Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (6) :77-85    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Seismic Resistance of Column-free Atrium Style Subway Station Based on the Integral Response Displacement Method
(Southwest Survey and Design Co., Ltd., China Railway Siyuan Survey and Design Group Co., Ltd., Kunming 650200)
Download: PDF (5470KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract As a new station structure, the column-free atrium style subway station deletes central columns and set up openings in the middle plate to expand the effective space and increase the efficiency of transfer. To understand the response characteristics of the column-free atrium style subway station with the action of an earthquake, the integral response displacement method suitable for the underground structure with a complex face was used for quasistatic seismic analysis, and the distribution of internal force is compared among large-span column-free atrium style subway stations, general column subway stations and column-free subway stations, all of which have the same face shape. The results show that if the face shape is identical, the axial face, shearing force and bending moment of a large-span column-free atrium style subway station are higher than those of a column-free station and a general column station; the weak position of a column-free atrium style subway station is the connection between the bottom plate and the side walls, and the connection between the middle plate and the side walls is more disadvantageous than traditional subway stations.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
XU Yonghao
KeywordsSubway   Integral response displacement method   Column-free atrium style subway station   Seismic analysis     
Abstract: As a new station structure, the column-free atrium style subway station deletes central columns and set up openings in the middle plate to expand the effective space and increase the efficiency of transfer. To understand the response characteristics of the column-free atrium style subway station with the action of an earthquake, the integral response displacement method suitable for the underground structure with a complex face was used for quasistatic seismic analysis, and the distribution of internal force is compared among large-span column-free atrium style subway stations, general column subway stations and column-free subway stations, all of which have the same face shape. The results show that if the face shape is identical, the axial face, shearing force and bending moment of a large-span column-free atrium style subway station are higher than those of a column-free station and a general column station; the weak position of a column-free atrium style subway station is the connection between the bottom plate and the side walls, and the connection between the middle plate and the side walls is more disadvantageous than traditional subway stations.
KeywordsSubway,   Integral response displacement method,   Column-free atrium style subway station,   Seismic analysis     
Cite this article:   
XU Yonghao .Study on Seismic Resistance of Column-free Atrium Style Subway Station Based on the Integral Response Displacement Method[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 77-85
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I6/77
 
No references of article
[1] LI Hu1, 2 HAN Gang1 HUANG Yongliang1 SONG Xie1 LI Dayong1.Study on Rapid Assessment of Battle-induced Structure Damage Based on the Subway Station Target[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 51-60
[2] XU Xianlei1 ZHENG Haoxiang2 LIU Yuhao2.Identification Method for Cracks in Tunnel Linings Based on Improved Chain Code Tracking Algorithm[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 90-99
[3] CHEN Fan1 HE Chuan1 HUANG Zhonghui2 MENG Qingjun2 LIU Chuankun1 WANG Shimin1.Study on the Adaptability and Selection of Multi-mode Tunnelling Equipment for Subway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 53-62
[4] LIU Zhiliang1 LIN Houlai1 LI Liang1 LI Dongxian1 GAO Yuan2 XU Liang1 HU Jun3.Analysis on the Reliability of Tunnel System Based on Multiple Response Surface Methodology and Monte Carlo Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 78-87
[5] MENG Xiancong1 ZHANG Xiedong1 WU Lin2 ZHU Haojie1 LI Zhifeng1.Analysis of the Dynamic Response of Twin-tunnel Rail Sleepers and Lining under the Action of Trains[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 99-106
[6] WEI Zhiyuan1 FENG Jimeng2 YU Longping2.Study on the Mechanical Behavior of the the Double-layer Arch Cover Initial Support during the Construction of Subway Stations by Arch-cover Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 265-274
[7] SHI Yufeng1,2 CAO Chengwei1,2 TAN Yifan3 XU Changjie1,2,4 ZHANG Lichen5 HUANG Yong5.Study on Dynamic Response and Long-term Settlement of Water-saturated Weathered Soft Rocks at the Base of Subway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 86-95
[8] FENG Huijun.Construction and Safety Control of New Metro Tunnels Passing under Existing Operational Metro Lines in Close Proximity[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 220-226
[9] ZHANG Chun ZHOU Yuxuan LI Dengpeng.Intelligent Reconstruction of the Digital Model of Metro Shield Tunnels with Disordered Erected Segment Ring Structure[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 80-86
[10] HE Leiming1 DENG Feifan2,3 JIA Peng2,3.Causes and Treatment Measures of Sudden Segment Damage Failures in a Shield Tunnel under Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 225-231
[11] HUANG Peng1,2 WEI Liangwen1,2 ZHANG Xuefu1,2.Study on Reinforcement of Large Arch Foot of Mined and Overlapped Metro Transfer Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 137-147
[12] ZHOU Wendi1,2 LIANG Qingguo1,2 ZHANG Jindong3.Analysis of the Deformation and Structural Stress of a Metro Station Constructed by Pile-Beam-Arch Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 121-128
[13] GUO Guibin1 JIN Shihe2 LIU Qi2 SUN Hongbin2.Study on Preparation of Synchronous Grouting Material from Excavated Red Sandstone in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 251-256
[14] ZHANG Longguan1 LIU Suimei1 LI Kaifu1 XU Jin2,3,4 WANG Shengnan3,5 LI Qiang3.Prediction of Shield Construction Risks in Subway Tunnelling Based on Fault Tree and Bayesian Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 21-29
[15] XU Youjun1,2 HUANG Zhengdong1,2 ZHANG Xu1,2 ZHANG Chao1,2 KANG Jiawang1,2 ZHOU Wei1.Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 96-103
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY