[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2024, Vol. 61 Issue (6) :139-147    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
并行盾构下穿CFG桩加固高铁路基的沉降规律研究
(1.深圳大学土木与交通工程学院,深圳 518061;2.中国水利水电第八工程局有限公司,长沙 410004; 3.深圳大学滨海城市韧性基础设施教育部重点实验室,深圳 518061; 4.深圳市地铁地下车站绿色高效智能建造重点实验室,深圳 518061)
Study on Settlement Patterns of the CFG Pile-reinforced High-speed Railway Subgrade Caused by Parallel Shield Tunnelling
(1. College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518061;2. Sinohydro Bureau 8 Co., Ltd., Changsha 410004; 3. Key Laboratory for Resilient Infrastructures of Coastal Cities (Shenzhen University), MOE, Shenzhen 518061; 4. Shenzhen Key Laboratory of Green, Efficient and Intelligent Construction of Underground Metro Station, Shenzhen 518061)
Download: PDF (5399KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  以西安地铁1号线盾构隧道下穿徐兰高铁为研究背景,对盾构下穿CFG桩加固高铁路基前后的现场轨道沉降监测数据进行统计分析,并采用Plaxis-3D软件建立并行盾构隧道下穿高铁路基的精细化三维有限元模型,通过与现场实测数据对比验证数值模型的有效性。在此基础上,分析盾构隧道施工引起的轨道-路基-水泥粉煤灰碎石桩(CFG桩)-土体-盾构隧道系统的沉降传递规律,探究CFG桩的受力变形。研究结果表明,盾构施工完全通过下穿段后在地表形成50 m长的沉降槽,沉降分布曲线为双驼峰;CFG桩底部在盾构隧道穿越高铁路基后变得松散,最终实际有效桩长为原长的75%;通过研究不同位置的CFG桩,确定依托工程中横断面上CFG桩出现松散的范围具体为(-12.6 m,12.6 m)。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
吴贝钰1 谢渭平2 林星涛1
3
4 高 晨2 苏 栋1
3
4 陈湘生1
3
4
关键词盾构隧道   下穿高铁路基   CFG桩-土结构   沉降   CFG桩有效桩长     
Abstract: Focusing on the shield tunnelling of the Xi′an Metro Line 1 beneath the Xuzhou-Lanzhou High-speed Railway, this study performs a statistical analysis of the monitored track settlement data before and after the tunnelling. A refined three-dimensional finite element model of parallel shield tunnelling crossing under a high-speed railway subgrade is established using Plaxis-3D software. The numerical model′s validity is verified through comparison with field measurements. Based on the model, the settlement transfer mechanism of the track-subgradeCFG pile-soil-shield tunnel system induced by shield tunnelling is analyzed, and the stress and deformation behaviors of CFG piles are investigated. Research results indicate that when the shield tunnel completely passes through the railway subgrade, a 50 m long surface settlement trough forms, with a double-peak distribution curve. The bottom of CFG piles becomes loose after shield tunnelling beneath the railway subgrade, resulting in an effective pile length of 75% of the original length. The range of loosening in CFG piles in the horizontal and longitudinal sections of this project is determined as (-12.6 m, 12.6 m) by studying CFG piles at different positions.
KeywordsShield tunnel,   Tunnelling beneath high-speed railway subgrade,   CFG pile-soil structure,   Settlement; Effective pile length of CFG piles     
基金资助:国家自然科学基金项目(52378308, 52208355).
作者简介: 吴贝钰(1997-),男,硕士研究生,主要从事盾构近接施工控制方面的研究工作,E-mail: 1067140241@qq.com. 通讯作者:林星涛(1990-),男,博士,助理教授,主要从事盾构掘进土拱效应、盾构近接施工控制等方面的研究工作,E-mail: xtlin@szu.edu.cn.
