Influence of Construction Sequence and Different Types of Pipes on Ground Surface Settlement Caused by the Construction of Two-layer Jacking-pipes
(1 Guangzhou Municipal Engineering Group Co., Ltd., Guangzhou 510060; 2 Municipal Engineering Technology Research Institute,Guangzhou Municipal Engineering Group Co. Ltd., Guangzhou 510060)
Download: PDF (4041KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Aiming at the ground surface settlement caused by two-layer jacking-pipes construction and its influen? tial factors, a three-dimensional model was established by finite element software to simulate and calculate pipejacking construction under considering interaction of bulkhead pressure, ground loss and grouting, to discuss the impact of construction sequence and pipe type on ground surface settlement. The results show that the maximum settlement caused by two-layer jacking-pipes construction occurs on the upper side of the lower jacking pipe and it reduces by 17.84% with the excavation of upper jacking-pipe, and the heaving at lower side barely changes; the main affected area of ground surface settlement is within the scope of - 3.2D1~3.2D1 around the jacking-pipe axis; the maximum ground surface settlement caused by the antecedent construction of the lower jacking-pipe occupies 78.05% of the total settlement; subsequent excavation of the upper jacking-pipe results in obvious heaving in front of it, the total settlement decreases and ground surface settlement increases after passing of jacking-pipe head, the maximum settlement increases by 21.95%, the increasing and attenuation rates of ground heaving both reduce with the advance of jacking-pipe; the ground surface settlement caused by the precedent construction of the upper-layer jacking-pipe increases largely by 20.5% compared with that of precedent construction of the lower-layer jackingpipe; the ground surface settlement caused by concrete jacking-pipe is larger than that of steel jacking-pipe, the maximum settlement increases by 26.13% and the affected scope increases to -4.8D1~4.8D1.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
AN Guanfeng1
2 WANG Tan1
2 SI Haifeng1
2 LIU Tianjun1
2
KeywordsPipe jacking construction;Two-layer jacking-pipes;Ground surface settlement;Construction se? quence   Pipe type   Numerical analysis     
Abstract: Aiming at the ground surface settlement caused by two-layer jacking-pipes construction and its influen? tial factors, a three-dimensional model was established by finite element software to simulate and calculate pipejacking construction under considering interaction of bulkhead pressure, ground loss and grouting, to discuss the impact of construction sequence and pipe type on ground surface settlement. The results show that the maximum settlement caused by two-layer jacking-pipes construction occurs on the upper side of the lower jacking pipe and it reduces by 17.84% with the excavation of upper jacking-pipe, and the heaving at lower side barely changes; the main affected area of ground surface settlement is within the scope of - 3.2D1~3.2D1 around the jacking-pipe axis; the maximum ground surface settlement caused by the antecedent construction of the lower jacking-pipe occupies 78.05% of the total settlement; subsequent excavation of the upper jacking-pipe results in obvious heaving in front of it, the total settlement decreases and ground surface settlement increases after passing of jacking-pipe head, the maximum settlement increases by 21.95%, the increasing and attenuation rates of ground heaving both reduce with the advance of jacking-pipe; the ground surface settlement caused by the precedent construction of the upper-layer jacking-pipe increases largely by 20.5% compared with that of precedent construction of the lower-layer jackingpipe; the ground surface settlement caused by concrete jacking-pipe is larger than that of steel jacking-pipe, the maximum settlement increases by 26.13% and the affected scope increases to -4.8D1~4.8D1.
KeywordsPipe jacking construction;Two-layer jacking-pipes;Ground surface settlement;Construction se? quence,   Pipe type,   Numerical analysis     
Cite this article:   
AN Guanfeng1, 2 WANG Tan1, 2 SI Haifeng1 etc .Influence of Construction Sequence and Different Types of Pipes on Ground Surface Settlement Caused by the Construction of Two-layer Jacking-pipes[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(4): 119-126
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I4/119
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY