Study on Large Deformation Control Method and Structural Mechanical Characteristics of Shanyang Tunnel in Soft Rocks
(1. China Railway 23rd Bureau Group Corporation Limited, Chengdu 610072; 2. State Key Laboratory of Hydraulics and Mountain River Engineering Sichuan University, Chengdu 610065)
Download: PDF (6621KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to effectively control the large deformation of soft rock in the thin-bedded broken shale section in the Shanyang Tunnel on Dali-Ruili Railway, a construction method has been proposed that is comprised of surrounding rock pre-reinforcement by curtain grouting, advance middle pipe umbrella and advance water exploring and pressure relief holes and the three-bench mechanical excavation. The side wall excavation curvature is increased to change the U-shaped excavation section to egg-shaped excavation section, the deformation allowance increases from 10 cm to 50 cm, and the initial support structure changes from the I25 single-layer steel rib with 1 m spacing to the double-layer HW175 steel rib with 0.6 m spacing. All these measures have solved the challenging problems such as steel rib distortion and cross section intrusion. According to force monitoring on the support structure on site, the forces on some of the steel ribs of double-layer initial support exceed their yield strength, mainly because the support structure sustains excessive force while the surrounding rock load is not adequately released. It is recommended to release a part of the surrounding rock pressure before construction of the second layer of initial support.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
TIAN Baohua1 ZHAO Yongming1 WU Xingzhou1 ZHANG Biao1
2 GAO Song1
KeywordsDali-Ruili Railway   Shanyang Tunnel   Thin-bedded shale   Double-layer support   Site monitoring     
Abstract: In order to effectively control the large deformation of soft rock in the thin-bedded broken shale section in the Shanyang Tunnel on Dali-Ruili Railway, a construction method has been proposed that is comprised of surrounding rock pre-reinforcement by curtain grouting, advance middle pipe umbrella and advance water exploring and pressure relief holes and the three-bench mechanical excavation. The side wall excavation curvature is increased to change the U-shaped excavation section to egg-shaped excavation section, the deformation allowance increases from 10 cm to 50 cm, and the initial support structure changes from the I25 single-layer steel rib with 1 m spacing to the double-layer HW175 steel rib with 0.6 m spacing. All these measures have solved the challenging problems such as steel rib distortion and cross section intrusion. According to force monitoring on the support structure on site, the forces on some of the steel ribs of double-layer initial support exceed their yield strength, mainly because the support structure sustains excessive force while the surrounding rock load is not adequately released. It is recommended to release a part of the surrounding rock pressure before construction of the second layer of initial support.
KeywordsDali-Ruili Railway,   Shanyang Tunnel,   Thin-bedded shale,   Double-layer support,   Site monitoring     
Cite this article:   
TIAN Baohua1 ZHAO Yongming1 WU Xingzhou1 ZHANG Biao1, 2 GAO Song1 .Study on Large Deformation Control Method and Structural Mechanical Characteristics of Shanyang Tunnel in Soft Rocks[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 242-251
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I3/242
 
No references of article
[1] YAN Bo1 ZHANG Junru2 ZHANG Xinjin1 PENG Lei1 Ning Bo1.A Study on the Stability of Surrounding Rocks in Construction of Undercrossing Tunnels with Super-large Section Based on Radial Displacement Release Rate of Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 115-124
[2] WEI Zhiyuan1 FENG Jimeng2 YU Longping2.Study on the Mechanical Behavior of the the Double-layer Arch Cover Initial Support during the Construction of Subway Stations by Arch-cover Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 265-274
[3] WANG Huaizheng1 SONG Zhanping1,2 ZHANG Xuewen3 TIAN Xiaoxu1,2 PAN Hongwei4.Optimization and Application of the Construction Scheme for Large-section Tunnels in Water-rich and Weakly Cemented Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 210-219
[4] ZHOU Wendi1,2 LIANG Qingguo1,2 ZHANG Jindong3.Analysis of the Deformation and Structural Stress of a Metro Station Constructed by Pile-Beam-Arch Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 121-128
[5] PAN Weiqiang1 JIAO Bochang2 LIU Xian2 ZENG Hua3 JI Maojie3.Field Test Research on the Contact Pressure and Stress Characteristics of Jacked Steel Pipes with Deep-buried Depth and Large-section[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 104-113
[6] LI Pengfei1 HUANG Jingluo1,2 CHEN Keyi1 TONG Lei2.Statistical Analysis on Temporal and Spatial Characteristics of the Axial Force of Anchor Bolts in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 227-236
[7] QIU Wenge WAN Shifu GAO Ganggang ZHAO Hailin QI Xingxin.tudy on the Control Measures against Ground Settlement Induced by Shield Tunnel Construction underneath Railway Throat in Sandy Cobble Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 37-45
[8] GU Zhenxue1 LOU Weizhong2 CHENG Yubo1 LI Yiwei1 SONG Dewei1 SUN Yang1.Analysis on Deformation Behaviors of Diaphragm Walls of an Extra-long Special-shaped Deep Foundation Pit in Nanjing Soft Soil Area[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 182-189
[9] YANG Guolin1 HU Min1 SHEN Zongqiu2 YANG Jie2.Research on Bearing Modes of Compound Middle-wall of Multi-arch Tunnels with Large Spans[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 136-141
[10] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 133-139
[11] WANG Keyi1 XU Dongqiang2 SUN Xiaoshan2.Study of the Invert Installation Issues for a Three-Lane Road Tunnel in Surrounding Rock of Grade Ⅲ1[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 103-109
[12] .Deformation Control Techniques for the Yanmenguan Tunnel in Squeezing Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 174-180
[13] LAI Jinxing1 QIU Junling1 NIU Fanyuan1,2 FAN Haobo1,4 WANG Ke1,3.The Effects of Treatment of Collapses in Shallow-Buried Loess Tunnels with Unsymmetrical Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 194-201
[14] FENG Qiang- 1 Liu-Wei-Wei- 1 Jiang-Bin-Song- 2.Study on the Temperature Field and Insulation Layer Thickness of the Yuximolegai Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 78-84
[15] HAN Xian-Min- Sun-Ming-Lei- Zhu-Yong-Quan.Application of Combined Clapboard and Vent-Pipe Ventilation Techniques in the Construction of Extra-Long Tunnels on a Plateau[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 208-215
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY