[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2015, Vol. 52 Issue (3) :14-22    DOI:
研究与综述 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
公路隧道双洞互补式通风适用性分析
(1长安大学陕西省公路桥梁与隧道重点实验室,西安 710064;2弗吉尼亚理工大学土木工程与环境工程系,黑堡 VA24060;3陕西省交通建设集团公司,西安 710075 )
Applicability Analysis of the Complementary Ventilation System in Twin-Tube Highway Tunnels
(1 Shaanxi Provincial Key Laboratory of Highway Bridge and Tunnel, Chang'an University, Xi'an 710064; 2 Department of Civil and Environmental Engineering, Virginia Polytechnic Institute and State University, Blackburg, VA24060; 3 Shaanxi Provincial Communication Construction Group, Xi'an 710075)
Download: PDF (1121KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究公路隧道双洞互补式通风的适用性,文章基于隧址海拔和温度、隧道长度和纵坡、隧道交通量和交通组成、隧道双洞间距等因素对互补式通风负荷比及通风效果的影响进行计算分析。研究结果表明:当隧道上下行通风负荷比大于1.5或隧道单向纵坡绝对值在 1.5%~2.0%之间时,适宜采用互补式通风;隧道长度在4.5~6 km之间时,采用双洞互补式通风最经济实用;交通量和交通组成的影响关系显示隧道大型车混入率在35%~50%之间时宜考虑采用互补式通风;双洞隧道适合采用互补式通风的最小间距为30 m。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王亚琼1
2
蒋学猛3
武义凯1
谢永利1
关键词:   
Abstract: In order to study the applicability of the complementary ventilation system in twin-tube highway tunnels, the effects on the complementary ventilation load ratio and ventilation efficiency are investigated and analyzed in terms of the influence factors, such as altitude, temperature, tunnel length, longitudinal slope, traffic flow, traffic composition and interval between the two tubes. The results show that: the complementary ventilation system should be adopted when the ventilation load ratio between the up-line and down-line tubes is above 1.5, or the absolute value of the one-way longitudinal slope is between 1.5%~2.0%;it is the most economic and practical way to apply the complementary ventilation system in twin-tube tunnels with lengths ranging from 4.5 km to 6 km; the complementary ventilation system should be considered when the mix rate of large vehicles is between 35%~50% based on the influence relation of traffic flow and traffic composition; and the minimum interval for twin-tube tunnels using the complementary ventilation is 30 m.
KeywordsHighway tunnel,   Complementary ventilation,   Applicability,   Required airflow,   Interval between two tubes     
基金资助:

基金项目:陕西自然科学基金(2014JM7245);中央高校基本科研业务费专项资金资助项目(2013G1502027,2013G3214011).

作者简介: 作者简介:王亚琼(1975-) ,男,博士研究生,副教授,主要从事隧道结构、运营环境研究工作, E-mail:ys08@gl.chd.edu.cn.
引用本文:   
王亚琼1, 2, 蒋学猛3等 .公路隧道双洞互补式通风适用性分析[J]  现代隧道技术, 2015,V52(3): 14-22
WANG Ya-Qiong-1, 2 , Jiang-Xue-Meng-3 etc .Applicability Analysis of the Complementary Ventilation System in Twin-Tube Highway Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(3): 14-22
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2015/V52/I3/14
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术