Engineering Measures and Safety Evaluation of Baizhang Tunnel Passing through Flow Plastic Water-rich Fracture Zone
(1 Sichuan Highway Planning Survey, Design and Research Institute Ltd., Chengdu 610041; 2 Southwest Jiaotong University,MOE Key Laboratory of Transportation Tunnel Engineering, Chengdu 610031)
Download: PDF (2777KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Collapse and clearance invasion events occurred repeatedly during the construction at the section of ZK152+433-ZK152+463 of left tube of Baizhang tunnel passing through a flow-plastic fracture zone with abundant water, which brought unprecedented challenges to the engineers. The various measures adopted in the construction are described in detail, and an analysis on structure safety is conducted by numerical method. The results show that:(1) as for the flow-plastic water-rich fracture zone, dense advance support is the most effective measure to prevent large deformation or collapse of surrounding rocks during excavation, a ring of ?51 self-drilling anchor bolts with unit length of 3.5 m are installed between steel arches (with the steel arch interval of 50 cm), that is to say there are 7 layers of advance support for each tunnel section, effectively controlling the rock mass deformation after excavation, avoiding collapse and clearance invasion of tunnel lining; (2) it is significant to reinforce the surrounding rocks,especially at sidewall and tunnel floor, since it can effectively decrease the integral subsidence of tunnel lining during construction. A combination of jackstone treatment and grouting is adopted to reinforce the surrounding rocks at sidewall and tunnel floor and the effect is much better than that only with grouting; (3) as for the tunnel with explicit external load, the parameters of lining support should be determined by both calculation analysis and engineering experience, which will guarantee the safety of tunnel structure and also make it economical and reasonable; (4) as for the two-lane tunnel, three-bench method is taken and the bench length should be shortened as much as possible in order to form an enclosure of primary support in time so as to control the deformation of surrounding rocks better.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
TIAN Zhiyu1 TIAN Shangzhi1 YANG Feng1 ZHANG Zhaojie1 WANG Bo2
KeywordsTunnel   Flow-plastic water-rich fracture zone   Clearance invasion   Collapse   Treatment measure   Nu? merical analysis   Experience summarization     
Abstract: Collapse and clearance invasion events occurred repeatedly during the construction at the section of ZK152+433-ZK152+463 of left tube of Baizhang tunnel passing through a flow-plastic fracture zone with abundant water, which brought unprecedented challenges to the engineers. The various measures adopted in the construction are described in detail, and an analysis on structure safety is conducted by numerical method. The results show that:(1) as for the flow-plastic water-rich fracture zone, dense advance support is the most effective measure to prevent large deformation or collapse of surrounding rocks during excavation, a ring of ?51 self-drilling anchor bolts with unit length of 3.5 m are installed between steel arches (with the steel arch interval of 50 cm), that is to say there are 7 layers of advance support for each tunnel section, effectively controlling the rock mass deformation after excavation, avoiding collapse and clearance invasion of tunnel lining; (2) it is significant to reinforce the surrounding rocks,especially at sidewall and tunnel floor, since it can effectively decrease the integral subsidence of tunnel lining during construction. A combination of jackstone treatment and grouting is adopted to reinforce the surrounding rocks at sidewall and tunnel floor and the effect is much better than that only with grouting; (3) as for the tunnel with explicit external load, the parameters of lining support should be determined by both calculation analysis and engineering experience, which will guarantee the safety of tunnel structure and also make it economical and reasonable; (4) as for the two-lane tunnel, three-bench method is taken and the bench length should be shortened as much as possible in order to form an enclosure of primary support in time so as to control the deformation of surrounding rocks better.
KeywordsTunnel,   Flow-plastic water-rich fracture zone,   Clearance invasion,   Collapse,   Treatment measure,   Nu? merical analysis,   Experience summarization     
Cite this article:   
TIAN Zhiyu1 TIAN Shangzhi1 YANG Feng1 ZHANG Zhaojie1 WANG Bo2 .Engineering Measures and Safety Evaluation of Baizhang Tunnel Passing through Flow Plastic Water-rich Fracture Zone[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(2): 176-183
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I2/176
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY