Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2011, Vol. 48 Issue (4) :44-48    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study of Risk Management in Subway Construction Projects
(Guangzhou Metro Construction Enterprise General Staff, Guangzhou  510380)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract There are many uncertain risks in subway projects, so it is very important to conduct risk management. A framework of risk management for subway construction is proposed based on experience accumulated and lessons learned both at home and abroad. Topics addressed include risk identification, risk analysis, risk assessment, risk response and risk prevention in order to lower risk levels.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
FANG 恩Quan
KeywordsSubway construction   Security risk management   Risk assessment     
Abstract: There are many uncertain risks in subway projects, so it is very important to conduct risk management. A framework of risk management for subway construction is proposed based on experience accumulated and lessons learned both at home and abroad. Topics addressed include risk identification, risk analysis, risk assessment, risk response and risk prevention in order to lower risk levels.
KeywordsSubway construction,   Security risk management,   Risk assessment     
published: 2010-12-28
Cite this article:   
FANG 恩Quan .Study of Risk Management in Subway Construction Projects[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(4): 44-48
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I4/44
 
No references of article
[1] DING Wanqin1 LIU Yuan2 WANG Wendong1 ZHOU Yunxin3 LI Haibing2 RUI Yi4.Dynamic Risk Assessment of Water Inrush and Mud Burst in Tunnels Based on Fuzzy Two-dimensional Cloud Probability Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 261-268
[2] LIU Bingke1 WU Rui2 MA Jianfei2 HE Shaohui2 BAI Shouxing1 MIAO Pengbo1.Construction Risk Assessment for Reconstruction and Expansion of Long-term Operating Metro Stations Based on DBN Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 75-83
[3] TANG Yan.Research on Risk Assessment and Management Methods for Projects of Railway Tunnels Passing under Expressways[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 220-226
[4] HE Leping1 XU Yingdong1 HU Qijun1 CAI Qijie2.Assessment of Large Deformation Risk in Soft Rock Tunnels Based on Game Theory - Cloud Model[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 85-94
[5] GAO Xin WANG Wenjuan LI Qingfei FENG Shijie WU Qi.Research on the Routing Scheme of a Double Shield TBM Passing through the Metro Station[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 56-64
[6] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[7] WANG Chunhe1,2 ZHU Fuqiang3 LUO Xing4 ZHANG Chuankui1,2 TIAN Junling3 LI Hepeng2 GUO Yifei4.Study on Construction Risk Assessment of Tunnel Reconstruction and Expansion Works[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 63-70
[8] JIANG Pin LI Yuanfu.Study on Risk Assessment in Subway Station Construction Based on Principal Component Analysis[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 67-74
[9] YAN Xidong1 GAO Jun1 HAN Fei2 LI Zheng1.Risk Evaluation of the Tunnel Passing through Active Fault Zone and Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 10-22
[10] YANG Runxia.Application of Radar Chart Method to the Karst Tunnel in Complex Geology[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 125-129
[11] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[12] XUE Yadong1,2 LI Shuobiao3 DING Wenqiang1,2 FANG Chao4.Risk Evaluation System for the Impacts of a Concealed Karst Cave on Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 41-47
[13] LUO Yong- 1 Li-Yu-Wen- 2 Yuan-Jia-Wei- 1 Liu-Da-Gang- 1 Wang-Ming-Nian.Study on Risk Assessment of Highway Tunnel Operational Safety[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 25-30
[14] GAO Bingli REN Jianxi.Safety Risk Assessment for Adjacent Underground Pipelines in Metro Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 118-123
[15] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY