软岩隧道浅埋段围岩全位移空间分布特征研究
(1 长安大学特殊地区公路工程教育部重点实验室,西安 710064;2 陕西铁路工程职业技术学院轨道工程系,渭南 714000)
Spatial Distribution Characteristics of the Full Displacement of Surrounding Rock of a Shallow-Buried Tunnel Section in Soft Rock
(1 Key Laboratory for Special Area Highway Engineering of Ministry of Education, Chang′an University, Xi′an 710064; 2 Railway Engineering Department, Xi′an Railway Vocational & Technical Institute, Wei'nan 714000)
Download: PDF (3186KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 围岩位移信息的收集对指导新奥法隧道施工具有重要意义。在各种因素制约下,围岩位移信息采集不可避免存在损失位移。文章依托阿拉坦隧道工程实例,以现场实测全位移数据为基础,确定了各施工阶段的围岩应力释放率,并在此基础上,对隧道浅埋洞口段地表与拱部围岩的全位移变化规律进行了三维数值分析。结果表明:隧道开挖过程中,地表测点竖向位移最大为 33 mm,与实测结果基本一致,且地表测点竖向位移远大于水平位移,竖向损失位移比例占围岩总位移量的比例高达 42.86%;隧道拱顶围岩竖向位移计算值为 60 mm,与现场实测结果基本一致,隧道拱部围岩不同方向的损失位移所占全位移的比例不同,水平方向约为21.42%,竖向高达40%以上;掌子面通过监测断面前后约1.0倍洞径范围内围岩变形速率较大,在此区间,围岩竖向位移发生量约占总沉降量的70%。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Information collection for surrounding rock displacement is important for guiding tunnel construction with NATM. Loss of displacement information due to restriction of various factors is inevitable. Based on site-measured data of full displacement in the Alatan tunnel, the release rate of surrounding rock stress at various construction stages is determined, and a 3D numerical analysis of the variation law of the full displacement at the ground surface of a shallow portal section and surrounding rock at the tunnel crown is performed. The results indicate that: 1)the maximum vertical displacement at the surface, measuring 33 mm during tunnel construction, conforms to the measured data, while the vertical displacement at the surface measuring point is far larger than that of the horizontal displacement, and the vertical displacement loss is 42.86% of the total displacement of the surrounding rock; 2) the calculated vertical displacement of the surrounding rock at the tunnel crown is 60 mm, which basically conforms to the site-measured data; 3) the percentages of displacement loss of the surrounding rock at the crown are different in different directions, with 21.42% in the horizontal direction and more than 40% in the vertical direction; and 4) the deformation rate is relatively large—within the scope of 1.0 times the tunnel diameter before and after it passes through the monitoring section—with the vertical displacement being 70% of the total settlement.
KeywordsTunnel engineering,   Bench method,   Full displacement of surrounding rock,   Field test,   Numerical analysis     
基金资助:

基金项目:内蒙古自治区交通厅科技项目(NJ-2007-02).

作者简介: 作者简介:李又云(1973-),男,博士,副教授,主要从事岩土与隧道工程方面的教学与研究工作,E-mail:liyouyun2006@163.com. 通讯作者:张玉伟(1989-),男,博士,主要从事岩土与隧道工程研究工作,E-mail:1032659676@qq.com.
引用本文:   
.软岩隧道浅埋段围岩全位移空间分布特征研究[J]  现代隧道技术, 2018,V55(1): 114-123
.Spatial Distribution Characteristics of the Full Displacement of Surrounding Rock of a Shallow-Buried Tunnel Section in Soft Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(1): 114-123
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2018/V55/I1/114
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术