关于季节性岩溶管道流对某快速铁路隧道衬砌破坏的分析与思考
(1西南交通大学土木工程学院, 交通隧道工程教育部重点实验室, 成都 610031; 2成都铁路局, 成都 610082; 3中南大学土木工程学院, 长沙 410075; 4中铁西南科学研究院有限公司, 成都 611731)
Analysis and Considerations of an Express Railway Tunnel Lining Failure by Seasonal Karst Conduct Flow
(1 School of Civil Engineering of Southwest Jiaotong University, Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu 60031; 2 Chengdu Railway Bureau, Chengdu 610082; 3 School of Civil Engineering, Central South University,Changsha 410075; 4 China Railway Southwest Research Institute Co. Ltd., Chengdu 611731)
Download: PDF (5080KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  受建设环节中诸多不利因素及其组合的影响,不同程度的铁路隧道衬砌质量缺陷时有发生且未被发现,导致运营后的隧道存在安全隐患,不同程度地威胁运营安全和运输秩序,甚至发生安全事故, 导致财产损失和停运。文章以某快速铁路隧道因季节性管道流导致边墙厚度不足处衬砌产生压溃性破坏为案例,分析衬砌在设计厚度和边墙局部欠厚两种情况下所能承受的不同水压力。结果表明, 即使衬砌符合设计,依然无法承受季节性岩溶管 道流可能产生的峰值压力; 由于局部厚度不足边墙处率先被压溃,及时释放了突发水压力,可能降低了衬砌更大范围和整体性破坏的更大风险; 对存在季节性岩溶管道流的隧道, 应采取措施充分降低或消除季节性高压水产生的风险。文章最后对本工程变更设计方案等方面存在的问题进行了反思。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王 刚 1 王立川 2
3 仇文革 1 龚 伦 1 吴 剑 4
关键词:   
Abstract: It is very common for railway tunnel linings to have some undiscovered quality defects due to various un? favorable factors in the construction process, which may threaten operational safety and transportation order; can cause accidents; and may result in property loss and shut down train operations. In this paper, using a crushing failure at a thin sidewall lining due to seasonal karst conduct flow as an example, we analyze water pressures that the tunnel lining bears related to the design lining thickness and insufficient sidewall lining thickness. Results show that the tunnel lining cannot bear the peak pressure that might be produced by a seasonal karst conduct flow although the lining design meets relative requirements; however, water pressure is reduced because the local sidewall is crushed due to insufficient thickness, possibly avoiding the risk of a larger and entire failure of the lining structure. Regarding a tunnel with seasonal karst conduct flow, it is necessary to take corresponding measures to fully mitigate or eliminate risks caused by seasonal high water pressure. Furthermore, the paper reviews problems concerning design alternatives for this project.
KeywordsSeasonal karst conduct flow,   Construction defect,   Lining failure,   Risk management     
基金资助:基金项目: 高铁联合基金 (U1434206); 国家自然科学基金资助项目 (51478392) .
作者简介: 作者简介: 王 刚(1989-),男,博士研究生,主要从事桥梁与隧道工程方面的研究工作, E-mail: gonglun33@126.com.
引用本文:   
王 刚 1 王立川 2, 3 仇文革 1 龚 伦 1 吴 剑 4 .关于季节性岩溶管道流对某快速铁路隧道衬砌破坏的分析与思考[J]  现代隧道技术, 2016,V53(6): 210-218
WANG Gang- 1 Wang-Li-Chuan- 2, 3 Chou-Wen-Ge- 1 Gong- Lun- 1 Wu- Jian- 4 .Analysis and Considerations of an Express Railway Tunnel Lining Failure by Seasonal Karst Conduct Flow[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(6): 210-218
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2016/V53/I6/210
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104