现代隧道技术 2015, Vol. 52 Issue (3) :193-199    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
大断面浅埋偏压隧道CRD法施工工序研究
(中南大学土木工程学院,长沙 410075)
A Study of the Construction Sequences of a Large-Section Shallow-Buried Unsymmetrical Loading Tunnel by the CRD Method
(School of Civil Engineering, Central South University, Changsha 410075)
Download: PDF (969KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章以良村隧道CRD法施工为工程背景,布设了变形监测点及内力测试元件,分析了CRD法施工隧道围岩变形情况及结构内力特征,并对CRD法施工隧道在不同开挖顺序下的开挖过程进行了数值模拟,分析比较了不同开挖顺序时的围岩位移、应力变化情况。结果表明:CRD法对各分部施工工序影响较大,且各分部对拱顶下沉的影响程度从大至小依次为①部、②部、③部和④部;隧道内侧围岩压力大于外侧,钢支撑内力均为压应力,且拱腰位置轴力大于其它部位。比较隧道开挖变形的差异以及结构的受力特点,结合数值分析结果,得出了山体外侧先开挖方案无论在围岩变形还是隧道结构受力方面相比于山体外侧后开挖都较小,安全系数相对较高。因此,合理的施工工序应该是先进行山体外侧开挖并施作初期支护,然后再在山体内侧开挖施工。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张家生
刘宝琛
关键词:   
Abstract: Using the Liangcun tunnel constructed with the CRD method as an example, the surrounding rock deformation and structural internal force characteristics are analyzed for tunnels constructed by the CRD method by installing deformation monitoring points and internal force testing elements. The surrounding rock displacement and stress variation under different excavation sequences are analyzed and compared by numerical simulation of the excavation process for a tunnel constructed using the CRD method. The results show that the CRD method has a great impact on the construction sequence of each construction part, while the magnitude of impact by each construction part on crown settlement are (from high to low): part one, part two, part three and part four. Rock pressure at the internal side of the mountain is larger than that at the outer side, and all the internal force of the steel brace is compressive stress with the maximum axial force located at the haunch. By comparing the deformation differences caused by tunnel excavation and the structural loading features, and based on a numerical analysis, it is concluded that first excavating a partial section at the outside of the mountain has great advantages in terms of surrounding rock deformation, structural stress and safety factors. Thus, the reasonable construction sequence is to first excavate the partial section outside of the mountain with primary support installation and then to excavate the other section inside of the mountain.
KeywordsShallow-buried tunnel,   CRD method,   Deformation monitoring,   Internal force test,   Numerical simulation,   Safety factor,   Reasonable construction sequences     
出版日期: 2013-12-29
基金资助:

基金项目:国家自然科学基金资助项目(NO.51378514); 昆明市科技计划资助项目(2014-01-A-G-02-3049).

作者简介: 作者简介:石 熊(1985-),男,博士研究生,主要从事隧道围岩稳定性、路基动力学方面的研究,E-mail:shixiong126@126.com
引用本文:   
石, 熊, 张家生等 .大断面浅埋偏压隧道CRD法施工工序研究[J]  现代隧道技术, 2015,V52(3): 193-199
SHI , XIONG , ZHANG Jia-Sheng etc .A Study of the Construction Sequences of a Large-Section Shallow-Buried Unsymmetrical Loading Tunnel by the CRD Method[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(3): 193-199
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2015/V52/I3/193
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术