基于Kerr地基模型的隧道开挖诱发桩基变形简化方法
(1 国土资源部丘陵山地地质灾害防治重点实验室, 福州 350002;2 上海理工大学环境与建筑学院, 上海200093;3 中国建筑科学研究院建筑安全与环境国家重点实验室, 北京 100013; 4 成都理工大学地质灾害防治与地质环境保护国家重点实验室, 成都 610059)
Simplified Solution for Tunnelling-Induced Pile Foundation Deformation Based on the Kerr Foundation Model
(1 Key Laboratory of Geohazard Prevention of Hilly Mountains, Ministry of Land and Resources, Fuzhou 350002; 2 School of Environment and Architecture, University of Shanghai for Science and Technology, Shanghai 200093; 3 State Key Laboratory of Building Safety and Environment, China Academy of Building Research, Beijing 100013; 4 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059)
Download: PDF (5355KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  基于 Winkler 模型的弹性地基反力法是水平受荷桩分析中应用较为广泛的方法, 然而该模型忽略了地基土体的剪切作用。文章首先采用相较于 Loganathan和 Poulos(1998)解法更为精确的圆孔收缩理论计算隧道开挖引起的土体自由场位移; 然后基于可以充分考虑土体剪切特性的 Kerr地基模型, 将土体自由场位移施加于桩基,建立桩基变形在被动位移扰动下的简化解, 将土体自由场位移和桩身变形的计算结果与既有解析结果、 三维有限元数值模拟结果以及监测数据进行对比, 取得了较好的一致性, 验证了圆孔收缩理论更为精确的结论; 最后对 Kerr地基模型的相关参数、 桩径、 地层损失比和桩隧间距进行了分析。结果表明: 剪切层厚度、 桩径与桩身水平位移呈反比关系; 地基弹簧参数、 地层损失比、 桩隧间距与桩基水平位移呈正比关系; 当剪切层厚度为 0时, 地基模型退化成Winkler地基模型; 当地基弹簧参数取无穷大时, 模型退化为Pasternak地基模型。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张治国 1
2
3
4 鲁明浩 2 徐 晨 2 宫剑飞 3 赵其华 4
关键词:   
Abstract: The elastic subgrade reaction method based on the Winkler foundation model is widely used in the anal? ysis of laterally loaded piles. However, the shearing action in the foundation soil mass is neglected in this model. For this reason, the free-field soil mass displacements induced by tunnelling were calculated using the cylinder cavity contraction theory, which is more accurate than the Loganathan & Poulos (1998) solution. Then, based on the Kerr foundation model, which fully considers the shearing behaviors of the soil mass, the free-field soil displacement was applied to the pile foundation and a simplified solution for pile foundation deformation under the disturbance of passive displacements was established. The calculated results of the soil mass free-field displacements and pile deformations were compared with existing calculated results, 3D FEM numerical simulation results and measured data,and consistency was achieved with the cylinder cavity contraction theory proven to be more accurate. Finally, relative parameters of the Kerr foundation model, pile diameters, ground loss ratio and spacing of the pile and tunnel were analyzed. The results show that the thickness of the shear layer and pile diameter are inversely proportion to the pile′s lateral displacement; the ground spring parameter, ground loss ratio and spacing between the pile and tun? nel are proportional to the lateral displacement of the pile foundation; and when the thickness of the shear layer is zero, the foundation model degenerates into a Winkler foundation model, while the foundation spring parameters set as infinity means the foundation model degenerates into a Pasternak foundation model
KeywordsTunnel construction,   Pile foundation deformation,   Cylinder cavity contraction theory,   Kerr foundation model,   Simplified solution     
基金资助:基金项目: 上海自然科学基金项目(15ZR1429400); 国土资源部丘陵山地地质灾害防治重点实验室课题(2015k005); 建筑安全与环境国家重点实验室课题(BSBE2015-01); 地质灾害防治与地质环境保护国家重点实验室基金项目(SKLGP2015K015)
作者简介: 作者简介: 张治国(1978-), 男, 博士后、 副教授、 硕士生导师, 主要从事地下工程施工对周边环境影响控制方面的研究工作, E-mail: zgzhang@usst.edu.cn.
引用本文:   
张治国 1, 2, 3等 .基于Kerr地基模型的隧道开挖诱发桩基变形简化方法[J]  现代隧道技术, 2016,V53(6): 55-66
ZHANG Zhi-Guo- 1, 2 , 3 etc .Simplified Solution for Tunnelling-Induced Pile Foundation Deformation Based on the Kerr Foundation Model[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(6): 55-66
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2016/V53/I6/55
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术