要从事水下隧道及高速铁路隧道设计方面的研究工作,E-mail:tsyxmq@163.com. 通讯作者:封 坤(1983-),男,博士,教授,主要从事现代盾构设计技术与结构设计理论研究工作,E-mail:windfeng813@163.com.
引用本文:   
肖明清 1, 2 杨文倩 3 封 坤 3 焦齐柱 1 毛 升 1 王运超 3 .火灾下盾构隧道衬砌结构受力与抗火措施模拟分析[J]  现代隧道技术, 2023,V60(3): 199-207
XIAO Mingqing1, 2 YANG Wenqian3 FENG Kun3 JIAO Qizhu1 MAO Sheng1 WANG Yunchao3 .Simulation Analysis of the Forces on Lining Structure of Shield Tunnels and Fire Resistance Measures during Fire[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 199-207
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I3/199
 
没有本文参考文献
[1] 闫鹏飞 蔡永昌 周 龙.基于深层神经网络的管片接头刚度非线性模型及应用[J]. 现代隧道技术, 2023,60(3): 24-33
[2] 钱 源 1 徐 冲 2 刘晓瑞 2 黄 猛 3.荷载与锈胀双重力学作用下海底盾构隧道管片开裂机理研究[J]. 现代隧道技术, 2023,60(3): 102-111
[3] 胡振宇 1 封 坤 1 郭文琦 1 彭长胜 2 李姣阳 2.内部结构不同施作时机对特大断面盾构隧道管片衬砌受力的影响研究[J]. 现代隧道技术, 2023,60(3): 90-101
[4] 薛光桥 1 虞雄兵 3 肖明清 1,2 张超勇 3,4 何应道 1,.考虑压缩-错缝-外部水压的密封垫防水性能数值模拟研究[J]. 现代隧道技术, 2023,60(3): 139-145
[5] 韩晓明 1,2 何 源 1,2 张飞雷 2,3,4.富水粉细砂层大直径盾构隧道联络通道施工关键技术研究——以孟加拉卡纳普里河底隧道为例[J]. 现代隧道技术, 2023,60(3): 227-235
[6] 陈景煦 蔡永昌.基于独立覆盖等几何壳的盾构隧道虚拟接头试验方法研究[J]. 现代隧道技术, 2023,60(2): 22-27
[7] 郑 爽 1,2 刘 超 3 朱德霖 3 刘 海 3 贾新卷 1.大直径盾构掘进非对称同步注浆地层扰动规律研究[J]. 现代隧道技术, 2023,60(2): 168-177
[8] 张建勇 1 李明宇 2,3 陈 健 3,4 余刘成 2 李义翔 1 杨公标 3,4 王 越 2,3.基于双面弹性地基梁的大直径盾构隧道管片上浮预测方法[J]. 现代隧道技术, 2023,60(2): 159-167
[9] 邬 泽 1 顾福霖 2 付艳斌 3.采用压密注浆定量纠偏运营地铁盾构隧道技术研究[J]. 现代隧道技术, 2023,60(2): 185-193
[10] 袁 杰 1 祁佳睿 2 肖 翔 1 李赞新 1 俞立新 1 潘以恒 2.盾构接收钢套筒内填料压力主动调控试验研究[J]. 现代隧道技术, 2023,60(2): 230-237
[11] 杜永潇 1,2,3 孙晓立 1,2,4 杨 军 1,2,4 张焱森 1,2.盾构隧道火灾损伤技术状况检测与鉴定研究[J]. 现代隧道技术, 2023,60(2): 260-270
[12] 曹翔鹏 1,2 封 坤 2 薛皓匀 2 毛 升 1 喻 波 2,3.大直径盾构隧道双层衬砌横向抗震性能研究[J]. 现代隧道技术, 2023,60(1): 130-139
[13] 陈福江 1 段蓉蒨 1 张 鑫 2 刘金刚 3 孙苍乾 1 李茜茜 1.近距离桩基施工对既有盾构隧道的振动影响分析[J]. 现代隧道技术, 2023,60(1): 140-148
[14] 曹小平 1 韦志凯 1 卢洪强 2 牟 晶 2 符小林 2 李志超 2.软土地层小半径盾构隧道下穿在建高铁地基加固效果研究[J]. 现代隧道技术, 2023,60(1): 209-218
[15] 刘 智 1 钟长平 2.超大直径泥水平衡盾构断层破碎带掘进关键技术研究[J]. 现代隧道技术, 2023,60(1): 225-232