Study on Application Standardization of Construction Information Model for Subway Stations
(School of Civil Engineering of Xi′an University of Architecture and Technology, Xi′an 710055)
Download: PDF (5021KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to solve the problems of heavy workloads, low efficiency, insufficient application of model data and poor effect of optimizing the construction scheme in the construction process of subway stations, the research is carried out from the perspective of application standardization of subway station information model with the construction contractor as the main application subject and the construction process as the main application line. Firstly, the application standardization process of the construction information model for subway stations is defined, which provides a general method for the construction contractor to apply the information model and optimize the construction scheme in the subway station construction. Secondly, the standard component design with less specifications, multiple combinations and multiple station calls are carried out. The standard component library management system is designed based on the Revit platform, and its management function is realized by using the secondary development technology of Revit API and MySQL database. Finally, taking the Nanmen Station Project of Wuxi Metro Line S1 as an example, the standard component library is called to design the standard site layout scheme, verify the efficiency of the application standardization process and the standard component design and management, and improve the application quality of the construction information model.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Ru LU Tongyang CHENG Kai
KeywordsSubway stations   Construction information model   Application standardization process   Standard compo? nent design   Secondary development of Revit   Standard site layout     
Abstract: In order to solve the problems of heavy workloads, low efficiency, insufficient application of model data and poor effect of optimizing the construction scheme in the construction process of subway stations, the research is carried out from the perspective of application standardization of subway station information model with the construction contractor as the main application subject and the construction process as the main application line. Firstly, the application standardization process of the construction information model for subway stations is defined, which provides a general method for the construction contractor to apply the information model and optimize the construction scheme in the subway station construction. Secondly, the standard component design with less specifications, multiple combinations and multiple station calls are carried out. The standard component library management system is designed based on the Revit platform, and its management function is realized by using the secondary development technology of Revit API and MySQL database. Finally, taking the Nanmen Station Project of Wuxi Metro Line S1 as an example, the standard component library is called to design the standard site layout scheme, verify the efficiency of the application standardization process and the standard component design and management, and improve the application quality of the construction information model.
KeywordsSubway stations,   Construction information model,   Application standardization process,   Standard compo? nent design,   Secondary development of Revit,   Standard site layout     
Cite this article:   
WANG Ru LU Tongyang CHENG Kai .Study on Application Standardization of Construction Information Model for Subway Stations[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 47-55
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/47
 
No references of article
[1] CHENG Jianhua1,2 WENG Yingkang1 YE Yaqi YANG Xiaolin1,2 YAN Wenrong3 GUO Ruijing1.Study on the Impact of High-pressure Gas Pipeline Leakage and Explosion on the Roof Structure of Underlying Subway Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 151-159
[2] CHEN Yunyao.Risk Mitigation Measures and Excavation Analysis of Shield Launching beneath an Existing Metro Station on the First Terrace of the Yangtze River[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 249-258
[3] SONG Zhanping1,2,3 LI Xueli1 ZHANG Yuwei1,2,3 ZHONG Shiming1 SHI Wei4.Review and Prospect of the Mining Construction Methods for Subway Stations in China[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 1-15
[4] CHEN Weijie1 FU Zeng2 ZHU Taifeng1 YU Changyi2 SU Dong1,3 WANG Quansheng2.Numerical Simulation Study on the Load Bearing Performance of Segment-steel-concrete Composite Beams under Prestress[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 162-171
[5] GUO Chengxiang1 ZHANG Yanli4 HUANG Linchong2,4 HAN Bing1 LV Wenhua1 LIANG Yu2,3,4.Mechanical Behavior Analysis of CHC Steel-concrete Composite Joints in Prefabricated Subway Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 62-70
[6] LIU Zhaoyang1 JIANG Kai2 LIANG Yu2,3,4.Settlement Analysis of Existing Prefabricated Subway Stations Induced by Overburden Backfill Load Based on Kerr Foundation Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 71-78
[7] ZHANG Yu1 ZHOU Lu1 SUN Xiaohe2 LI Jun1 SHI Chenghua2 LIU Shengli.Research on Causes and Countermeasures of Water Leakage in Subway Tunnels in Coastal Area[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 234-424
[8] LIU Bingke1 WU Rui2 MA Jianfei2 HE Shaohui2 BAI Shouxing1 MIAO Pengbo1.Construction Risk Assessment for Reconstruction and Expansion of Long-term Operating Metro Stations Based on DBN Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 75-83
[9] LI Hu1, 2 HAN Gang1 HUANG Yongliang1 SONG Xie1 LI Dayong1.Study on Rapid Assessment of Battle-induced Structure Damage Based on the Subway Station Target[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 51-60
[10] WEI Zhiyuan1 FENG Jimeng2 YU Longping2.Study on the Mechanical Behavior of the the Double-layer Arch Cover Initial Support during the Construction of Subway Stations by Arch-cover Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 265-274
[11] HUANG Peng1,2 WEI Liangwen1,2 ZHANG Xuefu1,2.Study on Reinforcement of Large Arch Foot of Mined and Overlapped Metro Transfer Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 137-147
[12] ZHOU Wendi1,2 LIANG Qingguo1,2 ZHANG Jindong3.Analysis of the Deformation and Structural Stress of a Metro Station Constructed by Pile-Beam-Arch Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 121-128
[13] ZHANG Zilong1 JIANG Annan1 YU Hai2 WANG Feng2.Analysis of the Mechanical Response in the Construction of Large-Span Mined Metro Stations by the Arch-Cover Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 139-146
[14] CHEN Liang.Study on Selection of the Intermediate Pile Foundation of Subway Stations with Cut and Cover Top-down Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 166-173
[15] JIANG Pin LI Yuanfu.Study on Risk Assessment in Subway Station Construction Based on Principal Component Analysis[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 67-74
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY