地铁盾构掘进引起的软弱地层沉降分析
(1 广西大学土木建筑工程学院,南宁 530004;2 西南交通大学交通隧道工程教育部重点实验室,成都 610031;3 深圳市市政设计研究院有限公司,深圳 518029)
Analysis of Ground Settlement Induced by Shield Tunnel Construction in a Soft Layer
(1 College of Civil Engineering and Architecture, Guangxi University, Nanning 530004; 2 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3 Shenzhen Municipal Design & Research Institute Co. Ltd., Shenzhen 518029)
Download: PDF (3034KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 昆明地铁首次在含有泥炭质土软弱地层中采用盾构法施工,难度极大。文章依托昆明地铁首期工程实践,考虑含有泥炭质土软弱地层条件下先行隧道施工对后行隧道施工的影响,建立修正的 Peck公式对地表沉降进行计算,在此基础上采用数值方法进一步分析该软弱地层条件下地铁盾构掘进引起地层沉降变形规律,并与地层沉降预测经验公式对比。研究表明:本文方法与数值模拟结果以及现场监测数据吻合较好,可以较好地分析含泥炭质土软弱地层中盾构掘进引起的地层变形规律;先施工隧道的外侧地表沉降变化率较大,后施工的隧道外侧地表沉降变化率较小,但横向沉降范围较大;最大沉降量位于两隧道轴线的中线和先施工隧道的轴线之间,主要由先施工的隧道引起。最后,结合盾构施工监测数据,提出了含泥炭质土软弱地层条件下地铁盾构施工地层变形控制技术措施。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: The construction of the Kunming Metro Line marks the first time China has built a tunnel in a soft layer containing peat soil using the shield method. Focusing on the engineering practices for this metro line, a corrected Peck formula is set up to calculate the ground surface settlement considering the influence of the construction of the first tunnel tube on the second tunnel tube in a soft layer containing peat soil. The law of ground settlement caused by shield construction is studied and compared to the empirical formula for ground settlement prediction. The results from this method and the numerical simulation agree very well with the measured data and can be used to analyze the shield-induced deformation law of soft ground containing peat soil. Compared to the change rate of ground surface settlement outside of the second tunnel tube, the change rate is larger for the first tunnel tube and its transverse settlement range is smaller, while the maximum settlement occurs between the center line of the two tunnel tube axes and first tunnel tube axis, and is caused by the construction of the first tunnel tube. Based on monitoring data from shield construction, the technical countermeasures against ground deformation caused by shield construc? tion in soft stratum containing peat soil are proposed.
KeywordsStratum containing peat soil,   Shield tunnel,   Peck formula,   Three-dimensional finite-element numeri? cal simulation,   Settlement prediction,   Settlement control     
基金资助:

基金项目:国家自然科学基金资助项目(51078319、51178398)

作者简介: 作者简介:蒙国往(1987-),男,博士,主要从事隧道及地下结构方面的研究工作,E-mail: menggwang@163.com. 通讯作者:周佳媚(1973-),女,博士,教授,主要从事隧道及地下结构方面的研究工作,E-mail: tmzjm@home.swjtu.edu.cn.
引用本文:   
.地铁盾构掘进引起的软弱地层沉降分析[J]  现代隧道技术, 2017,V54(6): 117-125
.Analysis of Ground Settlement Induced by Shield Tunnel Construction in a Soft Layer[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(6): 117-125
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2017/V54/I6/117
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104