Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (1) :114-124    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Cutting Performance of New Wedge-flat Combined TBM Cutters in Extreme Hard Rocks
(1. School of Construction Machinery, Chang'an University, Xi'an 710064; 2. China Communications Construction Central South Engineering Bureau Co., Ltd., Changsha 410116; 3. School of Highway, Chang'an University, Xi'an 710064)
Download: PDF (6607KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In response to the characteristic that flat type cutters of full-face rock tunnel boring machines (TBMs) have low rock-breaking efficiency but are wear-resistant in extreme hard rocks, and wedge type cutters have high rock-breaking efficiency but are prone to wear, a new wedge-flat combined cutter was proposed and the influence of cutting ring structure on rock breaking and wear were explored. Firstly, uniaxial compression, Brazilian splitting,and small-scale linear cutting tests and simulations were conducted on extremely hard diorite (exceeding 230 MPa)collected from a tunnel project to verify the accuracy of the numerical methods. Then, considering the influences of the width ratio of wedge ring segment to flat ring segment and the number of wedge or flat ring segments, full-scale numerical simulations for linear rock breaking were performed in sequence to study the change rules of rock-breaking normal force, rolling force, specific energy, and specific wear work. Research results indicate that the rock breaking load of the wedge-flat combined rings exhibited a clear multi-stage fluctuation pattern, and the load of the flat ring segment was significantly greater than that of the wedge ring segment; The ratio of wedge ring width to flat ring width had a significant impact on rock-breaking load, efficiency, and cutter ring wear, while the effect of the number of wedge or flat ring segments was not significant; It is recommended to set the width ratio of the wedge ring segment to flat ring segment to 0.5 to balance efficient rock breaking and wear resistance, and set the number of wedge or flat segments to 4 or 6.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
GENG Qi1 HUANG Dengxia2 CHEN Jianxun3 LIU Weiwei3 LUO Yanbin3 MA Maoxun1 LI Xiaobin1
KeywordsFull-face rock tunnel boring machine   Wedge-flat combined cutter   Rock breaking by cutters    Cutter wear   Finite element method     
Abstract: In response to the characteristic that flat type cutters of full-face rock tunnel boring machines (TBMs) have low rock-breaking efficiency but are wear-resistant in extreme hard rocks, and wedge type cutters have high rock-breaking efficiency but are prone to wear, a new wedge-flat combined cutter was proposed and the influence of cutting ring structure on rock breaking and wear were explored. Firstly, uniaxial compression, Brazilian splitting,and small-scale linear cutting tests and simulations were conducted on extremely hard diorite (exceeding 230 MPa)collected from a tunnel project to verify the accuracy of the numerical methods. Then, considering the influences of the width ratio of wedge ring segment to flat ring segment and the number of wedge or flat ring segments, full-scale numerical simulations for linear rock breaking were performed in sequence to study the change rules of rock-breaking normal force, rolling force, specific energy, and specific wear work. Research results indicate that the rock breaking load of the wedge-flat combined rings exhibited a clear multi-stage fluctuation pattern, and the load of the flat ring segment was significantly greater than that of the wedge ring segment; The ratio of wedge ring width to flat ring width had a significant impact on rock-breaking load, efficiency, and cutter ring wear, while the effect of the number of wedge or flat ring segments was not significant; It is recommended to set the width ratio of the wedge ring segment to flat ring segment to 0.5 to balance efficient rock breaking and wear resistance, and set the number of wedge or flat segments to 4 or 6.
KeywordsFull-face rock tunnel boring machine,   Wedge-flat combined cutter,   Rock breaking by cutters ,   Cutter wear,   Finite element method     
Cite this article:   
GENG Qi1 HUANG Dengxia2 CHEN Jianxun3 LIU Weiwei3 LUO Yanbin3 MA Maoxun1 LI Xiaobin1 .Study on Cutting Performance of New Wedge-flat Combined TBM Cutters in Extreme Hard Rocks[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(1): 114-124
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I1/114
 
No references of article
[1] LIU Shaoqiang1 XU Jianshu2 YANG Xiu2 TANG Qisheng1 XIE Xingfei1 GONG Qiuming1 ZHOU Xiaoxiong3.TBM Cutter Edge Tip Wear Phenomenon and Wear Evolution Characteristics[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 20-27
[2] LI Zhanfu1 ZHANG Yu2 WANG Jun1 LV Yanyun2,3 RUI Yi2,3,4.Calculation of Horizontal Convergence Safety Factor for Tunnels in Spatially Variable Soil Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 88-98
[3] YANG Yinwei1 WANG Baoyou1 WANG Lichuan1,2 WANG Zhengzheng3 GENG Qi4 ZHANG Huijian2 JI Guodong1.Technical and Economic Comparative Study of TBM Belt Conveyor Mucking[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 119-125
[4] CHEN Youjian.Visualization Simulation and Early Warning System for Shield Tunnelling Based on Digital Geological Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 166-174
[5] WANG Guan.Study on Action Mechanism of Double-layer Support for the Parallel Adit of Tunnels in Extremely-squeezed Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 138-146
[6] ZHENG Shuang1,2 LIU Chao3 ZHU Delin3 LIU Hai3 JIA Xinjuan1.A Study on Disturbance Pattern of Asymmetric Synchronous Grouting on Ground during Large Diameter Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 168-177
[7] GENG Qi1 ZHANG Xingyu1 HE Fei2 QI Zhichong2 WANG Xuebin1 YE Min1 ZHANG Daqing3.A Numerical Simulation Study on the Mucking Mechanism of TBM Two-stage Spiral Cutterhead[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 84-93
[8] SANG Conghui1,2 QIAO Liwei1,2 WANG Lieni3 YUAN Wenchao4 ZHAO Yanfa5.High-precision Discrete Simulation Method of Floating Dusts Based on Two-stage Solution and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 203-211
[9] CHEN Fujiang1 DUAN Rongqian1 ZHANG Xin2 LIU Jingang3 SUN Cangqian1 LI Xiqian1.Analysis on Vibration Influence of the Construction of Short-distance Pile Foundation on Existing Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 140-148
[10] ZHANG Tingrui.Research on Thermal Properties and Mechanical Behaviors of Large Shield Tunnel in Fire[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 202-211
[11] IU Kai1 WU Zaixin2 YANG Jizhong3 GUAN Haoyu4,5.Study of Dynamic Response and Fatigue Damage of High-speed Railway Tunnels under the Impact Load of Aircraft Landing[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 96-102
[12] HE Jian1 PENG Yuekai1 LIANG Xiao2,3 QI Taiyue2,3.Study on the Law of Separation Defects of Monolithic Track Bed in Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 232-240
[13] XIAO Zunqun1,2,3 CAO Tongtong1 XU Caiyun1 YANG Kai2 DONG Qiongying1 JIANG Yinan1.Superposition Principle Based Numerical Estimation Method of Jacking Force of Vertical Curved Jacking Pipes with Large Rectangular Section[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 68-76
[14] LIU Xialin ZHANG Jun CHEN Biguang LIU Shangge SHU Heng.Study on Pre-reinforcement Schemes for a Shield Tunnel Passing under the Pile Foundation of an Urban Viaduct[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 218-224
[15] CHEN Jing1 YAN Shuwang2 ZHONG Xiaokai3.Finite Element Study on Working Mechanism of Plugging Airbags in Tunnels under External Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 135-144
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY