基于增量法的隧道洞口边坡微型钢管桩-锚杆支护效果分析
(1.西安建筑科技大学土木工程学院,西安 710005;2.陕西省岩土与地下空间工程重点实验室,西安 710005; 3.西安建筑科技大学隧道及地下结构工程研究所,西安 710005;4.中国路桥工程有限责任公司,北京 100011;5.中铁二十局集团第一工程有限公司,苏州 215151)
Analysis of the Support Effect of Micro Steel Pipe Pile-Anchor Bolt at Tunnel Portal Slope Based on the Incremental Method
(1. School of Civil Engineering, Xi'an University of Architecture and Technology, Xi'an 710005; 2. Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi'an 710005; 3. Research Institute of Tunnel and Underground Structure Engineering, Xi'an University of Architecture and Technology, Xi'an 710005; 4. China Road and Bridge Corporation, Beijing 100011;5. The First Engineering Co., Ltd., China Railway 20th Bureau Group Co., Ltd., Suzhou 215151)
Download: PDF (6472KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 微型钢管桩-锚杆联合支护具有施工方便、结构简单、布置灵活等优点,在滑坡治理以及基坑防护工程中得到广泛应用,但在隧道洞口边坡中的应用较少。为研究微型钢管桩-锚杆支护在隧道洞口边坡的支护效果,依托格鲁吉亚1号隧道项目,采用增量法对微型钢管桩-锚杆的支护效果进行数值模拟研究并结合现场监测数据进行分析。结果表明:采用考虑施工过程的增量法对微型钢管桩-锚杆支护体系进行模拟更加合理;在破桩施工后,边坡最大位移为10.20 mm,锚杆最大轴力为339.42 kN,小于锚杆设计轴力420.14 kN,所选特征桩的侧向最大位移为9.90 mm,最大弯矩为31.26 kN·m,低于弯矩设计值84.80 kN·m;边坡竖向位移的实际监测结果与数值模拟结果均显示其呈现“V”形分布且二者数据较吻合;左、右隧道拱顶沉降分别为11.11 mm、8.01 mm,水平位移分别为2.33 mm、1.30 mm。微型钢管桩-锚杆支护体系已成功运用于格鲁吉亚1号隧道项目,保证了隧道洞口段施工的安全。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
许晓静1
2 宋战平1
2
3 田小旭1
2 丁立波4 孙引浩5 赵俊波1
2
关键词隧道工程   增量法   微型钢管桩-锚杆   隧道洞口边坡   支护效果     
Abstract: The combined support system of micro steel pipe pile and anchor bolt, due to its advantages such as con? venient construction, simple structure, and flexible layout, is widely used in landslide remediation and foundation pit protection projects, but its application in tunnel portal slopes is less common. Based on the Georgia No. 1 Tunnel project, the incremental method is used to conduct a numerical simulation study of the support effect of the micro steel pipe pile-anchor bolt system at tunnel portal slopes, and the simulation results are analyzed in conjunction with field monitoring data. The research results show that the incremental method considering the construction process is more reasonable for simulating the micro steel pipe pile-anchor bolt support system. After the pile breaking construction, the maximum displacement of the slope is 10.20 mm, the maximum axial force of the anchor bolt is 339.42 kN, which is less than the design axial force of the anchor bolt of 420.14 kN. The maximum lateral displacement of the selected characteristic pile is 9.90 mm, and the maximum bending moment is 31.26 kN·m, which is lower than the design bending moment value of 84.80 kN·m. The actual monitoring results of the vertical displacement of the slope and the numerical simulation results both show a "V" shaped distribution and the data are consistent. The crown settlements of the left and right tunnels are 11.11 mm and 8.01 mm, respectively, and the horizontal displacements are 2.33 mm and 1.30 mm, respectively. The micro steel pipe pile-anchor bolt support system has been sucessfully applied to the Georgia No. 1 Tunnel project, ensuring the construction safety of the tunnel portal section.
KeywordsTunnel engineering,   Incremental method,   Micro steel pipe pile-anchor bolt,   Tunnel portal slope,   Sup? port effect     
基金资助:国家自然科学基金资助项目(52178393); 陕西省创新能力支持计划-创新团队(2020TD-005).
作者简介: 许晓静(1996-),女,博士研究生,主要从事隧道与地下空间工程方面的研究工作,E-mail:xuxiaojing_789@163.com. 通讯作者:宋战平(1974-),男,博士,教授,主要从事岩土工程、地下工程等领域的教学与科研工作,E-mail:songzhpyt@xauat.edu.cn.
