Abstract There are many uncertain risks in subway projects, so it is very important to conduct risk management. A framework of risk management for subway construction is proposed based on experience accumulated and lessons learned both at home and abroad. Topics addressed include risk identification, risk analysis, risk assessment, risk response and risk prevention in order to lower risk levels.
Keywords :
Subway construction
Security risk management
Risk assessment
Abstract :
There are many uncertain risks in subway projects, so it is very important to conduct risk management. A framework of risk management for subway construction is proposed based on experience accumulated and lessons learned both at home and abroad. Topics addressed include risk identification, risk analysis, risk assessment, risk response and risk prevention in order to lower risk levels.
Keywords :
Subway construction ,
Security risk management ,
Risk assessment
published: 2010-12-28
[1]
WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2. [J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[2]
XUE Yadong1,2 LI Shuobiao3 DING Wenqiang1,2 FANG Chao4.Risk Evaluation System for the Impacts of a Concealed Karst Cave on Tunnel Construction [J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 41-47
[3]
LUO Yong- 1 Li-Yu-Wen- 2 Yuan-Jia-Wei- 1 Liu-Da-Gang- 1 Wang-Ming-Nian.Study on Risk Assessment of Highway Tunnel Operational Safety [J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 25-30
[4]
GAO Bingli REN Jianxi.Safety Risk Assessment for Adjacent Underground Pipelines in Metro Construction [J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 118-123
[5]
Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[6]
Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[7]
Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
[8]
Li Xinyu, Zhang Dingli, Fang Qian, Song Haoran.On Water Burst Patterns in Underwater Tunnels [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 24-31
[9]
Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[10]
Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48
[11]
Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
[12]
Zhang Boyang1, Zhao Xiaopeng1, Zhang Yaguo2, Chen Yu1.Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 55-61
[13]
Li Yongkuan1,2 Zhang Dingli2 Fang Qian1.Assessment and Analysis of the Risks in Whole Construction Process of a Subsea Tunnel Project [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(3): 47-54
[14]
Li Yufeng1,2, Peng Limin1, Lei Mingfeng1,2.Dynamics Issues Regarding High-Speed Railway Crossing Tunnels [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 8-15
[15]
Zhang Han1,2, Li Yingming1,3, Ren Fangtao2, Yang Mingdong3.Elasto-Plastic Analysis of the Surrounding Rock of a Tunnel/Roadway Based on the Zienkiewicz-Pande Criterion [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 30-35