引用本文:   
吴贝钰1 谢渭平2 林星涛1, 3, 4 高 晨2 苏 栋1等 .并行盾构下穿CFG桩加固高铁路基的沉降规律研究[J]  现代隧道技术, 2024,V61(6): 139-147
WU Beiyu1 XIE Weiping2 LIN Xingtao1, 3, 4 GAO Chen2 SU Dong1 etc .Study on Settlement Patterns of the CFG Pile-reinforced High-speed Railway Subgrade Caused by Parallel Shield Tunnelling[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(6): 139-147
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I6/139
 
没有本文参考文献
[1] 邱 伟1 曾庆成1 欧阳剑1 沐海星2 郭文琦2 封 坤2 胡大伟3.盾构隧道凹凸榫-斜螺栓构造环缝抗剪力学性能研究[J]. 现代隧道技术, 2024,61(6): 129-138
[2] 陈湘生1,2,3 陈伟杰2 李荣康2 顾问天1 卢 院1 李 强2,3 苏 栋2,3.盾构隧道足尺试验装配式加载平台的设计与应用[J]. 现代隧道技术, 2024,61(5): 1-9
[3] 魏立新1 杨春山1 刘力英1 宋棋龙2,3 苏 栋2,3.上硬下软复合地层大直径盾构掌子面稳定性研究[J]. 现代隧道技术, 2024,61(5): 21-28
[4] 祁 军1 王忠杰2,3,4 陈子君1 林存刚2,3,4 谢稳江1 梁 禹2,3,4.盾构隧道开挖引起的深层土体沉降槽宽度参数取值分析[J]. 现代隧道技术, 2024,61(5): 29-41
[5] 刘朝阳1 蒋 凯2 梁 禹2,3,4.基于Kerr地基模型的覆土荷载引起既有装配式地铁车站沉降分析[J]. 现代隧道技术, 2024,61(5): 71-78
[6] 袁作波1 简汶洋2 王 铎1 梁 禹2 胡 松1 林存刚2 秦英斌1 赵辰洋2.有压供水管线渗漏影响下盾构诱发地层 变形机理研究[J]. 现代隧道技术, 2024,61(5): 174-182
[7] 杨春山1 徐世杨2 魏立新1 陈俊生3.垂直顶升作用下盾构隧道力学特性模型试验研究[J]. 现代隧道技术, 2024,61(5): 210-218
[8] 张 羽1 周 鲁1 孙晓贺2 李 俊1 施成华2 刘胜利1.滨海地区地铁隧道渗漏成因与治理对策研究[J]. 现代隧道技术, 2024,61(5): 234-424
[9] 刘 博1,2 郑金雷1,3,4 张 昭1 麻建飞4.新建隧道上跨施工引起既有盾构隧道纵向变形力学模型研究[J]. 现代隧道技术, 2024,61(4): 112-118
[10] 刘肖汇1 封 坤1 郭文琦1 鲁选一1 彭长胜2 李姣阳2.内部结构施作方式对盾构隧道纵向力学特性的影响研究[J]. 现代隧道技术, 2024,61(4): 151-160
[11] 朱美恒1 陈思睿2 黄忠凯2 李永波1 张吾渝3 张冬梅2.地表超载作用下大直径全预制装配盾构隧道受力变形规律研究[J]. 现代隧道技术, 2024,61(4): 161-171
[12] 王志远1 杨 昊2 林 刚1 连正洲2 喻 波1.连接螺栓对盾构隧道振动响应的影响分析[J]. 现代隧道技术, 2024,61(4): 172-179
[13] 蔡光远1 唐泽人2 陈 辰3 朱元昌2 于朋臣3 柳 献2.大长细比预制中隔墙智能拼装设备研发[J]. 现代隧道技术, 2024,61(4): 275-282
[14] 黄 戡 吴奇江 邓 喜 李 徽.基于滑移面夹角线性变化的盾构隧道松动土压力计算方法研究[J]. 现代隧道技术, 2024,61(3): 8-17
[15] 陈立保1 封 坤2 孙文昊1 邢文杰2 潘 瑾2 耿珺洋2 王俊玲3.高水压作用下衬砌管片构件氯离子侵蚀数值模拟研究[J]. 现代隧道技术, 2024,61(3): 131-140
Copyright 2010 by 现代隧道技术