软土基坑变形时空演化规律研究
(1 河南理工大学土木工程学院,焦作 454000; 2 中国矿业大学深部岩土力学与地下工程国家重点实验室,徐州 221008; 3 中铁建设投资集团有限公司,深圳 518000)
A Study on the Spatial-Temporal Evolution Regularity of the Deformation of a Foundation Pit in Soft Soil
(1 State Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221008; 2 School of Mechanics & Civil Engineering, China University of Mining and Technology, Xuzhou 221008; 3 China Railway Construction & Investment Group Co. Ltd., Shenzhen 51800)
Download: PDF (5785KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 软土基坑开挖引起的土工公害问题日益突出。为得到软土基坑开挖引起的基坑变形时空演化规律,文章以深圳地铁11号线前海湾站基坑工程为背景,采用FLAC3D建立考虑淤泥地层蠕变特性影响和混凝土支撑强度随时间变化的三维数值计算模型,研究分析了基坑围护结构变形、地表沉降、支撑内力等随基坑开挖的时空变化规律。研究结果表明:随着基坑的逐步开挖,基坑桩最大位移位置将逐渐下移,桩位移形态由“前倾形”变为“弓形”,桩最大位移与基坑开挖时间大致呈指数衰减关系;基坑两侧地表沉降沿横向均呈“凹槽”分布模式且在距基坑边缘约6.5 m处出现沉降最大值,该值大小与开挖时间呈线性关系。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: The geotechnical hazards caused by the excavation of foundation pits in soft soil are becoming increasingly prominent. In order to obtain the spatial-temporal evolution regularity of foundation pit deformation caused by excavation in soft soil, a 3D numerical model that takes into account the influence of silt layer creep properties and the concrete brace strength changes over time was built using FLAC3D for the Qianhaiwan Station foundation pit of Shenzhen Metro Line 11. Through modelling simulations, this paper studies and analyzes the spatial-temporal evolution regularity of the support structure deformation of a foundation pit, as well as the surface settlement and internal force of the support as it changes with excavation. The results show that: 1) the maximum displacement position of the foundation pit pile will move downward with excavation, and the pile displacement pattern will change from a "forward-shaped" one to a "bow-shaped" one; 2) the maximum pile displacement approximately exhibits a tendency of exponential decay with the passing of excavation time; 3) surface subsidences on both sides of the foundation pit present a "groove-shaped" form along the transversal direction with maximum settlement occuring 6.5 m away from the margin of the foundation pit, and this settlement value has a linear relationship with the excavation time.
KeywordsSoft soil,   Foundation pit,   Creep,   Spatial-temporal evolution,   Pile displacement,   Surface settlement,   Axial force of support     
作者简介: 作者简介:林志斌(1988-),男,博士,讲师,主要从事隧道及地下工程方面的研究工作,E-mail: linzhibin999999999@163.com.
引用本文:   
.软土基坑变形时空演化规律研究[J]  现代隧道技术, 2016,V53(3): 82-90
.A Study on the Spatial-Temporal Evolution Regularity of the Deformation of a Foundation Pit in Soft Soil[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(3): 82-90
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2016/V53/I3/82
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术