隧道内瞬变压力对既有客运铁路提速影响研究
(成都铁路局工务处,成都 610081)
Influence of the Transient Pressure in a Tunnel on the Speed Increase of Existing Passenger Railway Lines
(Department of Maintenance and Repairing, Chengdu Railway Bureau, Chengdu 610081)
Download: PDF (3039KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为满足运力要求,成都铁路局计划将辖区内达成铁路既有线运营速度从160 km/h提高到200 km/h;遂成铁路既有线运营速度拟从160 km/h和200 km/h提高到250 km/h。为确保提速后乘客的舒适性,文章利用单维特征线法对列车在隧道中运行时的车内瞬变压力进行了计算,并与国内标准进行了比较,对提速车型做出了比选,验证了拟提高速度。研究结果表明:(1)从满足舒适度标准的角度考虑,建议选取CRH2型动车组作为运营列车,为此达成铁路及遂成线可分别提速至200 km/h和220 km/h;(2)单线隧道由于净空面积较小,在一定程度上对提速起控制作用,列车在双线隧道中运行时应尽量避免交会以降低瞬变压力超标的可能性;(3)除车速、断面面积的影响外,制定线路提速方案时更应注意运营列车的密封性能,并应坚持“一隧一算”的原则。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: In order to meet the requirements of transport capacity, Chengdu Railway Bureau plans to increase the operating speed of some existing railways, i.e., the speed of the Dachuan-Chengdu railway will be increased from 160 km/h to 200 km/h, and the speed of the Suining-Chengdu railway will be increased from 160 km/h and 200 km/h to 250 km/h. To ensure passenger comfort requirements after the speed-up, a single dimensional characteristic curve method was used to calculate transient pressure inside the train running in the tunnels, and the results were compared with domestic standards to select the vehicle type and verify the proposed speed. The results show that: considering the comfort standard, a CRH2 is recommended as the passenger train, allowing the operation speed of the Dachuan-Chengdu railway and the Suining-Chengdu railway to increase to 200 km/h and 220 km/h respectively; the single-track tunnel plays a controlling roll in the railway speed increase because of its small clearance area, and the passing of two trains should be avoided in the double-track tunnels to minimize the possibility of exceeding the transient pressure standard; in addition to the effects of operation speed and sectional area, more attention should be paid to the sealing property of trains regarding the speed-increase plans, and the principle of “independent dimensioning of every tunnel” should be maintained.
KeywordsExisting passenger dedicated railway line,   Speed increase,   Tunnel,   Transient pressure     
作者简介: 作者简介: 张 鹏(1980-),男,工程师,主要从事运营铁路桥隧技术管理工作,E-mail:18608038844@163.com.
引用本文:   
.隧道内瞬变压力对既有客运铁路提速影响研究[J]  现代隧道技术, 2016,V53(2): 101-106
.Influence of the Transient Pressure in a Tunnel on the Speed Increase of Existing Passenger Railway Lines[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(2): 101-106
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2016/V53/I2/101
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术