引用本文:   
许晓静1, 2 宋战平1, 2等 .基于增量法的隧道洞口边坡微型钢管桩-锚杆支护效果分析[J]  现代隧道技术, 2024,V61(6): 118-128
XU Xiaojing1, 2 SONG Zhanping1, 2 etc .Analysis of the Support Effect of Micro Steel Pipe Pile-Anchor Bolt at Tunnel Portal Slope Based on the Incremental Method[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(6): 118-128
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I6/118
 
没有本文参考文献
[1] 张成友1 汪 波1 杜泽昊1 高筠涵1 谭力豪2.不同锚杆支护体系防岩爆适宜性分析与锚杆参数优化研究[J]. 现代隧道技术, 2024,61(6): 64-73
[2] 张昕阳1,2 申玉生1,2 常铭宇1,2 王浩鱇1,2 潘笑海1,2 王岩岩1,2.基于GA-BP神经网络的隧道围岩相似材料配合比设计[J]. 现代隧道技术, 2024,61(6): 82-91
[3] 惠 强1 高 峰1,2 谭绪凯1 尤冬梅1.基于分层位错理论的穿越活动断层隧道结构损伤特征研究[J]. 现代隧道技术, 2024,61(6): 35-44
[4] 陈志敏 王 洪 陈 骏 翟文浩 王铎斌 李文豪 蔡昀辰.西南某岩堆体级配特征与成拱效应研究[J]. 现代隧道技术, 2024,61(6): 172-181
[5] 王立川1,2 葛立辉3 王海彦2 孔 超4 李庆斌1 王云涛3 刘玉飞1.隧道二次衬砌拱部脱空纵向同步灌浆施工方法[J]. 现代隧道技术, 2024,61(6): 269-277
[6] 张 霄1, 2 王明年1, 2 于 丽1, 2 王志龙1, 4 刘大刚1, 3 马治中5.隧道开挖面预注浆加固稳定性理论计算模型[J]. 现代隧道技术, 2024,61(5): 42-51
[7] 徐间锋1 张向川1 秦桂芳1 旷华江1 刘光辉1 邓兴兴1 张运波2 田茂豪3.基于钻进特征参数的隧道掌子面围岩级别智能识别方法[J]. 现代隧道技术, 2024,61(5): 79-87
[8] 旷华江1 刘光辉1 李大林1 徐 骁1 杨卫康1 杨廷发1 邓兴兴1张运波2 田茂豪3.基于Cascade Mask Region-Convolutional Neural Network-ResNeSt的隧道光面爆破炮孔残痕智能识别方法[J]. 现代隧道技术, 2024,61(5): 99-110
[9] 韩凤岩1,2 李慧臻3 杨少君3 甘 帆3 肖勇卓1.基于FC-ResNet网络的隧道衬砌裂缝像素级分割方法[J]. 现代隧道技术, 2024,61(5): 111-119
[10] 张浩楠 刘禹阳 田 威 张艺潇 韩思远.公路隧道排水系统结构病害分类及适用性检测分析[J]. 现代隧道技术, 2024,61(5): 243-251
[11] 任 锐1,2 肖臻郅1,2 王亚琼1,2 史培龙1 王立志3.基于交通流特征的高海拔隧道通风能效研究[J]. 现代隧道技术, 2024,61(4): 51-59
[12] 潘笑海1 申玉生1 王浩鱇1 王岩岩1 张昕阳1 张 熙1 左雷彬2.多破裂面走滑断层错动下隧道结构响应规律研究[J]. 现代隧道技术, 2024,61(4): 210-220
[13] 邓 锋1 张永辉2 孙志远1 胡志平2 肖吉勇1 王永亮1 陈光兴1.软硬互层围岩隧道二次衬砌开裂特征及原因分析[J]. 现代隧道技术, 2024,61(4): 266-274
[14] 陈志敏1 王 洪1 龚 军2 李增印2 彭 易1.高地应力软岩隧道双层初期支护围岩变形特征[J]. 现代隧道技术, 2024,61(3): 85-95
[15] 蒋 源 王海林 陈 兆.基于深度学习的隧道不良地质体超前预报图像智能预测算法[J]. 现代隧道技术, 2024,61(3): 148-156
Copyright 2010 by 现代隧道技术