[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2017, Vol. 54 Issue (6) :63-69    DOI:
研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
开、闭条件下冻结温度场的差异性研究
(1 河北工业大学土木与交通学院,天津 300401;2 河北省土木工程技术研究中心,天津 300401;3 河北工业大学能源与环境工程学院,天津 300401;4 天津市地下铁道集团有限公司,天津 300051)
Differences of Freezing Temperature Field under Opening and Closing Conditions
(1 School of Civil and Transportation Engineering, Hebei University of Technology, Tianjin 300401; 2 Hebei Research Center of Civil Engineering Technology, Tianjin 300401; 3 School of Energy and Environment Engineering, Hebei University of Technology, Tianjin 300401; 4 Tianjin Metro Group Co. Ltd., Tianjin 300051)
Download: PDF (2403KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 人工冻结法主要应用于地铁联络通道施工及盾构接收过程中。冻结帷幕的形成及性状受冷源、地质条件等诸多因素影响,冻结土层的工程性质及结构状态均可由温度的分布及演变来反映。文章搭建低温换热试验台,通过加设补水装置,对开放、闭合两种环境系统下土的冻结温度、湿度场变化特性进行试验,分析有无补水条件下两场的差异性。结果表明,计算冻结区域的平均温度需考虑沿管长度方向的积分值;补水条件下温度场的发展过程略快于无补水情况,冻结锋面随时间均呈指数变化,且有水补给时锋面移动速度较快。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: The artificial freezing method is commonly applied to the construction of subway cross passages and for shield receiving. The formation and characteristics of the freezing curtain are influenced by factors such as the cold source and geological conditions. The engineering properties of frozen soil and frozen structures are reflected by the distribution and evolution of the temperature. Through a low-temperature heat transfer bench, the variation characteristics of temperature and moisture fields are tested for an opening system and a closing system with a water supply device, and the differences of the two fields with or without the water supply device are analyzed. The results show that the integral value along the tube length should be considered during calculation of the average temperature in the freezing region; the development process of the temperature with a water supply device is slightly faster than that without a water supply device; and the freezing front varies exponentially with time and moves faster with a water supply device.
KeywordsArtificial freezing,   Temperature field,   Water supply,   Moisture field,   Freezing front     
基金资助:

基金项目:国家自然科学基金项目(41272335,41472253);天津市建设系统第一批科学技术发展计划(2014-8);河北工业大学“大学生创新创业训练计划”(201410080086).

作者简介: 作者简介:李 敏(1985-),女,博士,副教授,主要从事地基工程及土类多孔介质的多场耦合研究工作,E-mail:limin-0409@163.com.cn
引用本文:   
.开、闭条件下冻结温度场的差异性研究[J]  现代隧道技术, 2017,V54(6): 63-69
.Differences of Freezing Temperature Field under Opening and Closing Conditions[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(6): 63-69
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2017/V54/I6/63
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术