Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (1) :186-194    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Full-scale Experimental Study on Mechanical and Deformation Properties of Initial Support Structure of Horseshoe Tunnel
(China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016)
Download: PDF (5767KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In view of the initial support structure of the horseshoe tunnel, the bearing capacity and deformation per? formance of the steel arch and shotcrete initial support structure are analyzed by using full-scale tests and monitoring the internal force, structural surface strain and deformation of the structure by embedding sensors. The results show that: (1) In the elastic phase, the bending moment and axial force on each section of the support structure are symmetrical about the neutral axis of the structure, and the corresponding radial displacement amplitude is small.(2) In the plastic phase, with the increase of the applied load, the bending moment and axial force of the support structure increase rapidly. The support structure presents a deformation state of "convex arch bottom and concave arch waist", and is approximately symmetrical about the neutral axis. (3) The support structure finally failed at the right arch shoulder section steel connection. The concrete and section steel at the failure location were in a large range of peeling state, and the exposed section steel bulge was bent and damaged. The ultimate bearing capacity of the structure was about 1.32 times of the design load.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Yawei ZHAO Xiuwang ZHU Yi GUO Jianglong
KeywordsHorseshoe tunnel   Initial support   Shotcrete   Full-scale test   Bearing capacity   Deformation performance     
Abstract: In view of the initial support structure of the horseshoe tunnel, the bearing capacity and deformation per? formance of the steel arch and shotcrete initial support structure are analyzed by using full-scale tests and monitoring the internal force, structural surface strain and deformation of the structure by embedding sensors. The results show that: (1) In the elastic phase, the bending moment and axial force on each section of the support structure are symmetrical about the neutral axis of the structure, and the corresponding radial displacement amplitude is small.(2) In the plastic phase, with the increase of the applied load, the bending moment and axial force of the support structure increase rapidly. The support structure presents a deformation state of "convex arch bottom and concave arch waist", and is approximately symmetrical about the neutral axis. (3) The support structure finally failed at the right arch shoulder section steel connection. The concrete and section steel at the failure location were in a large range of peeling state, and the exposed section steel bulge was bent and damaged. The ultimate bearing capacity of the structure was about 1.32 times of the design load.
KeywordsHorseshoe tunnel,   Initial support,   Shotcrete,   Full-scale test,   Bearing capacity,   Deformation performance     
Cite this article:   
WANG Yawei ZHAO Xiuwang ZHU Yi GUO Jianglong .Full-scale Experimental Study on Mechanical and Deformation Properties of Initial Support Structure of Horseshoe Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 186-194
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/186
 
No references of article
[1] CHENG Gaojun1 HE Lidong2 WANG Kui.Performance Analysis of Steel-concrete Composite Structures with Double-row Shear Studs under Large Eccentric Compression[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 30-39
[2] LI Pengfei ZHANG Jialong ZHANG Mingju CUI Xiaopu HUANG Zhengdong MA Rui.Experimental Study on the Mechanical Performance of Steel Corrugated Plate-fabricform Concrete Support Joints in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 170-181
[3] QU Shan1 HUANG Xuanbo2,3 DING Wenqi2,3 ZHANG Qingzhao2,3.Study on the Bending Failure Mode and Mechanism of Corrugated Steel Lining Flange Joints[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 242-249
[4] YU Li1,2 QIN Youlin1,2 CHEN Lanxin1,2 XIAO Yang1,2 CHEN Chaohui1,2 WANG Songshen1,2 LIANG Zhifu3.Experimental Study on the Macroscopic Mechanical Properties of Steel Fiber Reinforced Shotcrete in High-temperature Hydrothermal Environments[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 231-241
[5] LU Junfu1 LI Ming1 ZHAO Wanqiang2 CHEN Long3.Study on the Influence of Stirrups Confinement Range on Axial Compressive Behavior of Tunnel Steel-reinforced Concrete Structures[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 250-258
[6] WEI Gang1,2 XU Tianbao3 FENG Feifan4 MU Zhiyuan3 ZHANG Zhiguo5.Study on the Deterioration Mechanism of Subway Shield Tunnel Structure Based on the Full-scale Test[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 182-190
[7] CHEN Xiangsheng1,2,3 CHEN Weijie2 LI Rongkang2 GU Wentian1 LU Yuan1 LI Qiang2,3 SU Dong2,3.Design and Application of a Prefabricated Loading Platform for Full-scale Shield Tunnel Test[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 1-9
[8] CHEN Zhimin1 WANG Hong1 GONG Jun2 LI Zengyin2 PENG Yi1.On Surrounding Rock Deformation Characteristics in a High Geostress Soft Rock Tunnel with Double-layer Initial Support[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 85-95
[9] TONG Yueping1 TIAN Chongming1 YE Fei1 JIANG Yin1 ZHANG Junyuan1 WU Bowen1WANG Han1 LI Wenhui2.Study on Seepage Crystallization Pattern of Tunnel Shotcrete of Different Ages[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 272-282
[10] GUO Yingjie1,2 DING Wenqi1,2 LI Xiaoran1,2 MA Chang1,2 ZHANG Qingzhao1,2.Experimental and Numerical Study on Flexural Mechanical Properties of New Stainless Steel Corrugated Plate[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(5): 262-268
[11] YAO Zhixiong1,2,3 LIU Mengfei1 WU Bo4 LIU Yaoxing1 CHEN Ximao5 ZHENG Guowen5 LUO Zhiyi1.Study on Stability and Initial Support Optimization of Multi-tunnel Based on Bearing Characteristics[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 119-129
[12] MA Huabing1 SHAN Hongwei1 GUO Yawei2 FU Baiyong2 SHANGGUAN Shiqing3.Study on Full-scale Test for Bottom Contact Status of Prefabricated Utility Tunnel Based on Impact Imaging Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 162-169
[13] LIU Zhe1,2 JIANG Yanhong3 YANG Yang4.Standard for Design of Early High-strength Shotcrete for Railway Tunnels and Application Research[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 232-238
[14] BI Xiangli1 WANG Xiuzhi1 ZHANG Zhongjie2 PAN Weiqiang3 JIAO Bochang4 LIU Xian4.Full-scale Experimental Study on Mechanical Behavior of the Bundled Integrate Structure under the Unloading Condition of the Side[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 163-169
[15] WEI Gang1,2 ZHOU Xinxin3 LIU Yayu4 HUANG Shiyu3,5 FENG Feifan3.Development and Application of Test Loading System of Multi-ring Shield Segment Prototype[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 176-186
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY