[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2014, Vol. 51 Issue (5) :85-91    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
拱盖法隧道围岩稳定性模型试验研究
(1中国海洋大学环境科学与工程学院,青岛 266100;2北京交通大学土木建筑工程学院,北京 100044; 3青岛市市政工程管理处,青岛 266100)
Model Test on the Stability of the Surrounding Rock of a Tunnel Constructed by the Arch-Cover Method
(1 College of Environmental Science and Engineering, Ocean University of China, Qingdao 266100; 2 School of Civil Engineering, Beijing Jiaotong University, Beijing 100044; 3 Qiangdao Municipal Administration, Qingdao 266100)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  文章利用大尺寸模型试验,研究了拱盖法隧道开挖过程中地表的发展模式和围岩受力情况。结果表明:隧道开挖过程中地表沉降先后经历了缓慢沉降、快速沉降和缓慢沉降三个阶段,其中中导洞开挖、竖向支撑拆除是沉降快速发展的阶段,拱部二次衬砌完成后开挖下部围岩对地表变形贡献不大;在掌子面推进过程中,监测断面各部位围岩荷载的释放过程具有较大差异性,拱部围岩荷载相比于拱脚和边墙释放更快,且幅度更大;拱部围岩中导洞开挖和临时支撑拆除会导致已稳定的围岩压力二次释放;由于支护的及时跟进,围岩自承能力得以发挥,围岩径向收敛变形得到较好的控制;拱部围岩中导洞开挖和临时支撑拆除会导致已稳定的围岩压力二次释放,建议工程中应将拱顶沉降作为拱盖法围岩稳定判别的主要依据。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
杨忠年1
纪召启1
刘泉维2
3
关键词:   
Abstract: In this paper, surface deformation law and the force applied on surrounding rock during the arch-cover method of tunnel construction are studied by a large-scale model test. The results show that surface subsidence undergoes three settlement phases in the process of tunnel excavation: slow settlement, fast settlement, and slow settlement again. The fast development of surface subsidence occurred during middle pilot tunnel excavation and vertical bracing dismantlement. Excavation of the bottom surrounding rock had little impact on surface deformation when the secondary lining at the crown was completed. The load-releasing process of the surrounding rock at each part of the monitoring section was quite different while the working face was advancing, and the load-releasing speed at the tunnel crown was greater than that at the arch springing and sidewall. Excavation of the middle pilot tunnel at the tunnel crown and dismantlement of the temporary support resulted in a secondary pressure release of the stable surrounding rock. Radial convergence of the surrounding rock was well controlled, which is attributed to its self-supporting capacity and immediate support. Is it is suggested that crown settlement be considered a main criterion for judging the stabilization of the surrounding rock in tunnels characterized by the arch-cover method.
Keywords Arch-cover method,   Stability of surrounding rock,   Model test     
出版日期: 2014-08-17
作者简介: 作者简介: 杨忠年(1985-),男,博士研究生,主要从事岩土力学、隧道工程方面的研究工作,E-mail:zhnyang110@163.com
引用本文:   
杨忠年1, 纪召启1, 刘泉维2等 .拱盖法隧道围岩稳定性模型试验研究[J]  现代隧道技术, 2014,V51(5): 85-91
YANG Zhong-Nian-1, Ji-Zhao-Qi-1, Liu-Quan-Wei-2 etc .Model Test on the Stability of the Surrounding Rock of a Tunnel Constructed by the Arch-Cover Method[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(5): 85-91
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2014/V51/I5/85
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术