Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (6) :147-153    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Mechanical Properties of Prefabricated Assembly Utility Tunnel Construction and Field Full-scale Test Study in the Process of Erection of Utility Tunnels
(1. No.6 Engineering Co., Ltd., CCCC Second Highway Engineering, Xi′an 710075; 2. Engineering Design & Research Institute, CCCC Second Highway Engineering Co., Ltd., Xi′an 710065; 3. Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education, College of Transportation Engineering, Tongji University, Shanghai 200092)
Download: PDF (5167KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to solve the problem of inadequate installation accuracy of large tonnage hoisting of prefabricated assembly utility tunnel in Xiong'an New Area, a construction scheme of erecting utility tunnel segment is proposed.By establishing the finite element calculation model of the prefabricated assembly utility tunnel, the mechanical properties of the utility tunnel during the construction of erection are calculated and analyzed, and the calculation results are verified by carrying out the field full-scale model test. The results show that: (1) During the construction of erection of utility tunnels, the performance of the structural material meets the design requirements in the case of lifting under asymmetric load and in the case of lifting through a hole, the maximum tensile stress of structural concrete is less than the tensile strength of the material, and the structure is still in a safe state. (2) During the field test of erection of utility tunnels, stress and deformation results at the key positions of the utility tunnels meet the design requirements. (3) The construction scheme of erection is applicable to long section and large tonnage prefabricated assembly utility tunnels, which can ensure structural safety during construction.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SHAN Hongwei1 SUN Mao2 XIAN Jianping2 ZHU Li2 YU Haitao3
KeywordsUtility tunnel   Construction technology   Field test   Erection of utility tunnels   Mechanical properties     
Abstract: In order to solve the problem of inadequate installation accuracy of large tonnage hoisting of prefabricated assembly utility tunnel in Xiong'an New Area, a construction scheme of erecting utility tunnel segment is proposed.By establishing the finite element calculation model of the prefabricated assembly utility tunnel, the mechanical properties of the utility tunnel during the construction of erection are calculated and analyzed, and the calculation results are verified by carrying out the field full-scale model test. The results show that: (1) During the construction of erection of utility tunnels, the performance of the structural material meets the design requirements in the case of lifting under asymmetric load and in the case of lifting through a hole, the maximum tensile stress of structural concrete is less than the tensile strength of the material, and the structure is still in a safe state. (2) During the field test of erection of utility tunnels, stress and deformation results at the key positions of the utility tunnels meet the design requirements. (3) The construction scheme of erection is applicable to long section and large tonnage prefabricated assembly utility tunnels, which can ensure structural safety during construction.
KeywordsUtility tunnel,   Construction technology,   Field test,   Erection of utility tunnels,   Mechanical properties     
Cite this article:   
SHAN Hongwei1 SUN Mao2 XIAN Jianping2 ZHU Li2 YU Haitao3 .Mechanical Properties of Prefabricated Assembly Utility Tunnel Construction and Field Full-scale Test Study in the Process of Erection of Utility Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 147-153
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I6/147
 
No references of article
[1] YANG Shaoyu1 WANG Xiaotian2 ZHANG Peiyuan1 LIU Shengchen1 LI Shuchen2 LI Luoning2.A Review of Spray-applied Waterproofing Membrane Technology for Drill-and-Blast Tunnels [J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 1-14
[2] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[3] GE Zhenghui ZHENG Jianguo1 LI Xinzhi CHEN Peng3 NING Zhiwei WANG Pengcheng2.Field Measurement and Numerical Study on Deformation Behavior of Initial Supports with Different Arch Types[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 40-49
[4] XU Bowei AN Peng1 QIANG Chengcheng2 QIANG Chengcheng2 MIU Yingbing1 XU Guangyao3.Study on the Anti-seepage and Load-reduction Effects of Bearing Plates at the Top of Utility Tunnels in Collapsible Loess Sites[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 19-29
[5] QU Shan1 HUANG Xuanbo2,3 DING Wenqi2,3 ZHANG Qingzhao2,3.Study on the Bending Failure Mode and Mechanism of Corrugated Steel Lining Flange Joints[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 242-249
[6] JIA Lianhui1 YAN Yangyi1 XUE Guangji1 DONG Yanping1 GONG Tingmin1 SHEN Chao2.Design and Construction Technology of U-shaped Shield Pipe Erecting Machine for Green Prefabricated Integrated Utility Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 275-284
[7] PENG Zi1,2 WEN Meng3 CHEN Yuan4 DENG Yu5 GUO Chun1,2.Study on the Temperature Prediction Formula and Application in Urban Utility Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 74-81
[8] LIU Xiaohui1 FENG Kun1 GUO Wenqi1 LU Xuanyi1 PENG Changsheng2 LI Jiaoyang2.Study on the Influence of Construction Methods of Internal Structures on Longitudinal Mechanical Characteristics of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 151-160
[9] CHEN Meng LIANG Zhonglong YU Hang SUN Junqi ZHANG Tong.Overview on Mechanical Properties of a Tunnel Lining Reinforced by High-performance Concrete[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 61-71
[10] MA Huabing1 FENG Liangping2 WANG Hengdong3 XIAN Jianping4 SHANG Dongfan5 CUI Guangyao6.Study on Field Test of Joint Waterproofing of Long-segment Heavy-tonnage Prefabricated Assembled Utility Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 208-215
[11] GUO Caixia1,2 LIU Wenjie2 ZHANG Mingju2 LI Pengfei 2 GAO Yunhao2 SHAN Yuhan2.Experimental Study on Mechanical Properties of High-Foot-Bolt &Mould-Package Concrete Fixed Support Ends for Steel Support in Foundation Pit Works[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(5): 277-
[12] HU Zhenyu1 FENG Kun1 GUO Wenqi1 PENG Changsheng2 LI Jiaoyang2.Study on the Impact of Different Construction Timings of Internal Structure on the Stress of Segmental Lining of the Shield Tunnel with an Super-large Section[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 90-101
[13] ZHU Li1 XIAN Jianping1 YUAN Yong2 WANG Hengdong3 MA Huabing4.Study on the Test of Seismic Performance of Prefabricated Utility Tunnel with a Large Section[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 140-146
[14] YANG Zhong1 MA Huabing2 YU Haitao3 XU Hailiang4 YUE Qing5.Field Test Study on the Compaction Effect of Waterstops for Long-section and Large-tonnage Urban Utility Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 154-161
[15] MA Huabing1 SHAN Hongwei1 GUO Yawei2 FU Baiyong2 SHANGGUAN Shiqing3.Study on Full-scale Test for Bottom Contact Status of Prefabricated Utility Tunnel Based on Impact Imaging Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 162-169
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY