Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (4) :187-195    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Test Study on the Reinforcement Effect of Bonding Steel to Damaged Tunnels under the Lateral Loads
 
(1. College of Civil Engineering, Tongji University, Shanghai 200092; 2. Shanghai Tongyan Civil Engineering Science & Technology Co., Ltd., Shanghai 200092; 3. Shanghai Research Center for Underground Infrastructure Safety Inspection and Maintenance Equipment Engineering Technology, Shanghai 200092; 4. Shanghai Tongji Engineering Consulting Co., Ltd., Shanghai 200092;5. Guizhou Expressway Group Co., Ltd., Guiyang 550001; 6. Zhejiang Transportation Planning and Design Institute Co., Ltd,Hangzhou 310030)
Download: PDF (4116KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Guide  
Abstract To research the reinforcement effect of bonding steel to the damaged linings of tunnels under lateral loads, a 1∶10 model test was conducted, and the modes of deformation and damage of the tunnel lining structure under lateral loads and the steel-bonded structure in different states of damage were researched. The test results showed that under lateral loads, the damage mode of the tunnel lining structure was brittle failure, and the damage development process was as follows: arch waist cracking — brittle shear failure of arch shoulder — damage to arch waist ductility and bending; damage was concentrated on the crown of the lining structure and the side wall-waist on the left and right sides, and the section stiffness was rapidly attenuated, which was the vulnerability and dangerous point of the structure; after steel was bonded for reinforcement, the stripping of bonded steel caused by the shear stress of the bonding surface at the structure waist was the major factor causing the instability of the reinforced structure; when the remaining bearing capacity proprtion was 30%, the bearing capacity of the structure reinforced by bonded steel was not increased; when the remaining bearing capacity proprtion was 48%, the bearing capacity of the reinforced structure was increased by 4.1%; when the remaining bearing capacity proprtion was 60%, the bearing capacity of the reinforced structure was increased by 10.2%. Consequently, after the damaged tunnel lining was rein? forced with bonded steel under the lateral pressure, the bearing capacity was not significantly improved and the reinforcement effect was limited, and the lining damage caused by lateral loads should not be reinforced by bonding steel.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Xuezeng1 GU Wenchuan1 YANG Zhilu2
3 GUO Qiaokun4 HE Guohua5 FENG Jin6
KeywordsHighway tunnel   Damaged lining   Bonding steel for reinforcement   Model test   Lateral load   Time of rein? forcement   Reinforcement effect     
Abstract: To research the reinforcement effect of bonding steel to the damaged linings of tunnels under lateral loads, a 1∶10 model test was conducted, and the modes of deformation and damage of the tunnel lining structure under lateral loads and the steel-bonded structure in different states of damage were researched. The test results showed that under lateral loads, the damage mode of the tunnel lining structure was brittle failure, and the damage development process was as follows: arch waist cracking — brittle shear failure of arch shoulder — damage to arch waist ductility and bending; damage was concentrated on the crown of the lining structure and the side wall-waist on the left and right sides, and the section stiffness was rapidly attenuated, which was the vulnerability and dangerous point of the structure; after steel was bonded for reinforcement, the stripping of bonded steel caused by the shear stress of the bonding surface at the structure waist was the major factor causing the instability of the reinforced structure; when the remaining bearing capacity proprtion was 30%, the bearing capacity of the structure reinforced by bonded steel was not increased; when the remaining bearing capacity proprtion was 48%, the bearing capacity of the reinforced structure was increased by 4.1%; when the remaining bearing capacity proprtion was 60%, the bearing capacity of the reinforced structure was increased by 10.2%. Consequently, after the damaged tunnel lining was rein? forced with bonded steel under the lateral pressure, the bearing capacity was not significantly improved and the reinforcement effect was limited, and the lining damage caused by lateral loads should not be reinforced by bonding steel.
KeywordsHighway tunnel,   Damaged lining,   Bonding steel for reinforcement,   Model test,   Lateral load,   Time of rein? forcement,   Reinforcement effect     
Fund: 
Cite this article:   
LIU Xuezeng1 GU Wenchuan1 YANG Zhilu2, 3 GUO Qiaokun4 HE Guohua5 FENG Jin6 .Test Study on the Reinforcement Effect of Bonding Steel to Damaged Tunnels under the Lateral Loads[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(4): 187-195
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I4/187
 
No references of article
[1] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[2] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[3] ZHONG Wulin1 HAN Xingbo1 YE Fei1 WANG Han1 CAO Xiaoyong2 XI Weizheng2.Research on Wind Resistance and Optimization Design of Steel Corrugated Plate Support for Tunnel Shafts[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 197-207
[4] LI Qiang1 HAN Xingbo2 XIE Ju1 LI Chao3 LI Xing3 MA Aihua1 BI Jiefu3 YE Fei.Tunnel Energy Supply Strategy and Practice with Grid-Connected PV-Storage Microgrid: A Case Study of the Wudingguan Tunnel Photovoltaic Power Station Project[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 60-66
[5] WANG JingYong1,2 WANG Ping2 YANG Jin2 JI Feng3.Optimization Study on the Support Structure of a Tunnel in Carbonaceous Phyllite Using Physical Model Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 160-169
[6] TANG Xie LIN Guojin1, 2 ZHANG Hang2.Adaptive Strategies for Mechanized Drill-and-Blast Construction in Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 217-228
[7] LIU Shangguo1 CI Naiquan1 LIU Rufei1 CHENG Kun2 WANG Fei1 MA Xinjiang3.Tunnel Crown Deformation Monitoring Method Based on Vehicle-mounted Laser Point Clouds[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 209-216
[8] CHEN Xiang1,2 LIN Zhi1,2 FENG Wanlin1,2 YANG Hongyun1,2.Experimental Study on Crack Propagation Characteristics and Mechanical Behavior of Plain Concrete Lining in Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 212-220
[9] GUO Ying PENG Wenqing CHEN Shiqiang ZHANG Qiong WANG Jiawei.Calculation Method and Validation of Equivalent Length for Traffic Tunnel Ventilation Model Test[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 230-240
[10] TAN Yinjun1,2 WANG Keli1,2 ZHANG Heng1,2 ZHANG Zhiqiang1,2.Influence of Natural Wind on Fire Smoke Propagation in 10 km Long Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 103-113
[11] TAO Weiming1,2 ZHU Xingyu1,3 ZHANG Zhiqiang1,3 YU Hang1,3 FAN Lei2.Experimental Study on the Catastrophic Evolution of Water and Mud Inrush in Tunnels with Karst Conduits[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 221-230
[12] ZHANG Xinyang1, 2 SHEN Yusheng1, 2 CHANG Mingyu1, 2 WANG Haokang1, 2 PAN Xiaohai1, 2 WANG Yanyan1, 2.Mix Proportion Design of Similar Materials for Tunnel Surrounding Rocks Based on GA-BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 82-91
[13] KUANG Liang1 SU Wei1 TAO Weiming1 TIAN Siming2 SHEN Yusheng3 LI Xu2 WANG Huiwu1.Study on the Impact Zoning and Fortification Range of Tunnel Structures Crossing Strike-slip Faults[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 45-54
[14] YANG Wendong1 WU Yang1 WANG Zhide1 WU Haigang1,2 LI Gen1.Experimental Study on the Influence Zoning on Existing Pile Foundations Induced by Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 200-208
[15] CHEN Jianxun1 WANG Heqi1, 2 JIA Haiyang1 LIU Weiwei1 LUO Yanbin1 ZHAO Zhiqiang1 HUANG Dengxia2.Testing and Analysis of Natural Ventilation in No. 1-2 Shaft in the Tianshan Shengli Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 219-23
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY