Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (6) :27-35    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Effect of Backfilling Grouting Thickness on Anti-floating of the Shield Tunnel
(1 Hangzhou Metro Group Co., Ltd., Hangzhou 310017; 2 PowerChina Huadong Engineering Corporation Limited, Hangzhou 311122;3 Zhejiang Engineering Research Center of Smart Rail Transportation, Hangzhou 311225; 4 College of Civil and Transportation Engineering, Hohai Unversity, Nanjing 210098)
Download: PDF (4960KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Sand liquefaction will occur and result in tunnel uplift and even damage under the effect of earthquake when the shield tunnel passes through sandy soil stratum. The dynamic response of the surrounding liquefied strata before and after backfill grouting of the shield tunnel is studied by shaking table model test and numerical simulation, and it shows the main damage pattern of the shield tunnel is liquefaction induced uplift. Backfill grouting can ′t significantly alleviate the liquefaction tendency of subsoil, but the uplifting displacement of the tunnel model can be remarkably reduced if peak acceleration keeps unchanged. The numerical simulation and test results show that the sand liquefaction firstly occurs at the surface and shallow soil layer, and the sand liquefaction degree gradually decreases with the increase of depth, that is to say increase of tunnel buried depth is conducive to reducing liquefaction degree. Integrity is formed by backfilling grouts and tunnel structure and this increases the overlying effective pressure indirectly and can offset the uplift induced by foundation liquefaction. For the shield tunnel with a diameter larger than 6.2 m, obvious anti-uplift effect will be obtained if the grout penetration radius is larger than 1.0 m in condition of grouting reinforcement.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Qiang1 GAN Penglu2
3 ZHONG Xiaochun4
KeywordsShield tunnel   Sand liquefaction   Tunnel uplift   Backfill grouting   Model test   Numerical model     
Abstract: Sand liquefaction will occur and result in tunnel uplift and even damage under the effect of earthquake when the shield tunnel passes through sandy soil stratum. The dynamic response of the surrounding liquefied strata before and after backfill grouting of the shield tunnel is studied by shaking table model test and numerical simulation, and it shows the main damage pattern of the shield tunnel is liquefaction induced uplift. Backfill grouting can ′t significantly alleviate the liquefaction tendency of subsoil, but the uplifting displacement of the tunnel model can be remarkably reduced if peak acceleration keeps unchanged. The numerical simulation and test results show that the sand liquefaction firstly occurs at the surface and shallow soil layer, and the sand liquefaction degree gradually decreases with the increase of depth, that is to say increase of tunnel buried depth is conducive to reducing liquefaction degree. Integrity is formed by backfilling grouts and tunnel structure and this increases the overlying effective pressure indirectly and can offset the uplift induced by foundation liquefaction. For the shield tunnel with a diameter larger than 6.2 m, obvious anti-uplift effect will be obtained if the grout penetration radius is larger than 1.0 m in condition of grouting reinforcement.
KeywordsShield tunnel,   Sand liquefaction,   Tunnel uplift,   Backfill grouting,   Model test,   Numerical model     
Cite this article:   
LI Qiang1 GAN Penglu2, 3 ZHONG Xiaochun4 .Study on Effect of Backfilling Grouting Thickness on Anti-floating of the Shield Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(6): 27-35
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I6/27
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY