Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | ����
MODERN TUNNELLING TECHNOLOGY 2014, Vol. 51 Issue (3) :67-72    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analysis of Karst Development Zones Based on Surface Settlement
(1 Institute of Geotechnical and Geological Engineering, Fuzhou University, Fuzhou, 350108; 2 China Railway Tunnel Group Co. Ltd, Luoyang, 471009)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract  Water inrush often occurs during tunnel construction in karst areas due to their complexity, and this frequently results in surface settlement. This paper proposes an analytical method for construction in a karst development zone in light of water inrush induced surface settlement, namely to analyze the features of the surface settlement with a settlement diagram, to determine the geological structures of the karst development zone, to study the zone's boundary with geological data related to the settlement area, and to analyze the supply relation between the water inrush and rivers according to the relationship between the settlement centre and the rivers. Additionally, using the data of surface settlement induced by water inrush at YDK24+098 of the Xiangshan tunnel on the Longyan-Xiamen railway, this paper analyzes the geological structures of the karst development zone, the longitudinal boundary of the karst, and the supply relation between the water inrush and the rivers, thereby verifying the feasibility of the above mentioned analytical method.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Cheng-Yu-1
Liu-Zhao-Wei-2
Keywords�� Tunnel construction   Karst   Water inrush   Surface settlement   Geological structures     
Abstract�� Water inrush often occurs during tunnel construction in karst areas due to their complexity, and this frequently results in surface settlement. This paper proposes an analytical method for construction in a karst development zone in light of water inrush induced surface settlement, namely to analyze the features of the surface settlement with a settlement diagram, to determine the geological structures of the karst development zone, to study the zone's boundary with geological data related to the settlement area, and to analyze the supply relation between the water inrush and rivers according to the relationship between the settlement centre and the rivers. Additionally, using the data of surface settlement induced by water inrush at YDK24+098 of the Xiangshan tunnel on the Longyan-Xiamen railway, this paper analyzes the geological structures of the karst development zone, the longitudinal boundary of the karst, and the supply relation between the water inrush and the rivers, thereby verifying the feasibility of the above mentioned analytical method.
Keywords�� Tunnel construction,   Karst,   Water inrush,   Surface settlement,   Geological structures     
published: 2013-11-05
Cite this article:   
LIU Cheng-Yu-1, Liu-Zhao-Wei-2 .Analysis of Karst Development Zones Based on Surface Settlement[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(3): 67-72
URL:  
http://www.xdsdjs.com/EN/      ��     http://www.xdsdjs.com/EN/Y2014/V51/I3/67
��
No references of article
[1] CUI Guangyao1 SUN Lingyun2 ZUO Kuixian1 WANG Mingnian3 JING Hongfei4.Review of Researches on Mechanical Behaviors of Tunnel Fiber Reinforced Concrete Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 1-7
[2] SUN Huixiang.On Failure Mechanism of Surrounding Rocks of the Deep-buried Underground Cavern Group under High Geostress and Its Countermeasures[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 8-17
[3] YUAN Xianfan1 LIAO Dan2.Research on Interpretation Method of TRT Test Results Based on GOCAD[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 18-24
[4] ZHANG Xiaolin1 CAI Jianhua2 LIAO Yankai2.Characteristics Analysis and Forecast Evaluation of Gas Occurrence of the Longquanshan Tunnel on Chengdu Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 25-30
[5] PENG Bin1�� 2 ZHU Zhiheng2 YANG Junsheng2 FU Jinyang2 HE Hongbo1.On Digital Identification of Water Leakage at Tunnel Lining Based on the Panoramic Developed Image[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 31-37
[6] HUANG Yinding1��2.Study on the Planning Technology for Metro Built by Double Shield TBM in Old Urban Area[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 38-44
[7] ZHANG Jinwei1 LIU Zhiguang1 LU qingquan2 ZHANG zhiwei2.On Application and Promotion of BIM Technique in Urban Rail Transit Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 45-52
[8] XUE Gang ZHANG Xia.Economical and Ecological Evaluation Index System of the Urban Utility Tunnel Based on PSO-BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 53-58
[9] WEN Xiaokai SUN Kun LIU Liang.Conception of IOT Technology Based Information System for Subway Patrol[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 59-64
[10] SUN Qiangqiang1 BO JingShan1, 2 LIU Hongshuai3 JING Liping2.Effects of a Tunnel on Ground Motion Amplification[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 65-71
[11] LI Jidong1,2 YOU Xinhua1.Seismic Response of the Metro Station with Pre-constructed Pipe-roof Integrating Support and Structure under Strong Earthquake Effect[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 72-78
[12] ZHUO Bin1 LI Sheng1 HE Chuan2 WANG Huan3 WANG Qicai1 MA Li4.Study on Mechanical Characteristics and Section Design of Trench Type Opencut Tunnel Lining Structure with Deep Covering Soil under Load Reduction[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 79-87
[13] CHEN Ming GUAN Huisheng XIE Youhui.Research on Pitch and Thrust Allocation of Shield Used in Inclined Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 88-94
[14] WANG Xueliang1 JI Xinbo2 XIA Mengran1 TAN Zhiming2 HOU Zhiqiang2 ZHANG Jihua2.Monitoring and Analysis of Pipe Jacking Force in the Shenyang Urban Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 95-101
[15] ZENG Lai1 LIU Yong2 YANG Hongyun2,3 GUO Ping4.Optimization of Loosing Circle Support of Stoping Roadway with Large Inclination[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 102-108
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY