Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2011, Vol. 48 Issue (3) :59-63    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Discussion on Insulation Design for Tunnels in High-altitude
and Severe Cold Region and Thermal Calculation Method
(Survey & Design Research Institute of Sichuan Provincial Communication Department, Chengdu  610017 )
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The domestic research achievements for tunnels in high-altitude and severe cold region is not so rich that can't meet the requirement of tunnel design. Taking the research findings of house building industry in China and National Railway in Japan for reference, the design calculation methods of portal insulation length, lining heat preservation and ditch heat preservation appropriate for tunnels in seasonal frozen ground are put forward.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Sheng
Keywords Tunnels in high-altitude and severe cold region   Heat preservation design   Calculation method     
Abstract: The domestic research achievements for tunnels in high-altitude and severe cold region is not so rich that can't meet the requirement of tunnel design. Taking the research findings of house building industry in China and National Railway in Japan for reference, the design calculation methods of portal insulation length, lining heat preservation and ditch heat preservation appropriate for tunnels in seasonal frozen ground are put forward.
Keywords Tunnels in high-altitude and severe cold region,   Heat preservation design,   Calculation method     
published: 2011-03-29
Cite this article:   
ZHANG Sheng .Discussion on Insulation Design for Tunnels in High-altitude
and Severe Cold Region and Thermal Calculation Method[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(3): 59-63
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I3/59
 
No references of article
[1] CUI Guangyao1 DAI Aimeng1 MA Jianfei2 NING Maoquan3.Study on Calculation Method and Influencing Factors of Carbon Emission during Construction of Rectangular Pipe-jacking Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 126-134
[2] GUO Chun1,2 GUO Yalin1,2 CHEN Zheng1,2.Carbon Emission Accounting and Research Progress Analysis of Traffic Tunnel Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 1-10
[3] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[4] .Calculation Method and Engineering Application of Drawdown Induced by Tunnel Water Leakage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 86-92
[5] WANG Zhilong1,2 ZHOU Renqiang3 YANG Nie1,2 WANG Mingnian1,2 LIU Dagang1,2.Hoek-Brown Criterion Based Calculation Method of Rock Resistant Coefficient in Tunnelling and Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 84-90
[6] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[7] WANG Jialei JI Xinbo.Comparative Analysis of Calculation Methods for Jacking Force of Jacking Pipes[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 11-18
[8] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[9] YU Cheng-Shuo-1, 2 , DING Wen-Qi-1, 2 , ZHANG Qing-Zhao-1, 2 .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 11-18
[10] QIU Mingming1 YANG Guolin1 WU Zhenqing2 JIANG Anlong3 LIN Yuliang1.Distribution Laws of Surface Settlement Induced by Shield Construction of Twin-Tube Metro Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 96-105
[11] LI Xiao-Lin- 1, 2 Tao-Lian-Jin- 1 Guo- Ting- 2 Hui-Li-Ping.Practical Calculation Method for the Construction of Parallel Shield Tunnels with Small Spacing[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 161-167
[12] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[13] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[14] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[15] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY