[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2015, Vol. 52 Issue (3) :95-102    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
穿越软硬交界面隧道结构动力响应特性研究
(1西南交通大学交通隧道工程教育部重点实验室,成都 610031; 2广州地铁设计研究院有限公司,广州 510308; 3福建工程学院,福州 350014)
A Study of the Dynamic Response Characteristics of a Tunnel Structure Through an Interface of Soft and Hard Rock
(1 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2 Guangzhou Metro Design and Research Institute Co. Ltd., Guangzhou 510308; 3 Fujian University of Technology, Fuzhou 350014)
Download: PDF (1135KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 高烈度地震区隧道洞口段穿越软硬交界面易遭受严重破坏。文章依托都汶高速公路龙溪隧道工程实例,采用数值模拟的方法,分析了隧道洞口段穿越不同软硬交界面倾角条件下隧道结构的地震动力响应特性。研究结果表明:隧道在穿越软硬交界面时,强震作用下衬砌结构相对位移明显增大,隧道衬砌在对角线方向的相对位移大于拱顶和仰拱的水平相对位移;在交界面软岩侧,隧道结构的相对位移随着交界面倾角的减小而增大,而硬岩侧地震动却对隧道结构变形影响较小;隧道穿越倾角小于45°交界面时,地震动对隧道上部结构(拱肩和拱顶)安全性能影响最大,安全系数局部小于1;交界面倾角大于45°时,地震动对隧道下部结构(仰拱和拱脚)影响最大。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
申玉生1
邹成路2
靳宗振3
王京伟1
关键词:   
Abstract: Tunnel portal sections passing through an interface of hard and soft rock are vulnerable to severe damage at this high intensity seismic area. Based on the Longxi tunnelon the Chengdu-Wenchuan expressway, the earthquake dynamic response of a tunnel portal structure was analyzed using the numerical simulation method for various inclination angles of the soft/hard rock interface. The results show that: 1) the relative displacement of the tunnel lining structure increases obviously during a strong earthquake when the tunnel structure passes through the interface between soft and hard rock, and the relative displacement of the tunnel lining in the diagonal direction is higher than the relative horizontal displacement at the tunnel crown and invert; 2) the relative displacement of the tunnel structure at the soft-rock side of the interface increases with the decrease of the inclination angle, while the earthquake motion has little influence on the tunnel structure deformation at the hard-rock side; and 3) under an inclination angle <45°, the earthquake motion has a crucial influence on the safety of the upper tunnel structures (crown and spandrel) with some safety factors being less than 1, and under an inclination angle >45°, the seismic motion has a significant effect on the lower part of the tunnel structure (invert and arch springing).
KeywordsTunnel engineering,   Interface between soft and hard rock,   Dynamic response,   Relative displacement,   High-intensity earthquake     
出版日期: 2014-08-23
基金资助:

基金项目:国家自然科学基金项目(No.41102220,No. 51178398);中央高校基本科研业务费专项资金(No.SWJTUCX014).

作者简介: 作者简介:申玉生(1976–),男,博士(后),副教授, 主要从事大跨度隧道施工力学及强震区山岭隧道抗减震技术研究,E-mail:sys1997@163.com.
引用本文:   
申玉生1, 邹成路2, 靳宗振3等 .穿越软硬交界面隧道结构动力响应特性研究[J]  现代隧道技术, 2015,V52(3): 95-102
SHEN Yu-Sheng-1, ZOU Cheng-Lu-2, JIN Zong-Zhen-3 etc .A Study of the Dynamic Response Characteristics of a Tunnel Structure Through an Interface of Soft and Hard Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(3): 95-102
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2015/V52/I3/95
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术