大变形隧道  ,初期支护  ,受力特征 ,对策研究," /> 大变形隧道初期支护受力特征及对策研究 [an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2012, Vol. 49 Issue (6) :70-74    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
大变形隧道初期支护受力特征及对策研究
(西南交通大学,交通隧道工程教育部重点实验室,土木工程学院,  成都 610031)
Study of the Force Characteristics of the Primary Support in a Tunnel with Large Deformation and Related Countermeasures
Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要       由于隧址区岩体具有大变形效应,渝利铁路某隧道在初期支护施作后拱腰、拱脚等部位相继出现喷射混凝土开裂、剥落、掉块等现象。为了保证隧道结构安全,采用现场测试(解除应力测试和松动圈测试)、数值模拟(试算/正演计算)等方法对该段支护结构的受力特征进行研究,并提出相应的对策措施。结果表明:在此地质条件下,初期支护配筋为6.36 cm2时,结构将产生破坏(最大弯矩处安全系数为1.0),而实际配筋只有5.07cm2,所以初期支护内的配筋(格栅钢架)不能满足工程实际需要,必须调整类似地质条件的支护参数才能保证隧道整体稳定性。同时研究获得的松动圈范围2.29m,与地质雷达的松动圈测试结果相吻合,验证了该方法的可行性及结果的正确性。
Service
把本文推荐给朋友  大变形隧道   初期支护   受力特征  对策研究

”几篇好文章,特向您推荐。请点击下面的网址:" name=neirong>
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
龚伦
孙克国
仇文革
关键词font-size: 10.5pt   mso-ascii-font-family: 'Times New Roman'   mso-font-kerning: 1.0pt   mso-hansi-font-family: 'Times New Roman'   mso-bidi-font-family: 'Times New Roman'   mso-ansi-language: EN-US   mso-fareast-language: ZH-CN    大变形隧道  ')" href="#">mso-bidi-language: AR-SA"> 大变形隧道     font-size: 10.5pt   mso-ascii-font-family: 'Times New Roman'   mso-font-kerning: 1.0pt   mso-hansi-font-family: 'Times New Roman'   mso-bidi-font-family: 'Times New Roman'   mso-ansi-language: EN-US   mso-fareast-language: ZH-CN   初期支护  ')" href="#">mso-bidi-language: AR-SA">初期支护     受力特征    对策研究     
Abstract: Concrete cracking, spalling, and rock falls occurred at both tunnel haunch and feet in the Daliang tunnel of the Chongqing-Lichuan railway because of the large deformation effect of the surrounding rock. Considering the safety of the tunnel, site tests (a stress relief test and a loose circle test) and numerical simulations (trial and positive calculation) were performed in order to study the characteristics of the support structure and put forth corresponding countermeasures. The results showed that under this geological condition, the primary support structure will be destroyed when the amount of reinforcement is only 5.07cm2 in the Daliang tunnel, which does not meet the requirement and must be adjusted. The study also found that the scope of a loose circle is 2.29m, which coincides with the result obtained by the geological radar; this testifies to the feasibility and correctness of this method.
Keywords:   
出版日期: 2012-03-19
基金资助:

基金项目:国家自然科学基金资助项目(项目批准号:51178399);中央高校基本科研业务费专项资金资助(SWJTU11ZT33)

作者简介: 作者简介:龚 伦(1960–),男,博士,副教授,主要从事隧道及地下工程领域研究,E-mail:gonglun33@126.com
引用本文:   
龚伦, 孙克国, 仇文革 .大变形隧道初期支护受力特征及对策研究[J]  现代隧道技术, 2012,V49(6): 70-74
GONG Lun, SUN Ke-Guo, CHOU Wen-Ge .Study of the Force Characteristics of the Primary Support in a Tunnel with Large Deformation and Related Countermeasures[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(6): 70-74
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2012/V49/I6/70
 
没有本文参考文献
[1] 蒋英礼 王劲松.基于反应位移法的盾构隧道横断面抗震计算[J]. 现代隧道技术, 2013,50(6): 52-57
[2] 黄 俊1 党发宁1 郭婵娟2.考虑围岩弹性模量劣化隧道稳定性分析方法探讨[J]. 现代隧道技术, 2013,50(6): 72-79
[3] 段群苗1 白浪峰2 任辉龙2.基于Hoek-Brown强度准则的大跨连拱隧道围岩稳定性分析[J]. 现代隧道技术, 2013,50(6): 94-100
[4] 周 勇1 杨林松2.公路隧道灾害事故分析及其风险评价[J]. 现代隧道技术, 2013,50(5): 18-22
[5] 刘东坤 巨能攀 霍宇翔.地质雷达在不同介质填充下的频谱差异分析[J]. 现代隧道技术, 2013,50(5): 23-28
[6] 李光耀 田大庆 龙伟.隧道有毒气体预警应急救护一体化监控系统研究[J]. 现代隧道技术, 2013,50(5): 29-33
[7] 刘绍堂 潘洁晨.一种隧道整体收敛变形的表达方法[J]. 现代隧道技术, 2013,50(5): 34-37
[8] 李玉峰1,2 彭立敏1 张永红2 黄国富2 雷明锋1.线性与非线性破坏准则下浅埋隧道围岩压力计算[J]. 现代隧道技术, 2013,50(5): 68-74
[9] 师海1 白明洲1 谭德庆2 王成亮1.复杂地质条件下岩溶隧道变形预测方法优化的探讨[J]. 现代隧道技术, 2013,50(5): 87-91
[10] 江强1.3 程海峰2 陈君平3.大直径泥水盾构地层损失参数GAP的修正与应用研究[J]. 现代隧道技术, 2013,50(5): 92-87
[11] 龙熙华1 贾宁娟1 万军2.基于ANP-BP模型地铁隧道沉降预测研究[J]. 现代隧道技术, 2013,50(5): 105-111
[12] 胡永利.基于AHP的模糊比较法在地铁施工中的应用[J]. 现代隧道技术, 2013,50(5): 123-128
[13] 史克臣.特大断面隧道高地应力条件下变形控制技术研究[J]. 现代隧道技术, 2013,50(5): 146-151
[14] 赵录学.城市轨道交通工程TBM选型分析研究[J]. 现代隧道技术, 2013,50(2): 7-13
[15] 杨海涛1 奚笑舟2 沈永芳2.水容重对沉管隧道管段浮运沉放的影响及检测[J]. 现代隧道技术, 2013,50(2): 34-38
Copyright 2010 by 现代隧道技术