A Study on Optimization of Reinforcement Scheme for Adjacent Construction of Super-large Rectangular Pipe Jacking Shield Tunnel in Soft Ground
(1. School of Civil Engineering, North China University of Technology, Beijing 100144; 2. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044; 3. China Railway Fourth Survey and Design Institute Group Co., Ltd., Wuhan 430064;4. Haixia (Fujian) Transportation Engineering Design Co., Ltd., Fuzhou 350004)
Download: PDF (4346KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to ensure the safety of the adjacent construction of the super-large rectangular pipe jacking shield tunnel in the soft ground, taking a rectangular pipe jacking shield tunnel adjacently passing under the existing high-speed railway as a study case, the effects of different construction and reinforcement schemes of the superlarge rectangular pipe jacking shield tunnel adjacent to the high-speed railway section are studied. The results show that when advanced grouting is adopted, the active instability displacement can be reduced by 25.64%, the passive instability displacement can be reduced by 17.65%, and the track settlement can be reduced by 30.38% for the excavation face. And when the manually excavated pile + D-shaped steel auxiliary beam are adopted, the active instability displacement can be reduced by 51.28%, the passive instability displacement can be reduced by 29.41%, and the track settlement can be reduced by 42.31% for the excavation face. Field monitoring shows that the maximum settlement of the track after reinforcement by the manually excavated pile + D-shaped steel auxiliary beam is only 1.65 mm. The super-large rectangular pipe jacking shield tunnel has successfully passed under the existing highspeed railway. The manually excavated pile + D-shaped steel auxiliary beam ensure the adjacent construction safety of the super-large rectangular pipe jacking shield tunnel and the normal operation of the high-speed railway.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CUI Guangyao1 MA Jianfei2 NING Maoquan3
4 TANG Zaixing3
4 LIU Shunshui3
4 TIAN Yuhang1
KeywordsTunnel engineering   Soft ground   Rectangular pipe jacking shield   Adjacent construction   Reinforce? ment scheme     
Abstract: In order to ensure the safety of the adjacent construction of the super-large rectangular pipe jacking shield tunnel in the soft ground, taking a rectangular pipe jacking shield tunnel adjacently passing under the existing high-speed railway as a study case, the effects of different construction and reinforcement schemes of the superlarge rectangular pipe jacking shield tunnel adjacent to the high-speed railway section are studied. The results show that when advanced grouting is adopted, the active instability displacement can be reduced by 25.64%, the passive instability displacement can be reduced by 17.65%, and the track settlement can be reduced by 30.38% for the excavation face. And when the manually excavated pile + D-shaped steel auxiliary beam are adopted, the active instability displacement can be reduced by 51.28%, the passive instability displacement can be reduced by 29.41%, and the track settlement can be reduced by 42.31% for the excavation face. Field monitoring shows that the maximum settlement of the track after reinforcement by the manually excavated pile + D-shaped steel auxiliary beam is only 1.65 mm. The super-large rectangular pipe jacking shield tunnel has successfully passed under the existing highspeed railway. The manually excavated pile + D-shaped steel auxiliary beam ensure the adjacent construction safety of the super-large rectangular pipe jacking shield tunnel and the normal operation of the high-speed railway.
KeywordsTunnel engineering,   Soft ground,   Rectangular pipe jacking shield,   Adjacent construction,   Reinforce? ment scheme     
Cite this article:   
CUI Guangyao1 MA Jianfei2 NING Maoquan3, 4 TANG Zaixing3, 4 LIU Shunshui3 etc .A Study on Optimization of Reinforcement Scheme for Adjacent Construction of Super-large Rectangular Pipe Jacking Shield Tunnel in Soft Ground[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(2): 178-184
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I2/178
 
No references of article
[1] WANG Sheng1,2,3,4 WEI Qin1,2 LI Liping3.Catastrophic Mechanisms and Research Development Trends of Water and Mud Inrushes in Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 15-25
[2] ZOU Yulin1, 2 LIU Jing1 WANG Bo2 CHENG Ziquan2 XIE Zuodong2 GU Hao3 WANG Kaiyue.Study on the Causes and Prevention Measures of Water and Mud Inrush Disasters in Sichuan Yanjiang Expressway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 259-269
[3] QIN Tiange 1, 2 WU Li CHEN Qian1 XIA Zhen1 LIU Shiya1, 2 CAI Xin1.Research Status and Development Trends of Intelligent Construction System for Drill and Blast Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 1-10
[4] WANG JingYong1,2 WANG Ping2 YANG Jin2 JI Feng3.Optimization Study on the Support Structure of a Tunnel in Carbonaceous Phyllite Using Physical Model Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 160-169
[5] WANG Shuaishuai FU Yifan2,3 XU Yong1 SHI Jingfeng1 GUO Chun2,3.Parametric Study on Air Chamber Ventilation in Tunnelling Using Relay Fans for Airflow Distribution[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 240-248
[6] ZHANG Meining1,2 SONG Zhanping1,2,3 YUE Bo4 LI Xu1,2,3 ZHAO Yirui2 TAO Lei5.Research on Construction and Application of a Rapid Tunnel Surrounding Rock Classification Model Based on Real-time Images and Advanced Geological Information[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 87-97
[7] WANG Haokang1,2 SHEN Yusheng1,2 PAN Xiaohai1,2 CHANG Mingyu1,2 ZHANG Xinyang1,2 SU Wei3.Experimental Study on Dynamic Characteristics of Tunnels Crossing Multi-fault Fracture Zones in Strong Earthquake Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 212-220
[8] YANG Cunbin1,2 REN Yang,1,2 WU Yuehua1,2 HE Wanchao1,2 LI Tianbin1,2.Dynamic Intelligent Prediction of Tunnel Surrounding Rock Geological Information Based on M-LSTM Method[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 74-82
[9] WANG Lichuan1,2 GE Lihui3 WANG Haiyan2 KONG Chao4 LI Qingbin1 WANG Yuntao3 LIU Yufei1.Construction Methods of Longitudinal Synchronous Grouting for Tunnel Crown Secondary Lining Voids[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 269-277
[10] ZHANG Chengyou1 WANG Bo1 DU Zehao1 GAO Junhan1 TAN Lihao2.Analysis of the Suitability of Different Anchor Bolt Support Systems for Rockburst Mitigation and Optimization of Anchor Bolt Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 64-73
[11] ZHANG Xinyang1, 2 SHEN Yusheng1, 2 CHANG Mingyu1, 2 WANG Haokang1, 2 PAN Xiaohai1, 2 WANG Yanyan1, 2.Mix Proportion Design of Similar Materials for Tunnel Surrounding Rocks Based on GA-BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 82-91
[12] HUI Qiang1 GAO Feng1,2 TAN Xukai1 YOU Dongmei1.Study on Structural Damage Characteristics of Tunnels Crossing Active Faults Based on Layered Dislocation Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 35-44
[13] XU Xiaojing1,2 SONG Zhanping1,2,3 TIAN Xiaoxu1,2 DING Libo? SUN Yinhao? ZHAO Junbo1,2.Analysis of the Support Effect of Micro Steel Pipe Pile-Anchor Bolt at Tunnel Portal Slope Based on the Incremental Method[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 118-128
[14] CHEN Zhimin WANG Hong CHEN Jun ZHAI Wenhao WANG Duobin LI Wenhao CAI Yunchen.Study on Gradation Characteristics and Arching Effect of Talus in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 172-181
[15] ZHANG Xiao1, 2 WANG Mingnian1, 2 YU Li1, 2 WANG Zhilong1, 4 LIU Dagang1, 3 MA Zhizhong5.Theoretical Calculation Model for Stability of Tunnel Excavation Face with Pre-grouting Reinforcement[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 42-51
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY