[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2016, Vol. 53 Issue (4) :70-76    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
小规模下伏薄煤层采空区倾角对隧道开挖稳定性的影响研究
(1 中铁第一勘察设计院集团有限公司, 西安 710043; 2 西南交通大学 交通隧道工程教育部重点实验室,成都 610031)
Influence of Small-Scale Underlying Mined-out Areas with Different Dip Angles in Thin Seam on Tunnel Excavation Stability
(1 China Railway First Survey & Design Institute Group Co.,Ltd. Xi′an 710043; 2 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (4267KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 公路隧道近接下伏采空区施工必定会打破采空区的原始平衡状态, 出现应力重分布现象。为研究不同倾角下伏采空区对隧道施工稳定性的影响规律, 文章采用有限元软件构建采空区地层隧道计算模型并进行了数值计算, 研究了下伏采空区倾角对隧道洞周位移、 初期支护内力和塑性区的影响规律。计算结果表明: ①下伏采空区的存在加大了隧道洞周位移, 倾角越小, 增幅越大; ②下伏采空区的存在增强了初期支护内力分布离散性, 尤其是对拱顶内力影响幅度较大, 主要体现在隧道拱顶轴力降低, 倾角越小, 降低值越大; ③下伏采空区的存在增大了围岩塑性区, 甚至贯穿到采空区冒落带, 倾角越大, 塑性区越小。因此, 下伏采空区倾角越小, 隧道施工风险越高, 围岩稳定性越差, 结构受力越不利, 应采取有效措施提高下伏采空区的处治强度。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
符亚鹏 1 方 勇 2 崔 戈 2 郭建宁 2
关键词:   
Abstract: The original equilibrium state of underlying mined-out area is surely to be broken by the approaching construction of highway tunnels, and it will cause stress redistribution. In order to study the influence law of underlying mined-out areas with different dip angles on tunnel construction stability, it used finite element software to build a calculation model of tunnel in mined-out layer, carried out a numerical simulation, studied the influence law of underlying mined-out area with different dip angles on displacements around tunnel periphery, inner force of primary support and the plastic zone. The calculations indicate that the displacement around tunnel periphery increases with the decrease of dip angles of underlying mined-out areas; the distribution discreteness of inner force of primary support increases due to the mined-out area, the axial force of crown is largely influenced by this and characterized by the decreasing of axial force which has a verse relationship with the dip angle; the plastic zone of surrounding rock enlarges, even penetrates through the caving zone of mined-out area and has a verse relationship with the dip angle. Thus the smaller the angle of underlying mined-out area, the higher the construction risk, the worse the stability of surrounding rock and the more unfavorable regarding force applied on structure, which makes it necessary to take effective measures to improve the treatment for underlying mined-out areas.
Keywords:   
作者简介: 作者简介: 符亚鹏(1990-), 男, 硕士, 长期从事隧道结构设计等工作, E-mail: fyp19900328@foxmail.com. 通讯作者: 方 勇 (1981-), 男, 博士, 副教授, 长期从事长大公路隧道施工等方面的研究工作, E-mail: fy980220@swjtu.cn.
引用本文:   
符亚鹏 1 方 勇 2 崔 戈 2 郭建宁 2 .小规模下伏薄煤层采空区倾角对隧道开挖稳定性的影响研究[J]  现代隧道技术, 2016,V53(4): 70-76
FU Ya-Peng- 1 Fang- Yong- 2 Cui- Ge- 2 Guo-Jian-Ning- 2 .Influence of Small-Scale Underlying Mined-out Areas with Different Dip Angles in Thin Seam on Tunnel Excavation Stability[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(4): 70-76
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2016/V53/I4/70
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术