基于原岩应力的关角隧道变形潜势研究
(1兰州交通大学甘肃省道路桥梁与地下工程重点实验室,兰州 730070;2兰州交通大学道桥工程灾害防治技术国家地方联合工程实验室,兰州 730070;3中铁第一勘察设计院集团有限公司,西安 710043;4西北民族大学土木工程学院,兰州 730030)
Deformation Potential of the Guanjiao Tunnel Based on Original Geo-stress
(1 Key Laboratory of Road & Bridge and Underground Engineering of Gansu Province, Lanzhou Jiaotong University, Lanzhou 730070; 2 National and Provincial Joint Engineering Laboratory of Road & Bridge Disaster Prevention and Control, Lanzhou Jiaotong University, Lanzhou 730070; 3 China Railway First Survey and Design Institute Group Ltd., Xi′an 710043; 4 School of Civil Engineering, Northwest University for Nationalities, Lanzhou, Gansu 730030)
Download: PDF (1513KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 针对新关角隧道二郎洞断层束地段在高地应力条件下的围岩变形问题,基于原岩地应力测试的地应力场拓展结果及其它主要影响因素,文章提出了围岩变形潜势的概念及其等级划分的标准,通过样本统计并采用神经网络算法获得了关角隧道的变形潜势分布图。结果表明,关角隧道岭脊段、高和极高地应力段、宽大断层以及断层束地段具有Ⅰ级、Ⅱ级和Ⅲ级大变形潜势,仅有部分地段属于常规变形潜势,凸显出关角隧道在复杂的软弱地层条件和极高地应力状态共同条件下具有显著的大变形潜势。通过较准确地判定关角隧道各段的变形潜势,经修正、优化设计和施工措施后,大部分监测结果被控制在常规变形范围内,其余均被控制在 I级大变形范围内,效果较好。该研究成果为解决类似条件下的围岩大变形问题提供了一种准确、实用的预测与控制方法。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Aiming at the surrounding rock deformation of the Erlangdong fault bundle at the location of the new Guanjiao tunnel under high geo-stress, a concept of surrounding rock deformation potential and its classification criterion are put forward based on the geo-stress field extension results from the original geo-stress test and the main influencing factors. The distribution of the deformation potential in the Guanjiao tunnel is obtained by sample statistics and the neural network algorithm. The results show that the ridge section, sections with high and extremely high geo-stress, large fault section and fault bundle section of the Guanjiao tunnel have a deformation potential of gradesⅠ, Ⅱ and Ⅲ, and only partial sections have common deformation potential, which indicates the Guanjiao tunnel has large deformation potential under the complex conditions of soft rock and extremely high geo-stress. By determining the deformation potentials of each section in the Guanjiao tunnel, most of the monitoring results are controlled within the scope of common deformation after the means of correction, optimization design and construction, and the rest of the deformations are controlled within the scope of grade I. This achievement provides an accurate and practical forecasting and controlling method to solve the problem of large deformation in similar conditions.
KeywordsHigh geo-stress,   Soft rock,   Guanjiao tunnel,   Neural net,   Forecast model,   Deformation potential     
基金资助:

基金项目:国家自然科学基金(11662007);长江学者和创新团队发展计划滚动资助(IRT_15R29).

作者简介: 作者简介:陈志敏(1979-),男,博士,副教授,主要从事隧道及地下工程研究与教学工作,E-mail: chenzhimin0523@126.com.
引用本文:   
.基于原岩应力的关角隧道变形潜势研究[J]  现代隧道技术, 2018,V55(4): 33-41
.Deformation Potential of the Guanjiao Tunnel Based on Original Geo-stress[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(4): 33-41
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2018/V55/I4/33
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术