MODERN TUNNELLING TECHNOLOGY 2012, Vol. 49 Issue (2) :142-146    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Protection Scheme for a Shallow-Bored Tunnel Under a Gas Pipeline with Intermediate High Pressure
(Tunneling Company of Shenzhen Municipal Engineering Corporation, Shenzhen 518000)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract During metro construction, underground pipelines, especially gas pipelines, are often encountered in very close proximity, which significantly affects the safety and construction schedule of a bored metro tunnel. As for the Antuoshan to Qiaoxiang section of Lot 2222 of the Shenzhen Metro line 2, horizontal jet grouting piles and deep-hole curtain grouting, as well as pipeline hanging, were undertaken to effectively control settlement. This paper presents a comparison of various protection schemes as well as their implementation and effects.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHU Kang-Ning
Keywords Shallow bored tunnel   Gas pipeline with intermediate pressure   Horizontal jet grouting   Deep-hole curtain grouting   Pipeline hanging   Freezing method     
Abstract: During metro construction, underground pipelines, especially gas pipelines, are often encountered in very close proximity, which significantly affects the safety and construction schedule of a bored metro tunnel. As for the Antuoshan to Qiaoxiang section of Lot 2222 of the Shenzhen Metro line 2, horizontal jet grouting piles and deep-hole curtain grouting, as well as pipeline hanging, were undertaken to effectively control settlement. This paper presents a comparison of various protection schemes as well as their implementation and effects.
Keywords Shallow bored tunnel,   Gas pipeline with intermediate pressure,   Horizontal jet grouting,   Deep-hole curtain grouting,   Pipeline hanging,   Freezing method     
published: 2012-02-16
Cite this article:   
ZHU Kang-Ning .Protection Scheme for a Shallow-Bored Tunnel Under a Gas Pipeline with Intermediate High Pressure[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(2): 142-146
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I2/142
 
No references of article
[1] SHI Yufeng1,2 CAI Jiacheng1 ZHANG Tao3 ZHANG Hanqiu4 LI Junxian1 GU Dajun5.Test and Analysis of the Effect of the Freezing Construction of Subway Cross Passage on Adjacent Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 190-199
[2] HAN Xiaoming1,2 HE Yuan1,2 ZHANG Feilei2,3,4.Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 227-235
[3] CHEN Jingang GUO Qiang ZHOU Hailong HUAI Wenbao DONG Xiaoqi.Construction Scheme and Application Analysis of Synchronous Construction of Subway Shield Tunnels and Freezing Reinforcement for Cross Passages[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 233-240
[4] PAN Xudong1 BAI Yunlong1 BAI Yunfei2 ZHANG Zhiqiang2 LIAO Lin1.Study on the Influence Pattern of Seepage Field on Temperature Field in the Construction of the Metro Cross Passage by Freezing Method in Water-Rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 122-128
[5] ZHAI Qiang GU Weihong JIN Zhaoqin.Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 57-66
[6] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[7] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
[8] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[9] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[10] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[11] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[12] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
[13] Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48
[14] Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
[15] Zhang Boyang1, Zhao Xiaopeng1, Zhang Yaguo2, Chen Yu1.Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 55-61
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY