Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2012, Vol. 49 Issue (3) :193-197    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Force Analysis of the Disc Cutter on a TBM
School of Mechanical Engineering, Jiangsu University, Zhenjiang 212013
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Studying the force of disc cutters in the process of breaking rock can optimize the design and improve the life span of disc cutters. The finite element model of a disc cutter in the process of breaking rock was created by ABAQUS, and the model was dynamically simulated and analyzed. The results show that hydraulic jacks of a full face rock tunnel machine need to constantly increase pressure in order to maintain the excavation speed and the results that verify that the maximum instantaneous contact force is 2~3 times larger than the average contact force. Also, it was determined that ABAQUS can simulate the phenomenon of the ballast splashed out of the rock.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: Studying the force of disc cutters in the process of breaking rock can optimize the design and improve the life span of disc cutters. The finite element model of a disc cutter in the process of breaking rock was created by ABAQUS, and the model was dynamically simulated and analyzed. The results show that hydraulic jacks of a full face rock tunnel machine need to constantly increase pressure in order to maintain the excavation speed and the results that verify that the maximum instantaneous contact force is 2~3 times larger than the average contact force. Also, it was determined that ABAQUS can simulate the phenomenon of the ballast splashed out of the rock.
Keywords:   
Cite this article:   
.Force Analysis of the Disc Cutter on a TBM[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(3): 193-197
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I3/193
 
No references of article
[1] ZHANG Yuchi1, 2 TAN Qing2 LAO Tongbing2.Design and Study of a Rock Breaking Test Device of Disc Cutters under Temperature-stress Coupling Field[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 158-163
[2] ZHU Qinghua1 HUANG Jianfeng2 HE Yong3 SHAO Yong3.Analysis of the Stability of River-crossing Pipelines against Uplift Based on the Strength Reduction Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 94-98
[3] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 79-87
[4] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 146-158
[5] MA Guomin1 DING Wenqi2,3 WEI Yuliang2,3 JIANG Hong4 JIN Yuelang2,3.3D FEM Analysis of the Positive Bending Capacity for Rectangular Shield Tunnel Segment Joints with a Connector Box[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 122-131
[6] ZHOU Lei ZHU Zheming LI Yuanxin.Influence of Principal Stress Orientation on Tunnel Stability Based on the Finite-Element Strength Reduction Method[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 61-67
[7] Wang Kongqian.Influence of Formation Dip Angle on the Geostress Calculation of a Transversely Isotropic Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(5): 75-79
[8] Wang Dongyuan1 Gao Zhirong1 Zhu Yongquan2 Zhang Lianghui3.Simulation Analysis of the Excavation Deformation of a Reinforced Subway Cross-Passage in Soft Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(5): 129-134
[9] Li De-Wu-1,2, MA Wei-Gong-3.Elasto-viscoplastic Finite Element Analysis of the Installation Time of a Secondary Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(4): 6-9
[10] ZHAO YANG 1, LU LING 2. Formation Mechanism of Gases in Tunnels Embedded in Non-coal Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2011,48(3): 40-45
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY