Some Issues during TBM Trial Advance of Super-long Tunnel Group and Development Direction of Construction Technology
(1 Xinjiang Erqis River Basin Development and Construction Administration Bureau, Urumqi 830000;2 School of Civil Engineering,Beijing Jiaotong University, Beijing 100044)
Download: PDF (5208KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The total length of the water transfer project phase Ⅱ is 540 km in the northern area of Xinjiang Uygur Autonomous Region of China, of which the total length of tunnels is about 516 km. The tunnel boring machine (TBM) and drilling & blasting method were adopted for the tunnel construction, the main tunnels include 18 TBM tunnelling sections and 3 shield tunnelling sections, and the branch tunnels include 2 TBM tunnelling sections. The tunnelling length of single TBM is more than 15 km, and the maximum tunnelling distance is up to 26 km. It poses unprecedented challenges on the tunnel design and construction technique due to the group driving, adverse geology and extreme hard rock, long tunnelling distance by TBM and other construction risks and difficulties. Based on the summary and analysis of the TBM performance in the trial tunnelling, several aspects on the development directions of TBM construction of super-long tunnels were put forward to improve the technical level of safe and efficient TBM tunnelling. Namely, real-time advance geological prediction technique for rapid TBM excavation should be studied;developing of the TBM equipment with better geologic adaptability should be conducted; the intelligent TBM tunnelling technique should be studied; the real-time monitoring technique for TBM equipment state should be studied;the surrounding rock classification and corresponding supporting system should be studied; the auxiliary rock breaking technique should be developed; the one-end high-pressure ventilation technique for the super-long tunnel should be studied; the belt conveyor transportation technique should be developed for the super-long tunnel. By improving performance of TBM equipment and optimizing tunnel design and construction method, the adaptability of TBM equipment to various geological conditions is increased and safe and efficient TBM tunnelling for super-long tunnels is realized.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
DENG Mingjiang1 TAN Zhongsheng2
KeywordsSuper-long tunnel   TBM advance   Real-time geological prediction   Intelligent driving   Rock mass clas? sification for the TBM tunnel   Auxiliary rock breaking   High-pressure ventilation     
Abstract: The total length of the water transfer project phase Ⅱ is 540 km in the northern area of Xinjiang Uygur Autonomous Region of China, of which the total length of tunnels is about 516 km. The tunnel boring machine (TBM) and drilling & blasting method were adopted for the tunnel construction, the main tunnels include 18 TBM tunnelling sections and 3 shield tunnelling sections, and the branch tunnels include 2 TBM tunnelling sections. The tunnelling length of single TBM is more than 15 km, and the maximum tunnelling distance is up to 26 km. It poses unprecedented challenges on the tunnel design and construction technique due to the group driving, adverse geology and extreme hard rock, long tunnelling distance by TBM and other construction risks and difficulties. Based on the summary and analysis of the TBM performance in the trial tunnelling, several aspects on the development directions of TBM construction of super-long tunnels were put forward to improve the technical level of safe and efficient TBM tunnelling. Namely, real-time advance geological prediction technique for rapid TBM excavation should be studied;developing of the TBM equipment with better geologic adaptability should be conducted; the intelligent TBM tunnelling technique should be studied; the real-time monitoring technique for TBM equipment state should be studied;the surrounding rock classification and corresponding supporting system should be studied; the auxiliary rock breaking technique should be developed; the one-end high-pressure ventilation technique for the super-long tunnel should be studied; the belt conveyor transportation technique should be developed for the super-long tunnel. By improving performance of TBM equipment and optimizing tunnel design and construction method, the adaptability of TBM equipment to various geological conditions is increased and safe and efficient TBM tunnelling for super-long tunnels is realized.
KeywordsSuper-long tunnel,   TBM advance,   Real-time geological prediction,   Intelligent driving,   Rock mass clas? sification for the TBM tunnel,   Auxiliary rock breaking,   High-pressure ventilation     
Cite this article:   
DENG Mingjiang1 TAN Zhongsheng2 .Some Issues during TBM Trial Advance of Super-long Tunnel Group and Development Direction of Construction Technology[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(5): 1-12
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I5/1
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY