[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2023, Vol. 60 Issue (6) :40-47    DOI:
“隧道及地下工程低碳理论及技术应用”专题 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
照明对公路隧道全寿命期碳排放的影响分析
(1.江西省交通投资集团有限责任公司,南昌 330108;2.同济大学土木工程学院,上海 200092; 3.江西交通咨询有限公司,南昌 330008)
Analysis of the Effect of Lighting on Carbon Emission in the Full Life Cycle of Highway Tunnels
(1. Jiangxi Communications Investment Group Co., Ltd., Nanchang 330108; 2. College of Civil Engineering, Tongji University, Shanghai 200092; 3. Jiangxi Transportation Consulting Co., Ltd., Nanchang 330008)
Download: PDF (3436KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为了应对全球气候变化,中国宣布将提高国家自主贡献力度,采取更加有力的政策和措施推动碳达峰和碳中和工作。隧道工程在建造和运维过程中会产生大量的碳排放,对其碳排放进行准确量化分析与评估对推动双碳工作具有重要意义。通过LCA方法进行隧道碳排放边界划分,并建立隧道全寿命期的碳排放计算模型;依托工程实例,对隧道全寿命期的碳排放进行计算与评估。结果表明,隧道建造阶段碳排放的主要来源是材料的生产,运维期的碳排放大小与隧道长度有着密切的联系;根据不同长度隧道照明区段能耗占比结果,可得出随着隧道长度的增加,隧道中间段的照明碳排放占比不断提高;由于隧道的照明设置与交通量相关,在结合粒子群算法和考虑交通量变化的因素下开展隧道照明能耗的不确定分析,结果表明,在长度为500~4 000 m的隧道中,入口段照明能耗产生的碳排放在整个照明区段中的占比十分显著,具有较高的节能减排潜力。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张小英1 刘 陶2 沈 奕2 刘 安3
关键词公路隧道   碳排放   全寿命期   计算模型   隧道照明     
Abstract: : In order to address the global climate change, China has announced the decision to increase its nationally determined contributions and implement more effective policies and actions to reach carbon peaking and carbon neutrality. Construction, operation and maintenance of tunnel projects will generate huge amount of carbon emission, so accurate quantitative analysis and assessment of carbon emission will be important for achieving the dual carbon goals. The tunnel carbon emission boundary has been identified by using the LCA method, and the carbon emission calculation model for the full life cycle of tunnels has been established. Based on an actual project, the carbon emission in the full life cycle of tunnels has been calculated and assessed. According to the results, the carbon emission in the tunnel construction stage is mainly generated by materials production, and the carbon emission in the O&M period is closely related to the tunnel length. Based on the energy consumption proportion of the lighting section of the tunnels of various lengths, it is deduced that the proportion of lighting induced carbon emission in the middle section of tunnel increases as the tunnel length increases. The lighting design of tunnel is related to the traffic volume, so an uncertainty analysis of tunnel lighting energy consumption has been conducted by using the particle swarm optimization, with the traffic volume variation taken into account. As the results indicate, in a 500~4 000 m long tunnel, the carbon emission generated by the lighting energy consumption in the entrance section zone takes a significant proportion in the lighting section and this means great potential of energy conservation and emission reduction.
KeywordsHighway tunnels,   Carbon emission,   Full life cycle,   Calculation model,   Tunnel lighting     
基金资助:江西省交通运输厅科技项目(2022C0003).
作者简介: 张小英(1976-),女,高级工程师,主要从事工程造价及项目管理研究工作,E-mail: 94522531@qq.com. 通讯作者:刘 陶(2000-),男,硕士研究生,主要从事隧道与地下建筑结构方面的研究工作,E-mail:lta@tongji.edu.cn.
引用本文:   
张小英1 刘 陶2 沈 奕2 刘 安3 .照明对公路隧道全寿命期碳排放的影响分析[J]  现代隧道技术, 2023,V60(6): 40-47
Zhang Xiaoying1 Liu Tao2 Shen Yi2 Liu An3 .Analysis of the Effect of Lighting on Carbon Emission in the Full Life Cycle of Highway Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(6): 40-47
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I6/40
 
没有本文参考文献
[1] 艾 青1 李一轩1 朱俊易2.越江盾构隧道全寿命期碳排放特征与减排途径研究[J]. 现代隧道技术, 2023,60(6): 11-19
[2] 李嘉豪1 习明星2 沈 奕1 刘 安2 朱合华.基于SimaPro的公路隧道建造阶段碳排放计算与构成评估[J]. 现代隧道技术, 2023,60(6): 20-28
[3] 曾弘锐1,2 孙文昊3 何 卫3 郭亚林1,2 郭 春1,2.基于机器学习的铁路隧道施工碳排放预测模型研究[J]. 现代隧道技术, 2023,60(6): 29-39
[4] 尹 严 包卫星 卢汉青 张智勇 车博文 潘振华 林旭辉.天山胜利隧道隧址区污水处理全过程碳排放特征和碳减排模式研究[J]. 现代隧道技术, 2023,60(6): 58-67
[5] 刘世昊1 宋战平1,2,3 徐磊磊4 夏震昭5 王军保1,2,3.基于SVM-MAUT的隧道低碳施工方案优选[J]. 现代隧道技术, 2023,60(6): 68-79
[6] 魏新江1,2 李 帅1 杜世明3 赵 军4 夏立锋3 韩同春1.公路隧道火灾预警及烟雾防控与安全疏散研究与展望[J]. 现代隧道技术, 2023,60(6): 100-110
[7] 朱合华1,2,3 窦世琦1 沈 奕1,2,3 芮 易1,2,3 李晓军1,2.基于数字技术的交通隧道工程低碳发展理念与思考[J]. 现代隧道技术, 2023,60(6): 1-10
[8] 罗资清1 周 睿2 骆俊晖1 蒋雅君2 吴春伟1 杨永华1.岩溶区公路隧道土建结构DERU检测评估技术研究[J]. 现代隧道技术, 2023,60(5): 243-253
[9] 王方超1 刘红森1 陈长坤2 焦伟冰2.特长公路隧道平导抽吸式排烟策略数值模拟研究[J]. 现代隧道技术, 2023,60(5): 120-127
[10] 苗回归1 黄 飞1,2 李树清1,2 罗亚飞1,2 苗德华1 焦杨洋1.基于数值模拟-多元线性回归的大断面隧道平均瓦斯浓度检测位置研究[J]. 现代隧道技术, 2023,60(5): 128-135
[11] 赵 军1 杜世明2 王 允3 夏立锋2 魏新江4 韩同春5.可伸缩钢拱架在东岗特长公路隧道支护应用中的测试分析[J]. 现代隧道技术, 2023,60(5): 167-176
[12] 罗 超1 李泽宇1 刘如飞1 李艳艳1 李 明2.基于固定站激光扫描数据的公路隧道拱顶多期形变监测方法[J]. 现代隧道技术, 2023,60(5): 158-166
[13] 罗 勋 1, 2, 3 王明年 1, 2 于 丽 1, 2 张 霄 1, 2 杨恒洪 1, 2 唐浪洲 1, 2.斜滑断层不均匀错动下隧道三维力学响应计算模型[J]. 现代隧道技术, 2023,60(4): 86-94
[14] 赵大能 1 王 毅 2 任志华 3.考虑断层错动-地震动共同作用的隧道结构力学响应分析[J]. 现代隧道技术, 2023,60(4): 95-105
[15] 郭亚林 1,2 孙文昊 3 许洪伟 3 何 卫 3 陈 政 1,2 郭 春 1,2.地铁隧道盾构及钻爆法施工碳排放强度对比[J]. 现代隧道技术, 2023,60(3): 14-23
Copyright 2010 by 现代隧道技术