复杂地质条件下软岩隧道大变形破坏机制及开挖方法研究
(1 西南交通大学交通隧道工程教育部重点实验室,成都 610031; 2 中国交通建设股份有限公司,北京100088)
ailure Mechanism and Excavation Method for Soft-Rock Tunnels with Large Deformation under Complex Geological Conditions
(1 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2 China Communications Construction Company Ltd., Beijing 100088)
Download: PDF (5608KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 通过对汶马高速公路鹧鸪山软岩隧道多次出现的大变形现象进行分析,文章将围岩破坏分为 3大类,即软岩塑流、板梁弯曲变形及结构面滑移。针对建设过程中的大变形问题,选取了 50 m典型围岩区段作为试验段,开展了两台阶开挖参数优化试验及两台阶与三台阶开挖工法的比选试验。两台阶开挖参数优化试验表明,开挖进尺以及下台阶左右侧前后间距对隧道的稳定性影响最大。开挖工法比选试验中,通过对两台阶与三台阶开挖洞周位移、围岩与初期支护间压力及钢拱架受力的对比发现,两台阶开挖方法由于一次开挖断面过大,围岩来压快,导致洞周变形值及围岩与初期支护压力值相对偏大,钢拱架安全储备相对不足。因此,对于处于复杂区域环境中的软岩隧道,应结合现场实际情况适当调整围岩的预留变形量;合理地选择开挖工法与开挖进尺,且在围岩条件很差的情况下,采用三台阶法可有效控制大变形灾害的产生。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: By analyzing the large deformation events that occurred in the Zhegushan tunnel of the WenchuanMaerkang expressway, the rock failures are divided into three categories: plastic flow of soft rock, bending deforma? tion of the plate girder and slipping of the structural surface. A comparison of the two-step excavation method and three-step excavation methodwas performed for a 50-meter-long test section with a typical rock mass. The results show that for the two-step excavation method, the advance rate and construction space between the left and right side of the lower bench have a significant effect on tunnel stability. Based on a comparison of the tunnel′s peripheral displacement, contact pressure between the surrounding rock and the initial support (as well as the internal force of the steel arch) for the two-step and three-step construction methods, it is found that for the two-step excavation method, the tunnel′s peripheral deformation, the pressure between surrounding rock and the initial support are relatively large since the one-pass excavation section is very large and the pressure of the rock mass increases too quickly, and the safety reverse of the steel arch is not enough. For tunnels in complex regions or environments, the re? served deformation volume of the rock mass should be adjusted for the actual situation at the site, a reasonable construction method and tunnel advance rate should be chosen and the three-step construction method can effectively control the occurrence of large deformation in cases of unfavourable rock masses.
KeywordsSoft rock tunnel,   Large deformation,   Failure mode,   Field test     
基金资助:

基金项目:国家重点研发计划重点专项(2016YFC0802201)..

作者简介: 作者简介:徐国文(1988-),男,工学博士,从事隧道及地下工程研究工作,E-mail:xgw80033@163.com.
引用本文:   
.复杂地质条件下软岩隧道大变形破坏机制及开挖方法研究[J]  现代隧道技术, 2017,V54(5): 146-154
.ailure Mechanism and Excavation Method for Soft-Rock Tunnels with Large Deformation under Complex Geological Conditions[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(5): 146-154
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2017/V54/I5/146
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术