Study on Rapid Assessment of Battle-induced Structure Damage Based on the Subway Station Target
(1. Jinan Rail Transit Group Co., Ltd., Jinan 250014; 2. Shandong Rail Transit Survey and Design Institute Co., Ltd., Jinan 250014)
Download: PDF (2896KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Analytical research was conducted systematically on the battle-induced structure damage based on the subway station target, and combined with the common ways to strike the urban subway station structure with conventional weapons, a simple analysis of target characteristics was carried out and a calculation and assessment flow was established for the battle damage to the subway station structure. Based on the establishment of the criteria for damage, a more detailed analysis of battle-induced structure damage was conducted, key parameters, such as radius of collapse, peak value of equivalent uniformly distributed dynamic load at different areas, vibration acceleration and vibration time, were calculated, and calculation was illustrated according to the specific examples of penetration and explosion above the subway station. From the results of calculation, it can be seen that the established method and flow of calculation and assessment of battle-induced structure damage can rapidly and accurately evaluate the damage to subway stations and also provide a useful reference for research into the protection of subway stations and emergency repair and rescue after battle-induced structure damage.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Hu1
2 HAN Gang1 HUANG Yongliang1 SONG Xie1 LI Dayong1
KeywordsSubway station   Target characteristic analysis   Battle-induced structure damage calculation   Rapid damage assessment     
Abstract: Analytical research was conducted systematically on the battle-induced structure damage based on the subway station target, and combined with the common ways to strike the urban subway station structure with conventional weapons, a simple analysis of target characteristics was carried out and a calculation and assessment flow was established for the battle damage to the subway station structure. Based on the establishment of the criteria for damage, a more detailed analysis of battle-induced structure damage was conducted, key parameters, such as radius of collapse, peak value of equivalent uniformly distributed dynamic load at different areas, vibration acceleration and vibration time, were calculated, and calculation was illustrated according to the specific examples of penetration and explosion above the subway station. From the results of calculation, it can be seen that the established method and flow of calculation and assessment of battle-induced structure damage can rapidly and accurately evaluate the damage to subway stations and also provide a useful reference for research into the protection of subway stations and emergency repair and rescue after battle-induced structure damage.
KeywordsSubway station,   Target characteristic analysis,   Battle-induced structure damage calculation,   Rapid damage assessment     
Cite this article:   
LI Hu1, 2 HAN Gang1 HUANG Yongliang1 SONG Xie1 LI Dayong1 .Study on Rapid Assessment of Battle-induced Structure Damage Based on the Subway Station Target[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 51-60
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I6/51
 
No references of article
[1] CHENG Jianhua1,2 WENG Yingkang1 YE Yaqi YANG Xiaolin1,2 YAN Wenrong3 GUO Ruijing1.Study on the Impact of High-pressure Gas Pipeline Leakage and Explosion on the Roof Structure of Underlying Subway Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 151-159
[2] CHEN Yunyao.Risk Mitigation Measures and Excavation Analysis of Shield Launching beneath an Existing Metro Station on the First Terrace of the Yangtze River[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 249-258
[3] SONG Zhanping1,2,3 LI Xueli1 ZHANG Yuwei1,2,3 ZHONG Shiming1 SHI Wei4.Review and Prospect of the Mining Construction Methods for Subway Stations in China[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 1-15
[4] CHEN Weijie1 FU Zeng2 ZHU Taifeng1 YU Changyi2 SU Dong1,3 WANG Quansheng2.Numerical Simulation Study on the Load Bearing Performance of Segment-steel-concrete Composite Beams under Prestress[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 162-171
[5] GUO Chengxiang1 ZHANG Yanli4 HUANG Linchong2,4 HAN Bing1 LV Wenhua1 LIANG Yu2,3,4.Mechanical Behavior Analysis of CHC Steel-concrete Composite Joints in Prefabricated Subway Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 62-70
[6] LIU Zhaoyang1 JIANG Kai2 LIANG Yu2,3,4.Settlement Analysis of Existing Prefabricated Subway Stations Induced by Overburden Backfill Load Based on Kerr Foundation Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 71-78
[7] ZHANG Yu1 ZHOU Lu1 SUN Xiaohe2 LI Jun1 SHI Chenghua2 LIU Shengli.Research on Causes and Countermeasures of Water Leakage in Subway Tunnels in Coastal Area[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 234-424
[8] LIU Bingke1 WU Rui2 MA Jianfei2 HE Shaohui2 BAI Shouxing1 MIAO Pengbo1.Construction Risk Assessment for Reconstruction and Expansion of Long-term Operating Metro Stations Based on DBN Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 75-83
[9] WANG Ru LU Tongyang CHENG Kai.Study on Application Standardization of Construction Information Model for Subway Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 47-55
[10] WEI Zhiyuan1 FENG Jimeng2 YU Longping2.Study on the Mechanical Behavior of the the Double-layer Arch Cover Initial Support during the Construction of Subway Stations by Arch-cover Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 265-274
[11] HUANG Peng1,2 WEI Liangwen1,2 ZHANG Xuefu1,2.Study on Reinforcement of Large Arch Foot of Mined and Overlapped Metro Transfer Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 137-147
[12] ZHOU Wendi1,2 LIANG Qingguo1,2 ZHANG Jindong3.Analysis of the Deformation and Structural Stress of a Metro Station Constructed by Pile-Beam-Arch Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 121-128
[13] ZHANG Zilong1 JIANG Annan1 YU Hai2 WANG Feng2.Analysis of the Mechanical Response in the Construction of Large-Span Mined Metro Stations by the Arch-Cover Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 139-146
[14] CHEN Liang.Study on Selection of the Intermediate Pile Foundation of Subway Stations with Cut and Cover Top-down Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 166-173
[15] JIANG Pin LI Yuanfu.Study on Risk Assessment in Subway Station Construction Based on Principal Component Analysis[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 67-74
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY